RAPIDAN, VA · Madison County
HARTLAND INSTITUTE Water System
Consumer Confidence Report status
HARTLAND INSTITUTE must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for HARTLAND INSTITUTE.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Virginia’s official records. Always confirm current status with Virginia before making decisions based on this information.
System facts
- System ID (PWSID)
- VA6113165
- System type
- Community Water System
- Population served
- 150
- Service connections
- 40
- Ownership
- privately owned
- Water source
- groundwater (wells)
HARTLAND INSTITUTE is one of 2,163 community water systems in Virginia in the 500 or fewer people size category, serving 150 people from groundwater.
As of August 1, 2026, its federal record holds 54 entries between 1993 and 2024, all of which EPA lists as closed.
Of the 54, 30 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Total Coliform Rules, the Stage 1 Disinfectants and Disinfection Byproducts Rule, and the Lead and Copper Rule.
Violation history
Monitoring and Reporting (DBP)
—Chlorine
September 1, 2024 – September 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2024 – September 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2024 – March 31, 2024
ResolvedLead Consumer Notice
—Lead and Copper Rule
January 1, 2024 – February 7, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2023 – September 30, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2023 – February 8, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – April 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – May 3, 2023
ResolvedMonitoring, Routine (IDSE)
—Total Haloacetic Acids (HAA5)
January 1, 2021 – December 31, 2023
ResolvedMonitoring, Routine (IDSE)
—TTHM
January 1, 2021 – December 31, 2023
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2020 – December 31, 2020
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 2, 2019 – February 25, 2020
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2019 – July 8, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2019 – September 30, 2019
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 29, 2018 – July 8, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2018 – June 30, 2018
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Routine (IDSE)
—Total Haloacetic Acids (HAA5)
January 1, 2016 – December 31, 2018
ResolvedMonitoring, Routine (IDSE)
—TTHM
January 1, 2016 – December 31, 2018
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
June 1, 2014 – June 30, 2014
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
May 1, 2014 – May 31, 2014
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 10, 2013 – May 8, 2013
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2012 – December 31, 2012
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2011 – August 18, 2011
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 2010 – August 31, 2010
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2010 – July 31, 2010
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
May 1, 2010 – May 31, 2010
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 2009 – August 31, 2009
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
June 1, 2009 – June 30, 2009
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
May 1, 2008 – May 31, 2008
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
April 1, 2008 – April 30, 2008
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
October 1, 2007 – October 31, 2007
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2007 – July 31, 2007
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
May 1, 2007 – May 31, 2007
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
December 1, 2006 – December 31, 2006
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
June 1, 2006 – June 30, 2006
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
November 1, 2005 – November 30, 2005
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
February 1, 2005 – February 28, 2005
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 31, 2005 – June 29, 2005
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
December 1, 2004 – December 31, 2004
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
November 1, 2004 – November 30, 2004
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 17, 2004 – October 26, 2004
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 9, 2003 – July 1, 2004
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 14, 2003 – July 1, 2004
ResolvedMonitoring, Repeat Minor (TCR)
—Coliform (TCR)
January 8, 2002 – February 7, 2002
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 2001 – October 31, 2001
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 2001 – August 31, 2001
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
September 1, 1996 – September 30, 1996
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
January 1, 1996 – January 31, 1996
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 1994 – November 30, 1994
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1994 – April 30, 1994
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1993 – October 31, 1993
Archived
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| September 1, 2024 – September 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| September 1, 2024 – September 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2024 – March 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – February 7, 2024 | Lead Consumer Notice | Lead and Copper Rule | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| September 1, 2023 – September 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| June 1, 2023 – February 8, 2024 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| April 1, 2023 – April 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2023 – May 3, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2021 – December 31, 2023 | Monitoring, Routine (IDSE) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2021 – December 31, 2023 | Monitoring, Routine (IDSE) | TTHM | — | Resolved |
