ASHAWAY, RI · Washington County
BETHEL VILLAGE WATER ASSN Water System
Consumer Confidence Report status
BETHEL VILLAGE WATER ASSN must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 item for BETHEL VILLAGE WATER ASSN that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Rhode Island’s official records. Always confirm current status with Rhode Island before making decisions based on this information.
System facts
- System ID (PWSID)
- RI1000045
- System type
- Community Water System
- Population served
- 180
- Service connections
- 53
- Ownership
- privately owned
- Water source
- groundwater (wells)
BETHEL VILLAGE WATER ASSN is one of 119 community water systems in Rhode Island in the 500 or fewer people size category, serving 180 people from groundwater.
As of August 1, 2026, its federal record holds 77 entries between 2010 and 2026, of which 1 remains open; none are health-based.
Of the 77, 69 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, volatile organic chemicals, and inorganic chemicals.
Violation history
Follow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2026
UnaddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025 – July 2, 2025
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2025 – February 4, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Regular
—Cadmium
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Chlordane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Nitrate
January 1, 2024 – December 31, 2024
ResolvedFailure to Conduct Assessment Monitoring
—E. COLI
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Nitrite
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Arsenic
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Barium
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—CYANIDE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Mercury
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Selenium
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Benzene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Toluene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Styrene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Endrin
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Dalapon
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Simazine
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Picloram
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Aldicarb sulfone
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Aldicarb
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Atrazine
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—LASSO
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—2,4-D
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2024 – December 31, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 2, 2023 – July 1, 2024
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2023 – June 20, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2022 – June 9, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2022 – June 20, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2021 – June 20, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 4, 2021 – May 13, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 4, 2021 – May 13, 2021
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 2, 2020 – December 28, 2020
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2020 – June 20, 2023
ResolvedLead Consumer Notice
—Lead and Copper Rule
December 30, 2019 – September 1, 2020
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 11, 2017 – October 3, 2018
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 2, 2017 – April 2, 2018
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2017 – April 2, 2018
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2016 – March 17, 2017
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2010 – March 31, 2010
Resolved
Unaddressed no corrective action on record yetResolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2026 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2025 – July 2, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2025 – February 4, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2024 – December 31, 2024 | Failure to Conduct Assessment Monitoring | E. COLI | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | CYANIDE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Aldicarb | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| April 2, 2023 – July 1, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2023 – June 20, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2022 – June 9, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – June 20, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2021 – June 20, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| April 4, 2021 – May 13, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 4, 2021 – May 13, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 2, 2020 – December 28, 2020 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| October 1, 2020 – June 20, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| December 30, 2019 – September 1, 2020 | Lead Consumer Notice | Lead and Copper Rule | — | Resolved |
| October 11, 2017 – October 3, 2018 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 2, 2017 – April 2, 2018 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2017 – April 2, 2018 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| October 1, 2016 – March 17, 2017 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Unaddressed no corrective action on record yetResolved addressed and confirmed by the state
Enforcement actions
- May 10, 2023State Bilateral Compliance Agreement signedgeneral compliance action — not tied to a specific violation on record
- October 9, 2018State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- April 15, 2010State Public Notification received580 linked violations
- December 13, 1995State Bilateral Compliance Agreement signedgeneral compliance action — not tied to a specific violation on record
- August 22, 1995State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 22, 1994State Compliance Meeting conducted420 linked violations
- August 22, 1994State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 29, 1994State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- July 26, 1994State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 26, 1994State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 26, 1994State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
Common questions
Is BETHEL VILLAGE WATER ASSN required to publish a Consumer Confidence Report?
- Yes. BETHEL VILLAGE WATER ASSN is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is BETHEL VILLAGE WATER ASSN’s next Consumer Confidence Report due?
- BETHEL VILLAGE WATER ASSN’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does BETHEL VILLAGE WATER ASSN have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 item for BETHEL VILLAGE WATER ASSN that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
BOUCHER, TROY
401-623-0041
ASHAWAY, RI 02804