MILTON, VT · Franklin County
RHODESIDE ACRES Water System
Consumer Confidence Report status
RHODESIDE ACRES must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 2 items for RHODESIDE ACRES that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Vermont’s official records. Always confirm current status with Vermont before making decisions based on this information.
System facts
- System ID (PWSID)
- VT0005379
- System type
- Community Water System
- Population served
- 65
- Service connections
- 25
- Ownership
- privately owned
- Water source
- groundwater (wells)
RHODESIDE ACRES is one of 498 community water systems in Vermont in the 500 or fewer people size category, serving 65 people from groundwater.
As of August 1, 2026, its federal record holds 110 entries between 1994 and 2025, of which 2 remain open; none are health-based.
Of the 110, 90 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, inorganic chemicals, and volatile organic chemicals.
Violation history
Follow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2025
UnaddressedMonitoring, Regular
—CYANIDE
July 1, 2023 – September 30, 2023
ResolvedMonitoring, Regular
—Fluoride
July 1, 2023 – September 30, 2023
ResolvedMonitoring, Regular
—Chromium
July 1, 2023 – September 30, 2023
ResolvedMonitoring, Regular
—Thallium, Total
July 1, 2023 – September 30, 2023
ResolvedMonitoring, Regular
—Antimony, Total
July 1, 2023 – September 30, 2023
ResolvedMonitoring, Regular
—Nitrate
January 1, 2022 – March 31, 2022
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2021 – December 30, 2022
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—Radium-228
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—Radium-226
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—Nitrate
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Regular
—Nickel
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Cadmium
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—CYANIDE
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Beryllium, Total
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—Thallium, Total
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Picloram
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Heptachlor epoxide
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—2,4-D
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—2,4,5-TP
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Chlordane
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Endrin
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Methoxychlor
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—OXAMYL
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—CYANIDE
July 1, 2017 – September 30, 2017
ResolvedMonitoring, Regular
—Fluoride
July 1, 2017 – September 30, 2017
ResolvedMonitoring, Regular
—Arsenic
July 1, 2017 – September 30, 2017
ResolvedMonitoring, Regular
—Barium
July 1, 2017 – September 30, 2017
ResolvedMonitoring, Regular
—Nickel
July 1, 2017 – September 30, 2017
ResolvedMonitoring, Regular
—Thallium, Total
July 1, 2017 – September 30, 2017
ResolvedMonitoring, Regular
—Selenium
July 1, 2017 – September 30, 2017
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2016 – April 30, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2012 – April 30, 2012
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2011 – June 13, 2013
ResolvedMonitoring, Regular
—Nitrate
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2008 – August 31, 2008
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2007 – November 6, 2007
ResolvedMonitoring, Regular
—CYANIDE
July 1, 2007 – September 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2006 – June 30, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2004 – February 29, 2004
ResolvedMonitoring, Regular
—Nickel
July 1, 2001 – September 30, 2001
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
July 1, 2000 – September 30, 2000
ResolvedNotification, Public
—BHC-GAMMA
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—Methoxychlor
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—Toxaphene
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—Di(2-ethylhexyl) adipate
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—OXAMYL
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—Dinoseb
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—Hexachlorocyclopentadiene
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—LASSO
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—Heptachlor epoxide
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—Total Polychlorinated Biphenyls (PCB)
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—ETHYLENE DIBROMIDE
July 1, 2000 – July 31, 2000
ArchivedNotification, Public
—Chlordane
July 1, 2000 – July 31, 2000
ArchivedMonitoring, Regular
—Methoxychlor
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Toxaphene
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—OXAMYL
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Simazine
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Picloram
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Dinoseb
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Carbofuran
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Atrazine
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—LASSO
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Heptachlor
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—2,4-D
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—2,4,5-TP
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Benzo(a)pyrene
