PEARISBURG, VA · Giles County
RAM/WAYSIDE COMMUNITY WATER SYSTEM Water System
Consumer Confidence Report status
RAM/WAYSIDE COMMUNITY WATER SYSTEM must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for RAM/WAYSIDE COMMUNITY WATER SYSTEM.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Virginia’s official records. Always confirm current status with Virginia before making decisions based on this information.
System facts
- System ID (PWSID)
- VA1071920
- System type
- Community Water System
- Population served
- 147
- Service connections
- 65
- Ownership
- local government
- Water source
- surface water (rivers, lakes, or reservoirs)
RAM/WAYSIDE COMMUNITY WATER SYSTEM is one of 2,163 community water systems in Virginia in the 500 or fewer people size category, serving 147 people from surface water.
As of August 1, 2026, its federal record holds 78 entries between 1979 and 2024, all of which EPA lists as closed.
Of the 78, 73 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Total Coliform Rules, volatile organic chemicals, and inorganic chemicals.
Violation history
Lead Consumer Notice
—Lead and Copper Rule
January 1, 2024 – January 4, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 25, 2023 – February 23, 2024
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2023 – December 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2023 – December 31, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2022 – September 26, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2021 – September 26, 2023
ResolvedMonitoring, Routine (IDSE)
—Total Haloacetic Acids (HAA5)
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Routine (IDSE)
—TTHM
January 1, 2016 – December 31, 2016
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2013 – August 1, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Toluene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Benzene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
March 1, 1999 – March 31, 1999
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1998 – November 30, 1998
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1997 – December 31, 1997
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1997 – October 31, 1997
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1996 – December 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1996 – November 30, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1996 – October 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1996 – September 30, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1996 – August 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1996 – July 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1996 – June 30, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1996 – May 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1996 – April 30, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1996 – March 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1996 – February 29, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1996 – January 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1995 – December 31, 1995
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1995 – November 30, 1995
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1995 – September 30, 1995
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 1995 – August 31, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1995 – July 31, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1995 – March 31, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1995 – February 28, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1994 – December 31, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1994 – November 30, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1994 – October 31, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1994 – September 30, 1994
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 1994 – August 31, 1994
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
July 1, 1994 – July 31, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1994 – May 31, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1994 – April 30, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1994 – March 31, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1994 – February 28, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1994 – January 31, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1993 – May 31, 1993
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
March 1, 1993 – March 31, 1993
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
March 1, 1993 – March 31, 1993
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
February 1, 1993 – February 28, 1993
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
January 1, 1993 – January 31, 1993
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
January 1, 1993 – January 31, 1993
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 1992 – October 31, 1992
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
August 1, 1992 – August 31, 1992
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
June 1, 1992 – June 30, 1992
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
May 1, 1992 – May 31, 1992
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
July 1, 1991 – September 30, 1991
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 1991 – September 30, 1991
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
March 1, 1991 – March 31, 1991
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1991 – February 28, 1991
ArchivedMonitoring, Regular
—Barium
March 1, 1979 – February 28, 1981
ArchivedMonitoring, Regular
—Nitrate
March 1, 1979 – February 28, 1981
ArchivedMonitoring, Regular
—Fluoride
March 1, 1979 – February 28, 1981
ArchivedMonitoring, Regular
—Chromium
March 1, 1979 – February 28, 1981
ArchivedMonitoring, Regular
—Cadmium
March 1, 1979 – February 28, 1981
ArchivedMonitoring, Regular
—Arsenic
March 1, 1979 – February 28, 1981
Archived
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2024 – January 4, 2024 | Lead Consumer Notice | Lead and Copper Rule | — | Resolved |
| October 25, 2023 – February 23, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| January 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| October 1, 2022 – September 26, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2021 – September 26, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Routine (IDSE) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Routine (IDSE) | TTHM | — | Resolved |
