POINT, TX · Rains County
CITY OF POINT Water System
Consumer Confidence Report status
CITY OF POINT must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 2 items for CITY OF POINT that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Texas’s official records. Always confirm current status with Texas before making decisions based on this information.
System facts
- System ID (PWSID)
- TX1900004
- System type
- Community Water System
- Population served
- 3,600
- Service connections
- 1,200
- Ownership
- local government
- Water source
- surface water (rivers, lakes, or reservoirs)
CITY OF POINT is one of 817 community water systems in Texas in the 3,301 to 10,000 people size category, serving 3,600 people from surface water.
As of August 1, 2026, its federal record holds 93 entries between 2008 and 2023, of which 2 remain open; none are health-based.
Of the 93, 78 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Surface Water Treatment Rules, volatile organic chemicals, and the Public Notice Rule and Revised PN Rule.
Violation history
Public Notification Violation for NPDWR Violation
—Public Notice
December 31, 2023
UnaddressedPublic Notification Violation for NPDWR Violation
—Public Notice
September 2, 2023 – April 18, 2024
ResolvedSingle Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
May 1, 2023 – May 31, 2023
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
January 1, 2023 – January 31, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 1, 2022 – December 5, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 1, 2022 – November 15, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 27, 2022 – December 5, 2022
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
June 1, 2022 – June 30, 2022
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
May 1, 2022 – May 31, 2022
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2022 – March 31, 2022
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
February 1, 2022 – February 28, 2022
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2022 – February 28, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2022 – February 28, 2022
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2022 – January 31, 2022
ResolvedMonitoring of Treatment (SWTR-Filter)
—Long Term 2 Enhanced Surface Water Treatment Rule
January 1, 2022 – January 31, 2022
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
January 1, 2022 – January 31, 2022
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—Total Haloacetic Acids (HAA5)
December 29, 2021 – November 7, 2024
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—TTHM
December 29, 2021 – November 7, 2024
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
December 1, 2021 – December 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2021 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2021 – November 30, 2021
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
November 1, 2021 – November 30, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2021 – November 30, 2021
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2021 – August 16, 2023
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2021 – October 31, 2021
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—Total Haloacetic Acids (HAA5)
September 22, 2021 – November 7, 2024
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
September 1, 2021 – September 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2021 – September 30, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2021 – September 30, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2021 – September 30, 2021
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
August 1, 2021 – August 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 2021 – August 31, 2021
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
August 1, 2021 – August 31, 2021
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
July 1, 2021 – July 31, 2021
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
July 1, 2021 – September 30, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 2021 – July 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 2021 – July 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 2021 – July 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 2021 – June 30, 2021
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
June 1, 2021 – June 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2021 – June 30, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 2021 – June 30, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 2021 – May 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2021 – May 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Long Term 2 Enhanced Surface Water Treatment Rule
May 1, 2021 – May 31, 2021
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
May 1, 2021 – May 31, 2021
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2021 – April 30, 2021
ResolvedSingle Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2021 – April 30, 2021
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2021 – March 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2021 – March 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2021 – March 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2021 – February 28, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2020 – December 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2020 – October 31, 2020
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 16, 2020 – May 5, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 22, 2019
UnaddressedPublic Notification Violation for NPDWR Violation
—Public Notice
August 12, 2019 – March 12, 2020
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2018 – December 21, 2018
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
July 1, 2018 – December 31, 2018
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
July 1, 2018 – September 30, 2018
ArchivedLead Consumer Notice
—Lead and Copper Rule
April 1, 2018 – December 20, 2018
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
March 1, 2018 – March 31, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 1, 2018 – March 12, 2020
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
January 1, 2018 – June 30, 2018
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2017 – February 14, 2018
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
January 1, 2009 – March 31, 2009
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Xylenes, Total
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—DICHLOROMETHANE
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—o-Dichlorobenzene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—p-Dichlorobenzene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Vinyl chloride
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—1,2-Dichloroethane
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Carbon tetrachloride
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—1,2-Dichloropropane
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Trichloroethylene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Tetrachloroethylene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—CHLOROBENZENE