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Pentachlorophenol
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 2000 – September 30, 2000
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2000 – June 25, 2001
ResolvedMonitoring, Regular
—Endrin
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—BHC-GAMMA
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Regular
—Nitrate
April 1, 2000 – June 30, 2000
ArchivedMonitoring, Regular
—Nitrate
April 1, 2000 – June 30, 2000
ResolvedNotification, Public
—Chromium
January 1, 2000 – January 31, 2000
ArchivedNotification, Public
—Cadmium
January 1, 2000 – January 31, 2000
ArchivedNotification, Public
—Barium
January 1, 2000 – January 31, 2000
ArchivedNotification, Public
—Arsenic
January 1, 2000 – January 31, 2000
ArchivedMonitoring, Regular
—CYANIDE
January 1, 2000 – March 31, 2000
ArchivedNotification, Public
—Selenium
January 1, 2000 – January 31, 2000
ArchivedNotification, Public
—Beryllium, Total
January 1, 2000 – January 31, 2000
ArchivedMonitoring, Regular
—Chromium
January 1, 2000 – March 31, 2000
ResolvedMonitoring, Regular
—Mercury
January 1, 2000 – March 31, 2000
ResolvedMonitoring, Regular
—CYANIDE
January 1, 2000 – March 31, 2000
ResolvedMonitoring, Regular
—Arsenic
January 1, 2000 – March 31, 2000
ResolvedMonitoring, Regular
—Barium
January 1, 2000 – March 31, 2000
ResolvedMonitoring, Regular
—Cadmium
January 1, 2000 – March 31, 2000
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 1999 – April 25, 2000
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 1999
UnaddressedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1994 – November 30, 1994
Resolved
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2023 – September 30, 2023 | Monitoring, Regular | CYANIDE | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring, Regular | Fluoride | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring, Regular | Chromium | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring, Regular | Thallium, Total | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 2022 – March 31, 2022 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 2021 – December 30, 2022 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2021 – March 31, 2021 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Nickel | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Cadmium | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | CYANIDE | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring, Regular | Thallium, Total | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Picloram | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | 2,4-D | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Chlordane | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Endrin | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Methoxychlor | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | OXAMYL | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring, Regular | CYANIDE | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring, Regular | Fluoride | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring, Regular | Arsenic | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring, Regular | Barium | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring, Regular | Nickel | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring, Regular | Thallium, Total | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring, Regular | Selenium | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2016 – April 30, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2012 – April 30, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2011 – June 13, 2013 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Nitrate | — | Resolved |
| August 1, 2008 – August 31, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2007 – November 6, 2007 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | CYANIDE | — | Resolved |
| June 1, 2006 – June 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2004 – February 29, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2001 – September 30, 2001 | Monitoring, Regular | Nickel | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| July 1, 2000 – July 31, 2000 | Notification, Public | BHC-GAMMA | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | Methoxychlor | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | Toxaphene | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | Di(2-ethylhexyl) adipate | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | OXAMYL | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | Dinoseb | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | Hexachlorocyclopentadiene | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | LASSO | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | Heptachlor epoxide | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | ETHYLENE DIBROMIDE | — | Archived |
| July 1, 2000 – July 31, 2000 | Notification, Public | Chlordane | — | Archived |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Methoxychlor | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Toxaphene | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | OXAMYL | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Simazine | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Picloram | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Dinoseb | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Carbofuran | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Atrazine | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | LASSO | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Heptachlor | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | 2,4-D | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| July 1, 2000 – June 25, 2001 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | Endrin | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| April 1, 2000 – June 30, 2000 | Monitoring, Regular | Nitrate | — | Archived |
