CEDAR CITY, UT · Iron County
IRONTOWN Water System
Consumer Confidence Report status
IRONTOWN must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for IRONTOWN.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Utah’s official records. Always confirm current status with Utah before making decisions based on this information.
System facts
- System ID (PWSID)
- UTAH11070
- System type
- Community Water System
- Population served
- 75
- Service connections
- 55
- Ownership
- privately owned
- Water source
- groundwater (wells)
IRONTOWN is one of 338 community water systems in Utah in the 500 or fewer people size category, serving 75 people from groundwater.
As of August 1, 2026, its federal record holds 38 entries between 1997 and 2026, all of which EPA lists as closed.
Of the 38, 25 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Radionuclides and Revised Rad Rule, the Total Coliform Rules, and synthetic organic chemicals.
Violation history
Maximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
January 1, 2026 – March 31, 2026
ArchivedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
October 1, 2025 – December 31, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
July 1, 2025 – September 30, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
April 1, 2025 – June 30, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Radium (-226 and -228)
April 1, 2025 – February 10, 2025
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
January 1, 2025 – March 31, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Radium (-226 and -228)
October 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2023 – December 31, 2023
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
October 1, 2023 – December 31, 2023
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
October 1, 2017 – December 5, 2018
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2017 – December 31, 2017
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
May 2, 2016 – March 23, 2017
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2015 – July 31, 2015
ResolvedMonitoring, Source Water (GWR)
—E. COLI
August 1, 2014 – September 6, 2014
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 4, 2013 – April 27, 2015
ResolvedMonitoring, Regular
—Radium-228
January 1, 2013 – March 31, 2013
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
December 1, 2010 – December 31, 2010
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2010 – January 21, 2011
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
August 1, 2008 – August 31, 2008
ResolvedMonitoring, Regular
—Radium-226
January 1, 2008 – December 29, 2010
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2008 – December 29, 2010
ResolvedMonitoring, Regular
—Selenium
January 1, 2008 – December 29, 2010
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2008 – December 29, 2010
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2008 – December 29, 2010
ResolvedMonitoring, Regular
—Barium
January 1, 2008 – December 29, 2010
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
September 1, 2005 – September 30, 2005
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2005 – August 7, 2007
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2005 – August 7, 2007
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2005 – September 11, 2007
ResolvedMonitoring, Regular
—Nitrate
January 1, 2005 – December 31, 2005
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2005 – January 25, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2003 – December 31, 2003
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
November 1, 2003 – November 30, 2003
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2003 – August 31, 2003
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2000 – June 30, 2000
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 1998 – December 31, 2000
ResolvedMonitoring, Regular
—Carbofuran
January 1, 1998 – December 31, 2000
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 1997 – December 31, 2000
Resolved
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2026 – March 31, 2026 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| October 1, 2025 – December 31, 2025 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| July 1, 2025 – September 30, 2025 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| April 1, 2025 – June 30, 2025 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| April 1, 2025 – February 10, 2025 | Maximum Contaminant Level Violation, Average | Combined Radium (-226 and -228) | Health-based | Resolved |
| January 1, 2025 – March 31, 2025 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| October 1, 2024 – December 31, 2024 | Maximum Contaminant Level Violation, Average | Combined Radium (-226 and -228) | Health-based | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2023 – December 31, 2023 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Resolved |
