DEWITT, VA · Dinwiddie County
AZZIE MANOR HOME FOR ADULTS Water System
Current status
No open violations on record as of July 4, 2026.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Virginia’s official records. Always confirm current status with Virginia before making decisions based on this information.
System facts
- System ID (PWSID)
- VA3053210
- System type
- Community Water System
- Population served
- 39
- Service connections
- 1
- Ownership
- privately owned
- Water source
- groundwater (wells)
Violation history
Maximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2022 – March 31, 2022
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
October 1, 2021 – December 31, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2021 – December 31, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2021 – September 30, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
July 1, 2021 – September 30, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
April 1, 2021 – June 30, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2021 – June 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2021 – April 30, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2021 – March 31, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
January 1, 2021 – March 31, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
October 1, 2020 – December 31, 2020
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2020 – December 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2019 – August 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2018 – July 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2018 – May 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2018 – March 31, 2018
ResolvedMonitoring, Source Water (GWR)
—E. COLI
February 23, 2018 – March 17, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2018 – January 31, 2018
ResolvedMonitoring, Source Water (GWR)
—E. COLI
September 1, 2017 – March 17, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2017 – March 31, 2017
ResolvedMonitoring, Source Water (GWR)
—E. COLI
November 12, 2016 – July 25, 2017
ResolvedReporting, Assessment Forms (RTCR)
—Revised Total Coliform Rule
October 31, 2016 – August 25, 2017
ResolvedTreatment Technique, Level 1 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
October 21, 2016 – August 24, 2017
ResolvedMonitoring, Source Water (GWR)
—E. COLI
September 9, 2016 – July 28, 2016
ResolvedMonitoring, Source Water (GWR)
—E. COLI
July 16, 2016 – July 28, 2016
ResolvedMonitoring, Source Water (GWR)
—E. COLI
March 25, 2016 – July 28, 2016
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
March 1, 2016 – March 31, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2016 – February 29, 2016
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
January 1, 2016 – January 31, 2016
ResolvedMonitoring, Repeat Minor (TCR)
—Coliform (TCR)
December 1, 2015 – December 31, 2015
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
December 1, 2015 – December 31, 2015
ResolvedMonitoring, Source Water (GWR)
—E. COLI
November 13, 2015 – December 9, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2015 – November 30, 2015
ResolvedMonitoring, Source Water (GWR)
—E. COLI
October 16, 2015 – December 9, 2015
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 2015 – October 31, 2015
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
October 1, 2015 – October 31, 2015
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 2015 – October 31, 2015
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
September 1, 2015 – September 30, 2015
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
September 1, 2015 – September 30, 2015
ResolvedMonitoring, Source Water (GWR)
—E. COLI
August 7, 2015 – December 9, 2015
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 2015 – August 19, 2015
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
July 1, 2015 – July 31, 2015
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
February 21, 2015 – August 24, 2017
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2015 – February 28, 2015
ResolvedMonitoring, Source Water (GWR)
—E. COLI
January 1, 2015 – March 19, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2015 – January 31, 2015
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
December 1, 2014 – December 31, 2014
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 2014 – November 30, 2014
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
October 1, 2014 – October 31, 2014
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 18, 2014 – June 2, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2014 – January 31, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2013 – December 31, 2013
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 21, 2013 – June 2, 2015
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 2013 – November 30, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2013 – August 31, 2013
ResolvedMonitoring, Source Water (GWR)
—E. COLI
July 10, 2013 – August 12, 2013
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
July 1, 2013 – July 31, 2013
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
June 1, 2013 – June 30, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2013 – February 28, 2013
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
January 1, 2013 – January 31, 2013
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
December 1, 2012 – December 31, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2012 – October 31, 2012
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
July 1, 2012 – July 31, 2012
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
June 1, 2012 – June 30, 2012
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
January 1, 2012 – January 31, 2012
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 2011 – November 30, 2011
ResolvedMonitoring, Regular
—Benzene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2011 – December 31, 2011
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2011 – February 28, 2012
ResolvedMonitoring, Regular
—Styrene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Toluene
January 1, 2011 – December 31, 2011
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 2010 – October 31, 2010
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