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Benzene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Toluene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Ethylbenzene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Styrene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
July 1, 2008 – September 30, 2008
Resolved
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| December 31, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| September 2, 2023 – April 18, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 1, 2023 – May 31, 2023 | Single Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| January 1, 2023 – January 31, 2023 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| December 1, 2022 – December 5, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 1, 2022 – November 15, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 27, 2022 – December 5, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| June 1, 2022 – June 30, 2022 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| May 1, 2022 – May 31, 2022 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| March 1, 2022 – March 31, 2022 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2022 – February 28, 2022 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| February 1, 2022 – February 28, 2022 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2022 – February 28, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2022 – January 31, 2022 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2022 – January 31, 2022 | Monitoring of Treatment (SWTR-Filter) | Long Term 2 Enhanced Surface Water Treatment Rule | — | Resolved |
| January 1, 2022 – January 31, 2022 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| December 29, 2021 – November 7, 2024 | Failure Submit IDSE/Subpart V Plan Rpt | Total Haloacetic Acids (HAA5) | — | Resolved |
| December 29, 2021 – November 7, 2024 | Failure Submit IDSE/Subpart V Plan Rpt | TTHM | — | Resolved |
| December 1, 2021 – December 31, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| December 1, 2021 – December 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2021 – November 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2021 – November 30, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| November 1, 2021 – November 30, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2021 – August 16, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2021 – October 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 22, 2021 – November 7, 2024 | Failure Submit IDSE/Subpart V Plan Rpt | Total Haloacetic Acids (HAA5) | — | Resolved |
| September 1, 2021 – September 30, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| September 1, 2021 – September 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2021 – September 30, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 2021 – September 30, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2021 – August 31, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| August 1, 2021 – August 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2021 – August 31, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| July 1, 2021 – July 31, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| July 1, 2021 – September 30, 2021 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| July 1, 2021 – July 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2021 – July 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2021 – July 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 2021 – June 30, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 2021 – June 30, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| June 1, 2021 – June 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2021 – June 30, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2021 – May 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2021 – May 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2021 – May 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Long Term 2 Enhanced Surface Water Treatment Rule | — | Resolved |
| May 1, 2021 – May 31, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Single Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| March 1, 2021 – March 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2021 – March 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2021 – March 31, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2021 – February 28, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| December 1, 2020 – December 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2020 – October 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 16, 2020 – May 5, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 22, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| August 12, 2019 – March 12, 2020 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2018 – December 21, 2018 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2018 – December 31, 2018 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Archived |
| April 1, 2018 – December 20, 2018 | Lead Consumer Notice | Lead and Copper Rule | — | Resolved |
| March 1, 2018 – March 31, 2018 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| March 1, 2018 – March 12, 2020 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2018 – June 30, 2018 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2017 – February 14, 2018 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2009 – March 31, 2009 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| October 1, 2008 – December 31, 2008 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Benzene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Toluene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Styrene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- February 12, 2026State Public Notification received1 linked violation
- January 16, 2026State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- April 30, 2025State Violation/Reminder Notice1 linked violation
- February 12, 2025State Violation/Reminder Notice1 linked violation
- February 12, 2025State Public Notification requested1 linked violation
- November 7, 2024State Compliance achieved4 linked violations
- April 19, 2024State Violation/Reminder Notice1 linked violation
- April 18, 2024State Public Notification received1 linked violation
- April 18, 2024State Public Notification received1 linked violation
- April 18, 2024State Compliance achieved1 linked violation
- April 18, 2024State Compliance achieved1 linked violation
- April 18, 2024State Public Notification received1 linked violation
- April 18, 2024State Compliance achieved1 linked violation
- April 18, 2024State Public Notification received1 linked violation
- April 18, 2024State Compliance achieved1 linked violation
- January 24, 2024State Violation/Reminder Notice1 linked violation
- December 1, 2023State Compliance achieved7 linked violations
- October 19, 2023State Violation/Reminder Notice1 linked violation
- September 20, 2023State Violation/Reminder Notice1 linked violation
- August 16, 2023State Compliance achieved3 linked violations
- August 1, 2023State Public Notification received1 linked violation
- July 19, 2023State Violation/Reminder Notice1 linked violation
- July 1, 2023State Compliance achieved1 linked violation
- May 25, 2023State Public Notification requested1 linked violation
