PLYMOUTH, VT · Windsor County
LEDGES SYSTEM 1 Water System
Consumer Confidence Report status
LEDGES SYSTEM 1 must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 open health-based violation for LEDGES SYSTEM 1, alongside 1 other open item.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Vermont’s official records. Always confirm current status with Vermont before making decisions based on this information.
System facts
- System ID (PWSID)
- VT0005598
- System type
- Community Water System
- Population served
- 252
- Service connections
- 45
- Ownership
- privately owned
- Water source
- groundwater (wells)
LEDGES SYSTEM 1 is one of 498 community water systems in Vermont in the 500 or fewer people size category, serving 252 people from groundwater.
As of August 1, 2026, its federal record holds 107 entries between 1997 and 2025, of which 1 health-based item remains open, alongside 1 other open entry.
Of the 107, 95 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves volatile organic chemicals, synthetic organic chemicals, and inorganic chemicals.
Violation history
Consumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025 – October 23, 2025
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—2,4-D
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—LASSO
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Atrazine
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Picloram
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Simazine
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Endrin
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Nitrate
January 1, 2025 – March 31, 2025
ResolvedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024
AddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – December 4, 2024
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2023
UnaddressedMonitoring, Regular
—Nitrate
January 1, 2023 – March 31, 2023
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2022 – July 15, 2022
ResolvedMonitoring, Regular
—Antimony, Total
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Nickel
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Mercury
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Chromium
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Barium
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Arsenic
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Fluoride
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—CYANIDE
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Selenium
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Thallium, Total
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Beryllium, Total
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Nitrate
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—1,2-Dichloroethane
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Xylenes, Total
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—DICHLOROMETHANE
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—o-Dichlorobenzene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—p-Dichlorobenzene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Vinyl chloride
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Carbon tetrachloride
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—1,2-Dichloropropane
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Tetrachloroethylene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—CHLOROBENZENE
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Benzene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Toluene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Ethylbenzene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Styrene
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Nitrate
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Source Water (GWR)
—E. COLI
November 25, 2019 – February 26, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – October 31, 2019
ResolvedMonitoring, Regular
—Nitrate
January 1, 2019 – March 31, 2019
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2018 – January 22, 2019
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2016 – September 26, 2018
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2015 – May 31, 2015
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
December 1, 2014 – December 31, 2014
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
November 1, 2014 – November 25, 2014
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
October 1, 2013 – October 31, 2013
ResolvedMonitoring, Regular
—Styrene
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—Benzene
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—CHLOROBENZENE
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—1,2-Dichloropropane
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—1,2-Dichloroethane
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—p-Dichlorobenzene
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Regular
—Styrene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Ethylbenzene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Toluene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Benzene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—CHLOROBENZENE
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Tetrachloroethylene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—o-Dichlorobenzene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—DICHLOROMETHANE
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Xylenes, Total
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Trichloroethylene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—1,2-Dichloropropane
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Carbon tetrachloride
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—1,2-Dichloroethane
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Vinyl chloride
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—p-Dichlorobenzene
April 1, 2012 – June 30, 2012
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2008 – July 31, 2008
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2007 – July 31, 2007
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
August 15, 2000 – September 14, 2000
ArchivedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
August 1, 2000 – August 31, 2000
ResolvedMonitoring, Regular
—Nitrate
January 1, 1997 – December 31, 1997
Resolved
Resolved addressed and confirmed by the stateAddressed corrective action reported, pending final confirmationUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| July 1, 2025 – October 23, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Nitrate | — | Resolved |
| October 17, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Addressed |
| July 1, 2024 – December 4, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2023 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Unaddressed |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 2022 – July 15, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Antimony, Total | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Nickel | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Mercury | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Chromium | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Barium | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Arsenic | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Fluoride | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | CYANIDE | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Selenium | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Thallium, Total | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Benzene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Toluene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Nitrate | — | Resolved |