| April 1, 2000 – June 30, 2000 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2000 – January 31, 2000 | Notification, Public | Chromium | — | Archived |
| January 1, 2000 – January 31, 2000 | Notification, Public | Cadmium | — | Archived |
| January 1, 2000 – January 31, 2000 | Notification, Public | Barium | — | Archived |
| January 1, 2000 – January 31, 2000 | Notification, Public | Arsenic | — | Archived |
| January 1, 2000 – March 31, 2000 | Monitoring, Regular | CYANIDE | — | Archived |
| January 1, 2000 – January 31, 2000 | Notification, Public | Selenium | — | Archived |
| January 1, 2000 – January 31, 2000 | Notification, Public | Beryllium, Total | — | Archived |
| January 1, 2000 – March 31, 2000 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 2000 – March 31, 2000 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2000 – March 31, 2000 | Monitoring, Regular | CYANIDE | — | Resolved |
| January 1, 2000 – March 31, 2000 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2000 – March 31, 2000 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2000 – March 31, 2000 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 1999 – April 25, 2000 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 1999 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| November 1, 1994 – November 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- November 5, 2025State Formal Notice of Violation issued1 linked violation
- November 5, 2025State Public Notification requested1 linked violation
- May 8, 2025State no longer subject to Rulegeneral compliance action — not tied to a specific violation on record
- November 1, 2024State Formal Notice of Violation issued1 linked violation
- November 1, 2024State Technical Assistance Visit1 linked violation
- October 18, 2024State Public Notification received12 linked violations
- October 18, 2024State Compliance achieved1 linked violation
- December 13, 2023State Technical Assistance Visit1 linked violation
- December 13, 2023State Formal Notice of Violation issued1 linked violation
- November 20, 2023State Compliance achieved12 linked violations
- November 15, 2023State Public Notification requested12 linked violations
- November 15, 2023State Technical Assistance Visit12 linked violations
- November 15, 2023State Other12 linked violations
- November 15, 2023State Formal Notice of Violation issued12 linked violations
- October 18, 2023State Public Notification received1 linked violation
- October 18, 2023State Public Notification received1 linked violation
- October 10, 2023State Compliance achieved1 linked violation
- December 30, 2022State Compliance achieved1 linked violation
- October 7, 2022State Formal Notice of Violation issued1 linked violation
- October 7, 2022State Technical Assistance Visit1 linked violation
- October 7, 2022State Public Notification requested1 linked violation
- September 29, 2022State Formal Notice of Violation issued1 linked violation
- September 29, 2022State Technical Assistance Visit1 linked violation
- September 9, 2022State Public Notification received1 linked violation
- September 9, 2022State Public Notification received21 linked violations
- September 9, 2022State Public Notification received2 linked violations
- September 6, 2022State Compliance achieved1 linked violation
- July 5, 2022State Compliance achieved1 linked violation
- December 16, 2021State Public Notification requested1 linked violation
- December 16, 2021State Formal Notice of Violation issued1 linked violation
- September 27, 2021State Compliance achieved2 linked violations
- September 7, 2021State Compliance achieved21 linked violations
- August 30, 2021State Compliance achieved1 linked violation
- August 5, 2021State Public Notification received12 linked violations
- June 18, 2021State Technical Assistance Visit1 linked violation
- June 18, 2021State Formal Notice of Violation issued2 linked violations
- June 18, 2021State Other2 linked violations
- June 18, 2021State Technical Assistance Visit2 linked violations
- June 18, 2021State Public Notification requested1 linked violation
- June 18, 2021State Formal Notice of Violation issued1 linked violation
- June 18, 2021State Other1 linked violation
- June 18, 2021State Public Notification requested21 linked violations
- June 18, 2021State Formal Notice of Violation issued21 linked violations
- June 18, 2021State Other21 linked violations
- June 18, 2021State Technical Assistance Visit21 linked violations
- June 18, 2021State Public Notification requested2 linked violations
- March 22, 2021State Compliance achieved12 linked violations
- March 4, 2021State Public Notification requested12 linked violations
- March 4, 2021State Other12 linked violations
- March 4, 2021State Technical Assistance Visit12 linked violations
- March 4, 2021State Formal Notice of Violation issued12 linked violations
- November 24, 2020State Public Notification received1 linked violation
- November 24, 2020State Public Notification received25 linked violations
- July 27, 2020State Compliance achieved25 linked violations
- December 12, 2019State Public Notification requested1 linked violation