- May 15, 2023State Compliance achieved1 linked violation
- April 28, 2023State Violation/Reminder Notice1 linked violation
- March 22, 2023State Public Notification requested1 linked violation
- March 22, 2023State Violation/Reminder Notice1 linked violation
- March 6, 2023State Compliance achieved1 linked violation
- January 10, 2023State Compliance achieved7 linked violations
- December 29, 2022State Violation/Reminder Notice1 linked violation
- December 29, 2022State Public Notification requested1 linked violation
- December 6, 2022State Compliance achieved1 linked violation
- December 5, 2022State Public Notification received1 linked violation
- December 5, 2022State Public Notification received1 linked violation
- December 5, 2022State Public Notification received1 linked violation
- December 5, 2022State Public Notification received1 linked violation
- December 5, 2022State Compliance achieved1 linked violation
- December 5, 2022State Public Notification received1 linked violation
- December 5, 2022State Compliance achieved2 linked violations
- December 5, 2022State Public Notification received1 linked violation
- December 1, 2022State Compliance achieved47 linked violations
- November 17, 2022State Public Notification requested1 linked violation
- November 17, 2022State Violation/Reminder Notice1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Compliance achieved2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received3 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received2 linked violations
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 15, 2022State Public Notification received1 linked violation
- November 14, 2022State Compliance achieved1 linked violation
- November 1, 2022State Violation/Reminder Notice3 linked violations
- October 1, 2022State Compliance achieved12 linked violations
- October 1, 2022State Compliance achieved2 linked violations
- October 1, 2022State Compliance achieved2 linked violations
- September 30, 2022State Public Notification requested2 linked violations
- August 31, 2022State Public Notification requested2 linked violations
- August 31, 2022State Violation/Reminder Notice1 linked violation
- August 19, 2022State Public Notification requested2 linked violations
- August 16, 2022State Public Notification requested2 linked violations
- August 2, 2022State Public Notification received2 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- August 1, 2022State Violation/Reminder Notice4 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Violation/Reminder Notice4 linked violations
- August 1, 2022State Violation/Reminder Notice2 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Public Notification requested3 linked violations
- August 1, 2022State Public Notification requested3 linked violations
- August 1, 2022State Public Notification requested3 linked violations
- August 1, 2022State Public Notification requested22 linked violations
- August 1, 2022State Public Notification requested7 linked violations
- August 1, 2022State Public Notification requested3 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Violation/Reminder Notice3 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Violation/Reminder Notice4 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Public Notification requested4 linked violations
- August 1, 2022State Public Notification requested3 linked violations
- August 1, 2022State Public Notification requested3 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- August 1, 2022State Public Notification requested2 linked violations
- July 15, 2022State Public Notification requested4 linked violations
- May 9, 2022State Public Notification requested3 linked violations
- April 4, 2022State Public Notification received4 linked violations
- April 4, 2022State Public Notification received5 linked violations
- April 4, 2022State Public Notification received5 linked violations
- April 4, 2022State Public Notification received4 linked violations
- March 7, 2022State Public Notification requested4 linked violations
- March 1, 2022State Compliance achieved1 linked violation
- February 23, 2022State Public Notification requested4 linked violations
- January 11, 2022State Public Notification requested4 linked violations
- January 6, 2022State Compliance achieved18 linked violations
- January 6, 2022State Violation/Reminder Notice23 linked violations
- December 17, 2021State Violation/Reminder Notice4 linked violations
- November 29, 2021State Public Notification requested5 linked violations
- November 8, 2021State Public Notification requested5 linked violations
- July 28, 2021State Violation/Reminder Notice5 linked violations
- June 28, 2021State Public Notification requested5 linked violations
- May 5, 2021State Compliance achieved12 linked violations
- May 5, 2021State Public Notification received26 linked violations
- April 21, 2021State Public Notification requested6 linked violations
- April 5, 2021State Public Notification requested5 linked violations
- January 27, 2021State Violation/Reminder Notice5 linked violations
- November 9, 2020State Violation/Reminder Notice32 linked violations
- September 1, 2020State Violation/Reminder Notice26 linked violations
- March 12, 2020State Compliance achieved4 linked violations
- March 12, 2020State Compliance achieved27 linked violations
- September 11, 2019State Public Notification requested16 linked violations
- May 15, 2019State Public Notification requested5 linked violations
- December 13, 2018State Public Notification received6 linked violations
- December 13, 2018State Compliance achieved5 linked violations
- December 13, 2018State Public Notification received7 linked violations
- November 20, 2018State Public Notification requested12 linked violations
- September 5, 2018State Compliance achieved9 linked violations
- March 8, 2018State Public Notification requested9 linked violations
- August 16, 2017State Violation/Reminder Notice16 linked violations
- April 17, 2009State Formal Notice of Violation issued22 linked violations
- April 13, 2009State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- March 30, 2009State Violation/Reminder Notice1 linked violation
- March 30, 2009State Public Notification requested1 linked violation
- March 28, 2009State Public Notification received1 linked violation
- March 5, 2009State Public Notification requested1 linked violation
- March 5, 2009State Formal Notice of Violation issued1 linked violation
- November 17, 2006State Compliance achieved43 linked violations
- November 1, 1990State Injunction1 linked violation
- October 1, 1990State Injunction1 linked violation
- August 1, 1980Federal issued Formal Notice of Violationgeneral compliance action — not tied to a specific violation on record
Common questions
Is CITY OF POINT required to publish a Consumer Confidence Report?
- Yes. CITY OF POINT is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is CITY OF POINT’s next Consumer Confidence Report due?
- CITY OF POINT’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does CITY OF POINT have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 2 items for CITY OF POINT that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
NELSON, ANGELA
903-598-3296
POINT, TX 75472-5522