| November 25, 2019 – February 26, 2020 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| October 1, 2019 – October 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2019 – March 31, 2019 | Monitoring, Regular | Nitrate | — | Archived |
| July 1, 2018 – January 22, 2019 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| October 1, 2016 – September 26, 2018 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| May 1, 2015 – May 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2014 – December 31, 2014 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2014 – November 25, 2014 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 2013 – October 31, 2013 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | Styrene | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | Benzene | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Styrene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Toluene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Benzene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| July 1, 2008 – July 31, 2008 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2007 – July 31, 2007 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| August 15, 2000 – September 14, 2000 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
| August 1, 2000 – August 31, 2000 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 1997 – December 31, 1997 | Monitoring, Regular | Nitrate | — | Resolved |
Resolved addressed and confirmed by the stateAddressed corrective action reported, pending final confirmationUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- January 28, 2026State Public Notification requested1 linked violation
- January 28, 2026State Formal Notice of Violation issued1 linked violation
- October 23, 2025State Compliance achieved1 linked violation
- October 13, 2025State Technical Assistance Visit1 linked violation
- October 13, 2025State Formal Notice of Violation issued1 linked violation
- May 19, 2025State Compliance achieved25 linked violations
- May 14, 2025State Public Notification requested1 linked violation
- May 14, 2025State Technical Assistance Visit1 linked violation
- May 14, 2025State Other25 linked violations
- May 14, 2025State Formal Notice of Violation issued1 linked violation
- May 14, 2025State Public Notification requested25 linked violations
- May 14, 2025State Formal Notice of Violation issued25 linked violations
- May 14, 2025State Technical Assistance Visit25 linked violations
- May 5, 2025State Compliance achieved1 linked violation
- January 30, 2025State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- January 30, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 23, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- December 4, 2024State Compliance achieved1 linked violation
- December 4, 2024State Public Notification received1 linked violation
- November 1, 2024State Technical Assistance Visit1 linked violation
- November 1, 2024State Public Notification requested1 linked violation
- November 1, 2024State Formal Notice of Violation issued1 linked violation
- November 1, 2024State Formal Notice of Violation issued1 linked violation
- December 15, 2023State Technical Assistance Visit1 linked violation
- December 15, 2023State Formal Notice of Violation issued1 linked violation
- June 5, 2023State Compliance achieved1 linked violation
- May 12, 2023State Other1 linked violation
- May 12, 2023State Technical Assistance Visit1 linked violation
- May 12, 2023State Public Notification requested1 linked violation
- May 12, 2023State Formal Notice of Violation issued1 linked violation
- December 22, 2022State Compliance achieved13 linked violations
- October 19, 2022State Other1 linked violation
- October 19, 2022State Formal Notice of Violation issued1 linked violation
- October 19, 2022State Technical Assistance Visit1 linked violation
- October 19, 2022State Public Notification requested1 linked violation
- October 19, 2022State Formal Notice of Violation issued1 linked violation
- October 19, 2022State Other1 linked violation
- October 19, 2022State Technical Assistance Visit1 linked violation
- October 19, 2022State Public Notification requested10 linked violations
- October 19, 2022State Formal Notice of Violation issued10 linked violations
- October 19, 2022State Other10 linked violations
- October 19, 2022State Technical Assistance Visit10 linked violations
- October 19, 2022State Public Notification requested1 linked violation
- October 19, 2022State Formal Notice of Violation issued1 linked violation
- October 19, 2022State Other1 linked violation
- October 19, 2022State Technical Assistance Visit1 linked violation
- October 19, 2022State Public Notification requested1 linked violation
- September 13, 2022State Formal Notice of Violation issued1 linked violation
- September 13, 2022State Technical Assistance Visit1 linked violation
- July 20, 2022State Public Notification received1 linked violation
- July 15, 2022State Compliance achieved1 linked violation
- June 28, 2021State Compliance achieved1 linked violation
- June 18, 2021State Technical Assistance Visit1 linked violation
- June 18, 2021State Public Notification requested2 linked violations
- June 18, 2021State Formal Notice of Violation issued1 linked violation
- June 18, 2021State Other4 linked violations
- April 16, 2021State Technical Assistance Visit1 linked violation
- April 16, 2021State Formal Notice of Violation issued1 linked violation
- March 15, 2021State Compliance achieved21 linked violations
- March 4, 2021State Other21 linked violations
- March 4, 2021State Technical Assistance Visit21 linked violations
- March 4, 2021State Public Notification requested21 linked violations
- March 4, 2021State Formal Notice of Violation issued21 linked violations
- September 28, 2020State Compliance achieved1 linked violation
- September 8, 2020State Public Notification requested1 linked violation
- September 8, 2020State Formal Notice of Violation issued1 linked violation
- September 8, 2020State Other1 linked violation
- September 8, 2020State Technical Assistance Visit1 linked violation
- May 12, 2020State Compliance achieved1 linked violation
- February 26, 2020State Compliance achieved1 linked violation
- February 18, 2020State Public Notification requested1 linked violation
- February 18, 2020State Formal Notice of Violation issued1 linked violation
- January 2, 2020State Formal Notice of Violation issued1 linked violation
- January 2, 2020State Public Notification requested1 linked violation
- September 3, 2019State Compliance achieved4 linked violations
- June 26, 2019State Public Notification received1 linked violation
- May 31, 2019State Formal Notice of Violation issued1 linked violation
- May 31, 2019State Other1 linked violation
- May 31, 2019State Technical Assistance Visit1 linked violation