- December 12, 2019State Formal Notice of Violation issued1 linked violation
- December 11, 2019State Compliance achieved1 linked violation
- September 10, 2019State Formal Notice of Violation issued25 linked violations
- September 10, 2019State Technical Assistance Visit25 linked violations
- September 10, 2019State Other25 linked violations
- September 10, 2019State Public Notification requested25 linked violations
- September 4, 2019State Compliance achieved1 linked violation
- September 3, 2019State Compliance achieved1 linked violation
- September 3, 2019State Compliance achieved7 linked violations
- September 3, 2019State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 28, 2018State Compliance achieved2 linked violations
- June 29, 2018State Public Notification received1 linked violation
- June 29, 2018State Public Notification received2 linked violations
- June 29, 2018State Public Notification received10 linked violations
- June 29, 2018State Public Notification received1 linked violation
- June 29, 2018State Public Notification received1 linked violation
- February 1, 2018State Compliance achieved1 linked violation
- January 8, 2018State Compliance achieved11 linked violations
- November 30, 2017State Compliance achieved1 linked violation
- November 16, 2017State Technical Assistance Visit1 linked violation
- November 16, 2017State Public Notification requested10 linked violations
- November 16, 2017State Formal Notice of Violation issued10 linked violations
- November 16, 2017State Other10 linked violations
- November 16, 2017State Technical Assistance Visit10 linked violations
- November 16, 2017State Public Notification requested1 linked violation
- November 16, 2017State Formal Notice of Violation issued1 linked violation
- November 16, 2017State Other1 linked violation
- November 16, 2017State Public Notification requested1 linked violation
- November 16, 2017State Formal Notice of Violation issued1 linked violation
- November 16, 2017State Other1 linked violation
- November 16, 2017State Technical Assistance Visit1 linked violation
- November 14, 2017State Technical Assistance Visit2 linked violations
- November 14, 2017State Public Notification requested2 linked violations
- November 14, 2017State Formal Notice of Violation issued2 linked violations
- June 30, 2017State Public Notification received1 linked violation
- June 30, 2017State Public Notification received1 linked violation
- May 18, 2017State Technical Assistance Visit1 linked violation
- May 18, 2017State Formal Notice of Violation issued1 linked violation
- May 18, 2017State Other1 linked violation
- May 18, 2017State Public Notification requested1 linked violation
- February 8, 2017State Compliance achieved1 linked violation
- January 18, 2017State Compliance achieved1 linked violation
- October 10, 2016State Compliance achieved1 linked violation
- October 10, 2016State Technical Assistance Visit1 linked violation
- October 10, 2016State Formal Notice of Violation issued1 linked violation
- July 28, 2016State Public Notification received1 linked violation
- May 27, 2016State Formal Notice of Violation issued1 linked violation
- May 27, 2016State Formal Notice of Violation issued1 linked violation
- May 27, 2016State Public Notification requested1 linked violation
- May 27, 2016State Public Notification requested1 linked violation
- November 24, 2015State Public Notification requested1 linked violation
- November 24, 2015State Formal Notice of Violation issued1 linked violation
- November 24, 2015State Technical Assistance Visit1 linked violation
- July 1, 2013State Public Notification received1 linked violation
- July 1, 2013State Public Notification received1 linked violation
- July 1, 2013State Public Notification received1 linked violation
- July 1, 2013State Public Notification received1 linked violation
- June 13, 2013State Compliance achieved5 linked violations
- October 3, 2012State Formal Notice of Violation issued1 linked violation
- October 3, 2012State Public Notification requested1 linked violation
- October 1, 2012State Public Notification requested1 linked violation
- October 1, 2012State Formal Notice of Violation issued1 linked violation
- June 29, 2012State Public Notification received1 linked violation
- June 29, 2012State Public Notification received1 linked violation
- May 30, 2012State Public Notification requested1 linked violation
- May 30, 2012State Formal Notice of Violation issued1 linked violation
- February 21, 2012State Formal Notice of Violation issued1 linked violation
- February 21, 2012State Public Notification requested1 linked violation
- February 21, 2012State Technical Assistance Visit1 linked violation
- August 10, 2011State Compliance achieved4 linked violations
- July 1, 2011State Public Notification received1 linked violation
- July 1, 2011State Public Notification received1 linked violation
- June 10, 2011State Other1 linked violation
- June 10, 2011State Public Notification requested1 linked violation
- June 10, 2011State Formal Notice of Violation issued1 linked violation
- June 10, 2011State Technical Assistance Visit1 linked violation
- April 26, 2011State Compliance achieved1 linked violation
- November 22, 2010State Compliance achieved1 linked violation
- June 25, 2010State Public Notification received1 linked violation
- June 14, 2010State Technical Assistance Visit1 linked violation
- June 14, 2010State Public Notification requested1 linked violation
- June 14, 2010State Formal Notice of Violation issued1 linked violation
- June 14, 2010State Other1 linked violation