September 1, 2010 – September 30, 2010
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
September 1, 2010 – September 30, 2010
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
September 1, 2010 – September 30, 2010
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
August 1, 2010 – August 31, 2010
ResolvedLead Consumer Notice
—Lead and Copper Rule
July 30, 2010 – September 17, 2012
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 2009 – October 31, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2009 – July 31, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2008 – August 31, 2008
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
March 1, 2008 – March 31, 2008
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
February 1, 2008 – February 29, 2008
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2007 – December 31, 2007
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
November 1, 2007 – November 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2007 – June 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2007 – May 31, 2007
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2006 – May 27, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2006 – July 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2006 – April 30, 2006
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2005 – May 27, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2005 – July 31, 2005
ArchivedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
April 1, 2005 – April 30, 2005
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2005 – January 31, 2005
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2004 – May 27, 2010
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
September 1, 2004 – September 30, 2004
ArchivedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
July 1, 2004 – July 31, 2004
ArchivedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
May 1, 2004 – May 31, 2004
ArchivedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
April 1, 2004 – April 30, 2004
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2003 – August 31, 2003
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2003 – May 31, 2003
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2003 – February 28, 2003
ArchivedMonitoring, Regular
—Nitrate
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2002 – June 30, 2002
ArchivedOCCT/SOWT Treatment Installation/Demonstration
Health-basedLead and Copper Rule
January 1, 1999 – January 12, 2000
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
October 1, 1996 – October 31, 1996
Archived
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2022 – March 31, 2022 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| October 1, 2021 – December 31, 2021 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Resolved |
| October 1, 2021 – December 31, 2021 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| July 1, 2021 – September 30, 2021 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| July 1, 2021 – September 30, 2021 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Resolved |
| April 1, 2021 – June 30, 2021 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Resolved |
| April 1, 2021 – June 30, 2021 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2021 – March 31, 2021 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| January 1, 2021 – March 31, 2021 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Resolved |
| October 1, 2020 – December 31, 2020 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Resolved |
| October 1, 2020 – December 31, 2020 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| August 1, 2019 – August 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2018 – July 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2018 – May 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2018 – March 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 23, 2018 – March 17, 2020 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| January 1, 2018 – January 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2017 – March 17, 2020 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| March 1, 2017 – March 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 12, 2016 – July 25, 2017 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| October 31, 2016 – August 25, 2017 | Reporting, Assessment Forms (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 21, 2016 – August 24, 2017 | Treatment Technique, Level 1 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| September 9, 2016 – July 28, 2016 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| July 16, 2016 – July 28, 2016 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| March 25, 2016 – July 28, 2016 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| March 1, 2016 – March 31, 2016 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2016 – February 29, 2016 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2016 – January 31, 2016 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2015 – December 31, 2015 | Monitoring, Repeat Minor (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2015 – December 31, 2015 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| November 13, 2015 – December 9, 2015 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| November 1, 2015 – November 30, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 16, 2015 – December 9, 2015 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| October 1, 2015 – October 31, 2015 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2015 – October 31, 2015 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 2015 – October 31, 2015 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2015 – September 30, 2015 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2015 – September 30, 2015 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| August 7, 2015 – December 9, 2015 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| August 1, 2015 – August 19, 2015 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2015 – July 31, 2015 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| February 21, 2015 – August 24, 2017 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| February 1, 2015 – February 28, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2015 – March 19, 2015 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| January 1, 2015 – January 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2014 – December 31, 2014 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2014 – November 30, 2014 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2014 – October 31, 2014 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 18, 2014 – June 2, 2015 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2014 – January 31, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2013 – December 31, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 21, 2013 – June 2, 2015 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2013 – November 30, 2013 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2013 – August 31, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 10, 2013 – August 12, 2013 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| July 1, 2013 – July 31, 2013 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2013 – June 30, 2013 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2013 – February 28, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2013 – January 31, 2013 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2012 – December 31, 2012 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 2012 – October 31, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2012 – July 31, 2012 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2012 – June 30, 2012 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 2012 – January 31, 2012 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2011 – November 30, 2011 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2011 – February 28, 2012 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2011 – December 31, 2011 | Monitoring, Regular | Toluene | — | Resolved |
| October 1, 2010 – October 31, 2010 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2010 – September 30, 2010 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2010 – September 30, 2010 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| September 1, 2010 – September 30, 2010 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2010 – August 31, 2010 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| July 30, 2010 – September 17, 2012 | Lead Consumer Notice | Lead and Copper Rule | — | Resolved |
| October 1, 2009 – October 31, 2009 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2009 – July 31, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2008 – August 31, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 2008 – March 31, 2008 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2008 – February 29, 2008 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| December 1, 2007 – December 31, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2007 – November 30, 2007 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2007 – June 30, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2007 – May 31, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2006 – May 27, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2006 – July 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2006 – April 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 2005 – May 27, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2005 – July 31, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 2005 – April 30, 2005 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 2005 – January 31, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 2004 – May 27, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2004 – September 30, 2004 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| July 1, 2004 – July 31, 2004 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 2004 – May 31, 2004 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| April 1, 2004 – April 30, 2004 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
| August 1, 2003 – August 31, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 2003 – May 31, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 2003 – February 28, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Nitrate | — | Resolved |
| June 1, 2002 – June 30, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1999 – January 12, 2000 | OCCT/SOWT Treatment Installation/Demonstration | Lead and Copper Rule | Health-based | Resolved |
| October 1, 1996 – October 31, 1996 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- February 22, 2023State Compliance achieved1 linked violation
- February 22, 2023State Compliance achieved2 linked violations
- February 22, 2023State Compliance achieved15 linked violations
- November 21, 2022State Compliance achieved1 linked violation
- November 21, 2022State Compliance achieved1 linked violation
- November 21, 2022State Compliance achieved1 linked violation
- April 21, 2022State Formal Notice of Violation issued2 linked violations
- January 3, 2022State Formal Notice of Violation issued2 linked violations
- December 27, 2021State Public Notification received34 linked violations
- August 24, 2021State Public Notification requested3 linked violations
- June 10, 2021State Public Notification received6 linked violations
- April 8, 2021State Public Notification requested2 linked violations
- April 8, 2021State Formal Notice of Violation issued3 linked violations
- April 8, 2021State Public Notification requested1 linked violation
- February 19, 2021State Public Notification received2 linked violations
- February 19, 2021State Public Notification requested1 linked violation
- February 19, 2021State Formal Notice of Violation issued1 linked violation
- February 9, 2021State Public Notification requested1 linked violation
- February 9, 2021State Formal Notice of Violation issued1 linked violation
- January 27, 2021State Formal Notice of Violation issued1 linked violation
- March 17, 2020State Compliance achieved1 linked violation
- March 17, 2020State Compliance achieved1 linked violation
- October 4, 2019State Public Notification received1 linked violation
- September 30, 2019State Compliance achieved1 linked violation
- September 20, 2019State Public Notification requested1 linked violation
- September 20, 2019State Formal Notice of Violation issued1 linked violation