- May 31, 2019State Public Notification requested1 linked violation
- May 29, 2019State Compliance achieved1 linked violation
- January 22, 2019State Public Notification received1 linked violation
- January 22, 2019State Compliance achieved1 linked violation
- December 31, 2018State Formal Notice of Violation issued1 linked violation
- December 31, 2018State Public Notification requested1 linked violation
- September 26, 2018State Compliance achieved2 linked violations
- May 7, 2018State Compliance achieved21 linked violations
- March 27, 2018State Public Notification received1 linked violation
- November 30, 2017State Technical Assistance Visit1 linked violation
- November 30, 2017State Formal Notice of Violation issued1 linked violation
- November 30, 2017State Public Notification requested1 linked violation
- November 1, 2017State Formal Notice of Violation issued1 linked violation
- November 1, 2017State Technical Assistance Visit1 linked violation
- November 1, 2017State Public Notification requested1 linked violation
- October 27, 2017State Public Notification requested1 linked violation
- October 27, 2017State Formal Notice of Violation issued1 linked violation
- September 13, 2017State Compliance achieved1 linked violation
- November 15, 2016State Public Notification requested1 linked violation
- November 15, 2016State Technical Assistance Visit1 linked violation
- November 15, 2016State Formal Notice of Violation issued1 linked violation
- October 12, 2016State Compliance achieved1 linked violation
- October 11, 2016State Technical Assistance Visit1 linked violation
- October 11, 2016State Formal Notice of Violation issued1 linked violation
- October 4, 2016State Public Notification received1 linked violation
- January 21, 2016State Compliance achieved1 linked violation
- July 8, 2015State Public Notification requested1 linked violation
- July 8, 2015State Formal Notice of Violation issued1 linked violation
- June 17, 2015State Public Notification received1 linked violation
- June 17, 2015State Compliance achieved1 linked violation
- February 13, 2015State Formal Notice of Violation issued1 linked violation
- February 13, 2015State Public Notification requested1 linked violation
- November 25, 2014State Compliance achieved1 linked violation
- November 20, 2014State Public Notification requested1 linked violation
- November 20, 2014State Boil Water Order1 linked violation
- November 20, 2014State Formal Notice of Violation issued1 linked violation
- November 20, 2014State Technical Assistance Visit1 linked violation
- November 19, 2014State Public Notification received1 linked violation
- June 27, 2014State Public Notification received21 linked violations
- May 9, 2014State Compliance achieved1 linked violation
- April 8, 2014State Compliance achieved21 linked violations
- January 7, 2014State Public Notification received1 linked violation
- November 6, 2013State Public Notification requested1 linked violation
- November 6, 2013State Formal Notice of Violation issued1 linked violation
- September 5, 2013State Technical Assistance Visit21 linked violations
- September 5, 2013State Public Notification requested21 linked violations
- September 5, 2013State Formal Notice of Violation issued21 linked violations
- May 15, 2013State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- May 15, 2013State Public Notification received21 linked violations
- September 18, 2012State Public Notification requested21 linked violations
- September 18, 2012State Formal Notice of Violation issued21 linked violations
- September 18, 2012State Technical Assistance Visit21 linked violations
- June 20, 2012State Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- June 20, 2012State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 20, 2012State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- June 20, 2012State Othergeneral compliance action — not tied to a specific violation on record
- August 7, 2008State Public Notification received1 linked violation
- August 4, 2008State Technical Assistance Visit1 linked violation
- August 4, 2008State Public Notification requested1 linked violation
- August 4, 2008State Boil Water Order1 linked violation
- August 4, 2008State Formal Notice of Violation issued1 linked violation
- September 13, 2007State Public Notification received1 linked violation
- September 10, 2007State Technical Assistance Visit1 linked violation
- September 10, 2007State Public Notification requested1 linked violation
- September 10, 2007State Boil Water Order1 linked violation
- September 10, 2007State Formal Notice of Violation issued1 linked violation
- August 7, 2007State Public Notification requested1 linked violation
- August 7, 2007State Technical Assistance Visit1 linked violation
- August 7, 2007State Boil Water Order2 linked violations
- August 7, 2007State Formal Notice of Violation issued1 linked violation
- August 4, 2007State Public Notification received1 linked violation
- October 1, 2004State Violation/Reminder Notice1 linked violation
- October 1, 2004State Boil Water Order1 linked violation
- October 1, 2004State Public Notification requested1 linked violation
- September 21, 2004State Public Notification received1 linked violation
- October 1, 2003State Violation/Reminder Notice2 linked violations
- September 5, 2003State Public Notification received1 linked violation
- September 15, 2000State Public Notification requested2 linked violations
- September 15, 2000State Violation/Reminder Notice1 linked violation
- September 15, 2000State Boil Water Order1 linked violation
- August 11, 2000State Public Notification received2 linked violations
- January 1, 1998State Violation/Reminder Notice1 linked violation
- January 1, 1998State Compliance achieved1 linked violation
- January 1, 1998State Compliance achieved1 linked violation
- January 1, 1998State Public Notification received1 linked violation
- January 1, 1998State Public Notification requested1 linked violation
- January 1, 1998State Public Notification requested1 linked violation
- January 1, 1998State Violation/Reminder Notice1 linked violation
- January 1, 1992State Violation/Reminder Notice2 linked violations
- January 1, 1992State Public Notification requested2 linked violations
- June 1, 1986State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 1, 1986State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 1, 1985State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 1, 1985State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 1, 1985State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- November 1, 1985State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 1, 1985State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
Common questions
Is LEDGES SYSTEM 1 required to publish a Consumer Confidence Report?
- Yes. LEDGES SYSTEM 1 is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is LEDGES SYSTEM 1’s next Consumer Confidence Report due?
- LEDGES SYSTEM 1’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does LEDGES SYSTEM 1 have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 open health-based violation for LEDGES SYSTEM 1, alongside 1 other open item.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
NIELSEN, JAMES M
802-672-5067
PLYMOUTH, VT 05056