- May 13, 2010State Formal Notice of Violation issued1 linked violation
- May 13, 2010State Public Notification requested1 linked violation
- July 2, 2009State Public Notification received1 linked violation
- May 26, 2009State Public Notification requested1 linked violation
- May 26, 2009State Formal Notice of Violation issued1 linked violation
- May 7, 2009State Public Notification requested1 linked violation
- May 7, 2009State Formal Notice of Violation issued1 linked violation
- September 26, 2008State Public Notification requested1 linked violation
- September 26, 2008State Formal Notice of Violation issued1 linked violation
- June 18, 2008State Public Notification received1 linked violation
- June 18, 2008State Public Notification received1 linked violation
- March 27, 2008State Compliance achieved1 linked violation
- December 4, 2007State Public Notification requested1 linked violation
- December 4, 2007State Formal Notice of Violation issued1 linked violation
- November 6, 2007State Formal Notice of Violation issued1 linked violation
- November 6, 2007State Compliance achieved1 linked violation
- September 28, 2006State Public Notification received1 linked violation
- August 3, 2006State Public Notification requested1 linked violation
- August 3, 2006State Formal Notice of Violation issued1 linked violation
- August 26, 2004State Public Notification received1 linked violation
- August 26, 2004State Public Notification received1 linked violation
- April 1, 2004State Violation/Reminder Notice2 linked violations
- March 1, 2004State Violation/Reminder Notice1 linked violation
- March 1, 2004State Public Notification requested1 linked violation
- December 1, 2003State Violation/Reminder Notice1 linked violation
- December 1, 2003State Public Notification requested1 linked violation
- May 8, 2003State Public Notification received1 linked violation
- March 12, 2003State Public Notification requested1 linked violation
- March 12, 2003State Formal Notice of Violation issued1 linked violation
- March 20, 2002State Administrative/Compliance Order with penalty issued11 linked violations
- March 20, 2002State Administrative/Compliance Order with penalty issued2 linked violations
- March 20, 2002State Administrative/Compliance Order with penalty issued25 linked violations
- March 20, 2002State Public Notification received2 linked violations
- March 20, 2002State Public Notification received11 linked violations
- March 20, 2002State Public Notification received2 linked violations
- November 21, 2001State Compliance achieved34 linked violations
- November 21, 2001State Compliance achieved11 linked violations
- November 19, 2001State Public Notification requested10 linked violations
- November 19, 2001State Formal Notice of Violation issued10 linked violations
- June 27, 2001Federal Compliance achieved82 linked violations
- June 25, 2001State Compliance achieved1 linked violation
- May 30, 2001State Administrative/Compliance Order without penalty issued1 linked violation
- May 16, 2001State Public Notification requested1 linked violation
- May 16, 2001State Formal Notice of Violation issued1 linked violation
- April 27, 2001State Formal Notice of Violation issued2 linked violations
- April 27, 2001State Public Notification requested1 linked violation
- November 14, 2000State Public Notification requested24 linked violations
- November 14, 2000State Formal Notice of Violation issued24 linked violations
- October 19, 2000State Compliance achieved1 linked violation
- August 10, 2000State Public Notification requested10 linked violations
- August 10, 2000State Formal Notice of Violation issued10 linked violations
- August 10, 2000State Public Notification requested1 linked violation
- August 10, 2000State Formal Notice of Violation issued1 linked violation
- August 10, 2000State Public Notification requested1 linked violation
- August 10, 2000State Formal Notice of Violation issued1 linked violation
- April 25, 2000State Compliance achieved2 linked violations
- July 1, 1999State Violation/Reminder Notice1 linked violation
- July 1, 1999State Public Notification requested1 linked violation
- June 30, 1998State Administrative/Compliance Order with penalty issued1 linked violation
- July 30, 1997State Formal Notice of Violation issued1 linked violation
- July 20, 1997State Public Notification requested1 linked violation
- August 1, 1996State Violation/Reminder Notice1 linked violation
- August 1, 1996State Public Notification requested1 linked violation
- July 1, 1996State Public Notification requested1 linked violation
- July 1, 1996State Violation/Reminder Notice1 linked violation
- December 1, 1994State Violation/Reminder Notice1 linked violation
- December 1, 1994State Public Notification requested2 linked violations
- April 1, 1986State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- April 1, 1986State Intentional no-actiongeneral compliance action — not tied to a specific violation on record
- April 1, 1986State Violation/Reminder Notice1 linked violation
Common questions
Is RHODESIDE ACRES required to publish a Consumer Confidence Report?
- Yes. RHODESIDE ACRES is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is RHODESIDE ACRES’s next Consumer Confidence Report due?
- RHODESIDE ACRES’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does RHODESIDE ACRES have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 2 items for RHODESIDE ACRES that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
MORGAN, ADAM J
802-782-2143
MILTON, VT 05468