- October 2, 2018State Public Notification received1 linked violation
- September 24, 2018State Public Notification requested1 linked violation
- September 24, 2018State Formal Notice of Violation issued1 linked violation
- September 18, 2018State Compliance achieved1 linked violation
- September 18, 2018State Compliance achieved1 linked violation
- August 22, 2018State Formal Notice of Violation issued1 linked violation
- August 22, 2018State Public Notification requested1 linked violation
- July 17, 2018State Public Notification received1 linked violation
- June 29, 2018State Public Notification requested1 linked violation
- June 29, 2018State Formal Notice of Violation issued1 linked violation
- June 27, 2018State Compliance achieved1 linked violation
- May 14, 2018State Public Notification received1 linked violation
- April 23, 2018State Public Notification requested1 linked violation
- April 23, 2018State Formal Notice of Violation issued1 linked violation
- April 10, 2018State Compliance achieved1 linked violation
- April 9, 2018State Public Notification received1 linked violation
- March 29, 2018State Public Notification requested1 linked violation
- March 29, 2018State Formal Notice of Violation issued1 linked violation
- February 23, 2018State Public Notification received1 linked violation
- February 16, 2018State Public Notification requested1 linked violation
- February 16, 2018State Formal Notice of Violation issued1 linked violation
- January 23, 2018State Formal Notice of Violation issued1 linked violation
- January 23, 2018State Public Notification requested1 linked violation
- November 20, 2017State Public Notification received2 linked violations
- November 20, 2017State Public Notification received2 linked violations
- August 24, 2017State Compliance achieved2 linked violations
- August 24, 2017State Compliance achieved2 linked violations
- July 25, 2017State Compliance achieved2 linked violations
- May 22, 2017State Public Notification received2 linked violations
- May 2, 2017State Public Notification received2 linked violations
- May 2, 2017State Public Notification received2 linked violations
- April 6, 2017State Compliance achieved2 linked violations
- March 30, 2017State Public Notification requested2 linked violations
- March 30, 2017State Public Notification requested2 linked violations
- March 10, 2017State Public Notification received2 linked violations
- February 15, 2017State Public Notification requested2 linked violations
- December 28, 2016State Formal Notice of Violation issued2 linked violations
- November 3, 2016State Public Notification received2 linked violations
- November 3, 2016State Public Notification received2 linked violations
- November 3, 2016State Public Notification received2 linked violations
- November 3, 2016State Public Notification requested3 linked violations
- August 31, 2016State Public Notification requested7 linked violations
- April 25, 2016State Formal Notice of Violation issued5 linked violations
- April 13, 2016State Compliance achieved4 linked violations
- April 13, 2016State Compliance achieved1 linked violation
- March 24, 2016State Public Notification requested3 linked violations
- February 29, 2016State Public Notification requested3 linked violations
- February 17, 2016State Public Notification requested1 linked violation
- January 27, 2016State Compliance achieved1 linked violation
- January 27, 2016State Compliance achieved1 linked violation
- January 27, 2016State Compliance achieved1 linked violation
- January 27, 2016State Compliance achieved1 linked violation
- January 27, 2016State Compliance achieved1 linked violation
- January 11, 2016State Public Notification requested1 linked violation
- January 11, 2016State Formal Notice of Violation issued1 linked violation
- January 11, 2016State Public Notification requested1 linked violation
- January 11, 2016State Formal Notice of Violation issued1 linked violation
- January 11, 2016State Public Notification requested1 linked violation
- January 11, 2016State Formal Notice of Violation issued1 linked violation
- December 18, 2015State Public Notification requested1 linked violation
- December 18, 2015State Formal Notice of Violation issued1 linked violation
- December 9, 2015State Compliance achieved1 linked violation
- December 9, 2015State Compliance achieved1 linked violation
- December 9, 2015State Compliance achieved1 linked violation
- December 4, 2015State Public Notification requested1 linked violation
- December 4, 2015State Formal Notice of Violation issued1 linked violation
- December 4, 2015State Public Notification requested2 linked violations
- December 4, 2015State Formal Notice of Violation issued1 linked violation
- November 4, 2015State Formal Notice of Violation issued1 linked violation
- November 4, 2015State Public Notification requested1 linked violation
- November 4, 2015State Public Notification requested1 linked violation
- November 4, 2015State Formal Notice of Violation issued1 linked violation
- September 21, 2015State Public Notification requested1 linked violation
- September 21, 2015State Formal Notice of Violation issued1 linked violation
- September 9, 2015State Public Notification requested1 linked violation
- September 9, 2015State Formal Notice of Violation issued1 linked violation
- August 24, 2015State Formal Notice of Violation issued1 linked violation
- August 24, 2015State Public Notification requested1 linked violation
- August 19, 2015State Compliance achieved1 linked violation
- August 19, 2015State Compliance achieved1 linked violation
- June 2, 2015State Compliance achieved1 linked violation
- June 2, 2015State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- June 2, 2015State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- June 2, 2015State Compliance achieved1 linked violation
- June 2, 2015State Compliance achieved1 linked violation
- April 30, 2015State Compliance achieved1 linked violation
- April 30, 2015State Compliance achieved1 linked violation
- April 9, 2015State Compliance achieved1 linked violation
- March 23, 2015State Formal Notice of Violation issued1 linked violation
- March 23, 2015State Formal Notice of Violation issued1 linked violation