| January 1, 2020 – December 31, 2020 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| October 2, 2019 – February 25, 2020 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| October 1, 2019 – July 8, 2020 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2019 – September 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 29, 2018 – July 8, 2020 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| June 1, 2018 – June 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| January 1, 2016 – December 31, 2018 | Monitoring, Routine (IDSE) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2016 – December 31, 2018 | Monitoring, Routine (IDSE) | TTHM | — | Resolved |
| June 1, 2014 – June 30, 2014 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| May 1, 2014 – May 31, 2014 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 10, 2013 – May 8, 2013 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| July 1, 2011 – August 18, 2011 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| August 1, 2010 – August 31, 2010 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2010 – July 31, 2010 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| May 1, 2010 – May 31, 2010 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| August 1, 2009 – August 31, 2009 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2009 – June 30, 2009 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| May 1, 2008 – May 31, 2008 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| April 1, 2008 – April 30, 2008 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 2007 – October 31, 2007 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2007 – July 31, 2007 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| May 1, 2007 – May 31, 2007 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| December 1, 2006 – December 31, 2006 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| June 1, 2006 – June 30, 2006 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| November 1, 2005 – November 30, 2005 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| February 1, 2005 – February 28, 2005 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 31, 2005 – June 29, 2005 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| December 1, 2004 – December 31, 2004 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| November 1, 2004 – November 30, 2004 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 17, 2004 – October 26, 2004 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 9, 2003 – July 1, 2004 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| June 14, 2003 – July 1, 2004 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 8, 2002 – February 7, 2002 | Monitoring, Repeat Minor (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2001 – October 31, 2001 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2001 – August 31, 2001 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 1996 – September 30, 1996 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 1996 – January 31, 1996 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| November 1, 1994 – November 30, 1994 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| April 1, 1994 – April 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1993 – October 31, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- November 8, 2024State Compliance achieved1 linked violation
- November 8, 2024State Compliance achieved1 linked violation
- October 18, 2024State Public Notification received1 linked violation
- October 18, 2024State Public Notification received1 linked violation
- October 16, 2024State Public Notification requested1 linked violation
- October 16, 2024State Public Notification requested1 linked violation
- October 16, 2024State Formal Notice of Violation issued1 linked violation
- October 16, 2024State Formal Notice of Violation issued1 linked violation
- August 14, 2024State Compliance achieved2 linked violations
- April 19, 2024State Public Notification received1 linked violation
- April 18, 2024State Formal Notice of Violation issued1 linked violation
- April 18, 2024State Public Notification requested1 linked violation
- April 18, 2024State Formal Notice of Violation issued1 linked violation
- April 18, 2024State Public Notification requested1 linked violation
- April 10, 2024State Compliance achieved1 linked violation
- April 10, 2024State Compliance achieved2 linked violations
- April 9, 2024State Public Notification received1 linked violation
- April 9, 2024State Public Notification received1 linked violation
- April 9, 2024State Public Notification received1 linked violation
- April 9, 2024State Public Notification received2 linked violations
- April 2, 2024State Public Notification requested2 linked violations
- April 2, 2024State Formal Notice of Violation issued1 linked violation
- February 8, 2024State Compliance achieved3 linked violations
- February 7, 2024State Public Notification received1 linked violation
- February 7, 2024State Compliance achieved1 linked violation
- January 22, 2024State Public Notification received2 linked violations
- January 10, 2024State Public Notification requested2 linked violations
- January 10, 2024State Public Notification requested1 linked violation
- January 10, 2024State Formal Notice of Violation issued1 linked violation
- January 10, 2024State Formal Notice of Violation issued2 linked violations
- November 17, 2023State Compliance achieved1 linked violation
- October 31, 2023State Compliance achieved1 linked violation
- October 19, 2023State Public Notification requested1 linked violation
- October 19, 2023State Formal Notice of Violation issued1 linked violation
- October 17, 2023State Public Notification requested7 linked violations
- October 17, 2023State Formal Notice of Violation issued1 linked violation
- May 17, 2023State Formal Notice of Violation issued1 linked violation
- May 17, 2023State Public Notification requested3 linked violations
- May 17, 2023State Public Notification requested4 linked violations
- May 3, 2023State Compliance achieved1 linked violation
- February 5, 2021State Public Notification requested18 linked violations
- July 8, 2020State Compliance achieved1 linked violation
- July 2, 2020State Compliance achieved2 linked violations
- May 19, 2020State Public Notification received2 linked violations
- May 18, 2020State Public Notification received6 linked violations
- March 24, 2020State Public Notification requested5 linked violations
- February 25, 2020State Compliance achieved2 linked violations
- December 18, 2019State Public Notification requested1 linked violation