| October 1, 2017 – December 5, 2018 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2017 – December 31, 2017 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| May 2, 2016 – March 23, 2017 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2015 – July 31, 2015 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| August 1, 2014 – September 6, 2014 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| February 4, 2013 – April 27, 2015 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 1, 2013 – March 31, 2013 | Monitoring, Regular | Radium-228 | — | Resolved |
| December 1, 2010 – December 31, 2010 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2010 – January 21, 2011 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| August 1, 2008 – August 31, 2008 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 2008 – December 29, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2008 – December 29, 2010 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2008 – December 29, 2010 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2008 – December 29, 2010 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 2008 – December 29, 2010 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2008 – December 29, 2010 | Monitoring, Regular | Barium | — | Resolved |
| September 1, 2005 – September 30, 2005 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2005 – August 7, 2007 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2005 – August 7, 2007 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2005 – September 11, 2007 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2005 – December 31, 2005 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2005 – January 25, 2007 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| December 1, 2003 – December 31, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2003 – November 30, 2003 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2003 – August 31, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2000 – June 30, 2000 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1998 – December 31, 2000 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 1998 – December 31, 2000 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 1997 – December 31, 2000 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
Enforcement actions
- February 27, 2026State Public Notification requested1 linked violation
- January 31, 2026State Formal Notice of Violation issued1 linked violation
- November 22, 2025State Public Notification requested1 linked violation
- October 26, 2025State Formal Notice of Violation issued1 linked violation
- August 27, 2025State Public Notification requested1 linked violation
- August 27, 2025State Public Notification requested1 linked violation
- July 31, 2025State Formal Notice of Violation issued1 linked violation
- July 31, 2025State Formal Notice of Violation issued1 linked violation
- June 1, 2025State Public Notification requested1 linked violation
- May 5, 2025State Formal Notice of Violation issued1 linked violation
- April 17, 2025State Compliance achieved1 linked violation
- April 17, 2025State Compliance achieved1 linked violation
- February 10, 2025State Compliance achieved1 linked violation
- January 16, 2025State Formal Notice of Violation issued1 linked violation
- May 1, 2024State Compliance achieved1 linked violation
- January 26, 2024State Formal Notice of Violation issued1 linked violation
- January 26, 2024State Formal Notice of Violation issued1 linked violation
- January 23, 2024State Public Notification requested1 linked violation
- December 5, 2018State Compliance achieved1 linked violation
- February 16, 2018State Compliance achieved2 linked violations
- January 29, 2018State Public Notification requested2 linked violations
- January 29, 2018State Formal Notice of Violation issued2 linked violations
- January 26, 2018State Compliance achieved2 linked violations
- December 22, 2017State Formal Notice of Violation issued1 linked violation
- December 22, 2017State Public Notification requested1 linked violation
- March 23, 2017State Compliance achieved1 linked violation
- March 16, 2017State Public Notification requested1 linked violation
- March 16, 2017State Formal Notice of Violation issued1 linked violation
- March 16, 2017State Compliance achieved1 linked violation
- May 23, 2016State Formal Notice of Violation issued1 linked violation
- May 23, 2016State Public Notification requested1 linked violation
- September 24, 2015State Compliance achieved2 linked violations
- September 19, 2015State Public Notification requested2 linked violations
- September 19, 2015State Formal Notice of Violation issued4 linked violations
- August 11, 2015State Compliance achieved1 linked violation
- August 11, 2015State Compliance achieved1 linked violation
- August 11, 2015State Compliance achieved1 linked violation
- August 11, 2015State Compliance achieved1 linked violation
- July 8, 2015State Compliance achieved4 linked violations
- July 8, 2015State Compliance achieved1 linked violation
- May 3, 2015State Formal Notice of Violation issued5 linked violations
- May 3, 2015State Compliance achieved4 linked violations
- April 27, 2015State Compliance achieved1 linked violation
- September 6, 2014State Formal Notice of Violation issued3 linked violations