- March 23, 2015State Public Notification requested1 linked violation
- March 23, 2015State Public Notification requested1 linked violation
- March 19, 2015State Compliance achieved1 linked violation
- March 18, 2015State Compliance achieved1 linked violation
- February 23, 2015State Formal Notice of Violation issued1 linked violation
- February 23, 2015State Public Notification requested1 linked violation
- February 2, 2015State Formal Notice of Violation issued1 linked violation
- February 2, 2015State Public Notification requested1 linked violation
- January 28, 2015State Formal Notice of Violation issued1 linked violation
- January 28, 2015State Public Notification requested1 linked violation
- December 18, 2014State Public Notification requested1 linked violation
- December 18, 2014State Formal Notice of Violation issued1 linked violation
- November 12, 2014State Public Notification requested1 linked violation
- November 12, 2014State Formal Notice of Violation issued1 linked violation
- August 28, 2014State Formal Notice of Violation issued1 linked violation
- August 28, 2014State Public Notification requested1 linked violation
- March 13, 2014State Public Notification received1 linked violation
- March 4, 2014State Compliance achieved1 linked violation
- February 20, 2014State Formal Notice of Violation issued1 linked violation
- February 20, 2014State Public Notification requested1 linked violation
- February 10, 2014State Compliance achieved1 linked violation
- February 10, 2014State Compliance achieved1 linked violation
- February 4, 2014State Public Notification requested1 linked violation
- February 4, 2014State Formal Notice of Violation issued1 linked violation
- December 18, 2013State Public Notification requested1 linked violation
- December 18, 2013State Formal Notice of Violation issued1 linked violation
- December 18, 2013State Public Notification requested1 linked violation
- December 18, 2013State Formal Notice of Violation issued1 linked violation
- September 18, 2013State Public Notification received2 linked violations
- September 18, 2013State Public Notification received4 linked violations
- August 12, 2013State Compliance achieved3 linked violations
- July 17, 2013State Formal Notice of Violation issued3 linked violations
- March 26, 2013State Formal Notice of Violation issued3 linked violations
- March 26, 2013State Public Notification requested3 linked violations
- March 4, 2013State Compliance achieved2 linked violations
- February 21, 2013State Public Notification requested1 linked violation
- January 3, 2013State Formal Notice of Violation issued2 linked violations
- November 20, 2012State Public Notification requested1 linked violation
- October 30, 2012State Public Notification received1 linked violation
- September 17, 2012State Public Notification received1 linked violation
- September 17, 2012State Public Notification received1 linked violation
- September 17, 2012State Public Notification received1 linked violation
- September 17, 2012State Public Notification received1 linked violation
- September 17, 2012State Public Notification received21 linked violations
- August 22, 2012State Formal Notice of Violation issued2 linked violations
- August 21, 2012State Compliance achieved1 linked violation
- July 6, 2012State Public Notification requested22 linked violations
- July 6, 2012State Formal Notice of Violation issued22 linked violations
- April 2, 2012State Public Notification received2 linked violations
- March 28, 2012State Compliance achieved22 linked violations
- March 2, 2012State Public Notification received2 linked violations
- February 28, 2012State Compliance achieved2 linked violations
- February 23, 2012State Public Notification requested2 linked violations
- February 23, 2012State Formal Notice of Violation issued2 linked violations
- February 6, 2012State Formal Notice of Violation issued1 linked violation
- December 29, 2011State Compliance achieved3 linked violations
- December 19, 2011State Formal Notice of Violation issued3 linked violations
- December 19, 2011State Public Notification requested3 linked violations
- April 4, 2011State Compliance achieved1 linked violation
- April 4, 2011State Compliance achieved1 linked violation
- April 4, 2011State Compliance achieved1 linked violation
- April 4, 2011State Compliance achieved1 linked violation
- November 19, 2010State Public Notification requested1 linked violation
- November 19, 2010State Formal Notice of Violation issued1 linked violation
- October 27, 2010State Public Notification requested1 linked violation
- October 27, 2010State Public Notification requested1 linked violation
- October 27, 2010State Formal Notice of Violation issued1 linked violation
- October 27, 2010State Formal Notice of Violation issued1 linked violation
- October 27, 2010State Public Notification requested2 linked violations
- August 21, 2009State Formal Notice of Violation issued10 linked violations
- August 21, 2009State Formal Notice of Violation issued1 linked violation
- February 25, 2009State Compliance achieved1 linked violation
- February 25, 2009State Compliance achieved3 linked violations
- April 22, 2008State Formal Notice of Violation issued6 linked violations
- April 22, 2008State Public Notification requested4 linked violations
- January 22, 2008State Public Notification requested2 linked violations
- November 29, 2006State Public Notification requested6 linked violations
- August 28, 2006State Compliance achieved1 linked violation
- March 30, 2005State Formal Notice of Violation issued2 linked violations
- September 16, 2004State Public Notification requested1 linked violation
- September 16, 2004State Formal Notice of Violation issued2 linked violations
- August 4, 2003State Public Notification received3 linked violations
- March 26, 2003State Formal Notice of Violation issued1 linked violation
- March 26, 2003State Public Notification requested2 linked violations
- September 18, 2002State Public Notification received1 linked violation
- April 3, 2000State Compliance achieved2 linked violations
- April 3, 2000State Public Notification received2 linked violations
- January 12, 2000State Compliance achieved1 linked violation
Contact
RUFFIN, JAMIE
804-469-3703
DEWITT, VA 23846