- December 18, 2019State Public Notification requested3 linked violations
- November 20, 2019State Compliance achieved1 linked violation
- November 8, 2019State Public Notification received1 linked violation
- November 5, 2019State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- October 31, 2019State Formal Notice of Violation issued1 linked violation
- October 15, 2019State Compliance achieved1 linked violation
- February 22, 2019State Public Notification requested1 linked violation
- February 22, 2019State Formal Notice of Violation issued1 linked violation
- October 29, 2018State Public Notification requested1 linked violation
- October 29, 2018State Formal Notice of Violation issued1 linked violation
- October 9, 2018State Public Notification received1 linked violation
- July 24, 2018State Formal Notice of Violation issued1 linked violation
- July 24, 2018State Public Notification requested1 linked violation
- July 2, 2018State Compliance achieved1 linked violation
- August 14, 2014State Public Notification received1 linked violation
- July 31, 2014State Compliance achieved1 linked violation
- July 31, 2014State Compliance achieved1 linked violation
- July 15, 2014State Formal Notice of Violation issued1 linked violation
- July 15, 2014State Public Notification requested1 linked violation
- June 16, 2014State Public Notification requested2 linked violations
- June 16, 2014State Formal Notice of Violation issued1 linked violation
- May 8, 2013State Compliance achieved1 linked violation
- February 27, 2013State Compliance achieved1 linked violation
- February 20, 2013State Public Notification requested1 linked violation
- February 20, 2013State Public Notification requested1 linked violation
- February 20, 2013State Formal Notice of Violation issued1 linked violation
- February 20, 2013State Formal Notice of Violation issued1 linked violation
- August 18, 2011State Compliance achieved1 linked violation
- August 8, 2011State Compliance achieved2 linked violations
- July 13, 2011State Formal Notice of Violation issued1 linked violation
- September 23, 2010State Public Notification received2 linked violations
- September 20, 2010State Public Notification requested1 linked violation
- September 20, 2010State Formal Notice of Violation issued1 linked violation
- September 2, 2010State Compliance achieved1 linked violation
- September 2, 2010State Compliance achieved1 linked violation
- August 23, 2010State Public Notification requested1 linked violation
- August 11, 2010State Public Notification received1 linked violation
- June 22, 2010State Public Notification requested1 linked violation
- June 22, 2010State Formal Notice of Violation issued1 linked violation
- June 16, 2010State Compliance achieved1 linked violation
- September 22, 2009State Compliance achieved1 linked violation
- September 16, 2009State Formal Notice of Violation issued1 linked violation
- September 16, 2009State Public Notification requested1 linked violation
- August 31, 2009State Public Notification received1 linked violation
- July 29, 2009State Formal Notice of Violation issued1 linked violation
- July 29, 2009State Public Notification requested1 linked violation
- July 27, 2009State Compliance achieved1 linked violation
- June 11, 2008State Compliance achieved3 linked violations
- June 9, 2008State Formal Notice of Violation issued1 linked violation
- June 9, 2008State Public Notification requested1 linked violation
- May 12, 2008State Public Notification requested1 linked violation
- May 12, 2008State Formal Notice of Violation issued1 linked violation
- November 14, 2007State Public Notification received3 linked violations
- October 22, 2007State Formal Notice of Violation issued1 linked violation
- January 29, 2007State Formal Notice of Violation issued8 linked violations
- June 15, 2006State Public Notification requested1 linked violation
- December 19, 2005State Compliance achieved1 linked violation
- June 29, 2005State Compliance achieved1 linked violation
- March 30, 2005State Public Notification requested1 linked violation
- March 8, 2005State Compliance achieved5 linked violations
- February 25, 2005State Public Notification received10 linked violations
- February 15, 2005State Compliance achieved1 linked violation
- December 23, 2004State Formal Notice of Violation issued34 linked violations
- July 1, 2004State Compliance achieved3 linked violations
- March 15, 2004State Formal Notice of Violation issued1 linked violation
- November 5, 2003State Compliance achieved1 linked violation
- August 12, 2003State Compliance achieved1 linked violation
- July 14, 2003State Formal Notice of Violation issued4 linked violations
- June 9, 2003State Compliance achieved1 linked violation
- May 14, 2003State Public Notification requested2 linked violations
- February 25, 2003State Public Notification requested4 linked violations
- October 16, 2002State Compliance achieved3 linked violations
- August 28, 2002State Formal Notice of Violation issued1 linked violation
- March 4, 2002State Public Notification requested7 linked violations
- February 12, 2002State Compliance achieved1 linked violation
- November 8, 2001State Compliance achieved2 linked violations
- October 23, 2001State Formal Notice of Violation issued25 linked violations
- September 7, 2000State Public Notification received2 linked violations
- August 17, 2000State Public Notification requested3 linked violations
- August 15, 2000State Compliance achieved1 linked violation
- December 30, 1999State Formal Notice of Violation issued10 linked violations
- December 2, 1999State Compliance achieved1 linked violation
- October 12, 1999State Compliance achieved1 linked violation
- November 11, 1996State Compliance achieved1 linked violation
- February 29, 1996State Compliance achieved1 linked violation
Common questions
Is HARTLAND INSTITUTE required to publish a Consumer Confidence Report?
- Yes. HARTLAND INSTITUTE is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is HARTLAND INSTITUTE’s next Consumer Confidence Report due?
- HARTLAND INSTITUTE’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does HARTLAND INSTITUTE have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for HARTLAND INSTITUTE.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
RAMOS, IBEIZA
Phone not on record
RAPIDAN, VA 22733