| July 1, 2013 – August 1, 2013 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2011 – June 30, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| March 1, 1999 – March 31, 1999 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| November 1, 1998 – November 30, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| December 1, 1997 – December 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1997 – October 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| December 1, 1996 – December 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| November 1, 1996 – November 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1996 – October 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| September 1, 1996 – September 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| August 1, 1996 – August 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1996 – July 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| June 1, 1996 – June 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 1996 – May 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 1996 – April 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 1996 – March 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 1996 – February 29, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1996 – January 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| December 1, 1995 – December 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| November 1, 1995 – November 30, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| September 1, 1995 – September 30, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 1995 – August 31, 1995 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1995 – July 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 1995 – March 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 1995 – February 28, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 1994 – December 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 1994 – November 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 1994 – October 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 1994 – September 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 1994 – August 31, 1994 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1994 – July 31, 1994 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 1994 – May 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1994 – April 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 1994 – March 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 1994 – February 28, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1994 – January 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 1993 – May 31, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 1993 – March 31, 1993 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| March 1, 1993 – March 31, 1993 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 1993 – February 28, 1993 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1993 – January 31, 1993 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1993 – January 31, 1993 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 1992 – October 31, 1992 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 1992 – August 31, 1992 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 1992 – June 30, 1992 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 1992 – May 31, 1992 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1991 – September 30, 1991 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1991 – September 30, 1991 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| March 1, 1991 – March 31, 1991 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 1991 – February 28, 1991 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 1979 – February 28, 1981 | Monitoring, Regular | Barium | — | Archived |
| March 1, 1979 – February 28, 1981 | Monitoring, Regular | Nitrate | — | Archived |
| March 1, 1979 – February 28, 1981 | Monitoring, Regular | Fluoride | — | Archived |
| March 1, 1979 – February 28, 1981 | Monitoring, Regular | Chromium | — | Archived |
| March 1, 1979 – February 28, 1981 | Monitoring, Regular | Cadmium | — | Archived |
| March 1, 1979 – February 28, 1981 | Monitoring, Regular | Arsenic | — | Archived |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- October 2, 2024State Public Notification received2 linked violations
- August 27, 2024State Compliance achieved2 linked violations
- March 4, 2024State Public Notification received1 linked violation
- February 23, 2024State Compliance achieved1 linked violation
- February 7, 2024State Formal Notice of Violation issued1 linked violation
- January 4, 2024State Compliance achieved1 linked violation
- December 7, 2023State Formal Notice of Violation issued1 linked violation
- October 2, 2023State Public Notification requested3 linked violations
- September 26, 2023State Compliance achieved2 linked violations
- September 26, 2023State Compliance achieved2 linked violations
- October 24, 2022State Public Notification requested5 linked violations
- October 26, 2021State Formal Notice of Violation issued2 linked violations
- August 22, 2017State Compliance achieved2 linked violations
- August 22, 2017State Compliance achieved2 linked violations
- June 9, 2017State Public Notification received2 linked violations
- February 6, 2017State Public Notification requested2 linked violations
- February 6, 2017State Public Notification requested2 linked violations
- July 14, 2016State Public Notification received1 linked violation
- September 5, 2013State Formal Notice of Violation issued2 linked violations
- August 1, 2013State Compliance achieved2 linked violations
- July 21, 2011State Public Notification requested6 linked violations
- May 7, 2003State Formal Notice of Violation issued3 linked violations
- March 18, 2003State Compliance achieved23 linked violations
- February 6, 1996State Compliance achieved72 linked violations
- July 21, 1993State Public Notification issued6 linked violations
- January 25, 1993State Public Notification issued2 linked violations
- November 30, 1992State Public Notification issued7 linked violations
- July 21, 1992State Public Notification issued5 linked violations
- April 23, 1992State Public Notification issued25 linked violations
- July 19, 1991State Formal Notice of Violation issued4 linked violations
- April 19, 1991State Formal Notice of Violation issued32 linked violations
- October 22, 1990State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- October 22, 1990State Public Notification issuedgeneral compliance action — not tied to a specific violation on record
- April 20, 1990State Public Notification issuedgeneral compliance action — not tied to a specific violation on record
- September 12, 1989Federal Final Administrative Order issued2 linked violations
Common questions
Is RAM/WAYSIDE COMMUNITY WATER SYSTEM required to publish a Consumer Confidence Report?
- Yes. RAM/WAYSIDE COMMUNITY WATER SYSTEM is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is RAM/WAYSIDE COMMUNITY WATER SYSTEM’s next Consumer Confidence Report due?
- RAM/WAYSIDE COMMUNITY WATER SYSTEM’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does RAM/WAYSIDE COMMUNITY WATER SYSTEM have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for RAM/WAYSIDE COMMUNITY WATER SYSTEM.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
BELCHER, KEVIN
540-921-2525
PEARISBURG, VA 24134