- September 6, 2014State Compliance achieved3 linked violations
- January 30, 2014State Formal Notice of Violation issued1 linked violation
- January 30, 2014State Public Notification requested1 linked violation
- January 30, 2014State Formal Notice of Violation issued1 linked violation
- January 30, 2014State Public Notification requested1 linked violation
- September 23, 2013State Compliance achieved1 linked violation
- September 23, 2013State Compliance achieved1 linked violation
- September 23, 2013State Compliance achieved1 linked violation
- September 23, 2013State Compliance achieved1 linked violation
- September 22, 2013State Compliance achieved1 linked violation
- August 9, 2013State Public Notification requested1 linked violation
- August 9, 2013State Formal Notice of Violation issued1 linked violation
- August 9, 2013State Public Notification requested1 linked violation
- August 9, 2013State Formal Notice of Violation issued1 linked violation
- August 9, 2013State Formal Notice of Violation issued1 linked violation
- August 9, 2013State Public Notification requested1 linked violation
- May 22, 2013State Compliance achieved1 linked violation
- April 25, 2013State Formal Notice of Violation issued1 linked violation
- April 25, 2013State Public Notification requested1 linked violation
- April 25, 2013State Formal Notice of Violation issued1 linked violation
- April 25, 2013State Public Notification requested1 linked violation
- April 25, 2013State Formal Notice of Violation issued1 linked violation
- April 25, 2013State Public Notification requested1 linked violation
- April 24, 2013State Public Notification requested1 linked violation
- March 13, 2013State Public Notification requested1 linked violation
- March 13, 2013State Formal Notice of Violation issued1 linked violation
- March 13, 2013State Public Notification requested1 linked violation
- March 13, 2013State Public Notification requested1 linked violation
- March 13, 2013State Formal Notice of Violation issued1 linked violation
- March 13, 2013State Public Notification requested1 linked violation
- March 13, 2013State Formal Notice of Violation issued1 linked violation
- July 15, 2012State Public Notification requested3 linked violations
- April 24, 2012State Formal Notice of Violation issued1 linked violation
- April 24, 2012State Formal Notice of Violation issued1 linked violation
- May 2, 2011State Compliance achieved3 linked violations
- March 13, 2011State Formal Notice of Violation issued1 linked violation
- March 13, 2011State Public Notification requested1 linked violation
- March 13, 2011State Formal Notice of Violation issued1 linked violation
- March 13, 2011State Public Notification requested1 linked violation
- February 10, 2011State Compliance achieved1 linked violation
- January 31, 2011State Compliance achieved1 linked violation
- January 30, 2011State Formal Notice of Violation issued2 linked violations
- January 21, 2011State Compliance achieved2 linked violations
- January 21, 2011State Formal Notice of Violation issued3 linked violations
- January 19, 2011State Formal Notice of Violation issued1 linked violation
- January 17, 2011State Public Notification requested5 linked violations
- January 17, 2011State Formal Notice of Violation issued5 linked violations
- January 17, 2011State Formal Notice of Violation issued12 linked violations
- January 17, 2011State Public Notification requested12 linked violations
- January 16, 2011State Public Notification requested1 linked violation
- January 16, 2011State Formal Notice of Violation issued1 linked violation
- January 16, 2011State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 8, 2011State Formal Notice of Violation issued1 linked violation
- January 8, 2011State Public Notification requested1 linked violation
- December 29, 2010State Compliance achieved5 linked violations
- December 29, 2010State Compliance achieved12 linked violations
- December 29, 2010State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- December 29, 2010State Compliance achieved1 linked violation
- November 30, 2010State Compliance achieved1 linked violation
- September 26, 2010State Compliance achieved1 linked violation
- September 25, 2008State Public Notification requested1 linked violation
- February 15, 2006State Compliance achieved1 linked violation
- November 10, 2005State Public Notification requested2 linked violations
- November 10, 2005State Violation/Reminder Notice2 linked violations
- November 10, 2005State Public Notification requested2 linked violations
- August 22, 2002State Formal Notice of Violation issued4 linked violations
Common questions
Is IRONTOWN required to publish a Consumer Confidence Report?
- Yes. IRONTOWN is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is IRONTOWN’s next Consumer Confidence Report due?
- IRONTOWN’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does IRONTOWN have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for IRONTOWN.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
FELTNER, TRACY HOBART
435-865-9901
CEDAR CITY, UT 84720