Drinking Water Compliance OS

PENNSYLVANIA FURNACE, PA · Centre County

ROCK SPRING WATER CO Water System

Current status

1 item on record is open and awaiting resolution as of July 4, 2026. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings. Full details are in the violation history below.

This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.

Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Pennsylvania’s official records. Always confirm current status with Pennsylvania before making decisions based on this information.

System facts

System ID (PWSID)
PA4140085
System type
Community Water System
Population served
1,000
Service connections
451
Ownership
privately owned
Water source
groundwater (wells)

Violation history

  • Monitoring of Treatment (SWTR-Unfilt/GWR)

    Groundwater Rule

    September 1, 2025 – September 30, 2025

    Resolved
  • Monitoring of Treatment (SWTR-Unfilt/GWR)

    Groundwater Rule

    February 1, 2025 – February 28, 2025

    Resolved
  • Monitoring of Treatment (SWTR-Unfilt/GWR)

    Groundwater Rule

    January 1, 2025 – January 31, 2025

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    July 1, 2024 – September 30, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    August 29, 2022 – November 16, 2022

    Resolved
  • Notify Level 1/Level 2 Treatment Technique Violation, Correct Action (RTCR)

    Revised Total Coliform Rule

    July 19, 2022 – November 16, 2022

    Resolved
  • Treatment Technique, Level 2 Assessment (RTCR)

    Health-based

    Revised Total Coliform Rule

    July 19, 2022 – November 16, 2022

    Resolved
  • Consumer Confidence Report Complete Failure to Report

    Consumer Confidence Rule

    July 1, 2022 – August 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Nitrite

    January 1, 2022 – December 31, 2022

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 31, 2021 – August 25, 2022

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2021 – December 22, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Unfilt/GWR)

    Groundwater Rule

    October 1, 2021 – October 31, 2021

    Resolved
  • Treatment Technique, Level 1 Assessment (RTCR)

    Health-based

    Revised Total Coliform Rule

    September 20, 2021 – July 29, 2022

    Resolved
  • Notify Level 1/Level 2 Treatment Technique Violation, Correct Action (RTCR)

    Revised Total Coliform Rule

    September 20, 2021 – July 29, 2022

    Resolved
  • Failure To Address Deficiency

    Health-based

    Groundwater Rule

    September 17, 2021 – August 25, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    July 1, 2021 – September 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    July 1, 2021 – September 30, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    April 11, 2021 – November 23, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    August 31, 2020 – November 24, 2021

    Resolved
  • Treatment Technique, Level 1 Assessment (RTCR)

    Health-based

    Revised Total Coliform Rule

    July 21, 2020 – July 18, 2022

    Resolved
  • Notify Level 1/Level 2 Treatment Technique Violation, Correct Action (RTCR)

    Revised Total Coliform Rule

    July 21, 2020 – July 18, 2022

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Heptachlor

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    LASSO

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Atrazine

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Carbofuran

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Dinoseb

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Simazine

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    OXAMYL

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Endothall

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Diquat

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Dalapon

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Toxaphene

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Methoxychlor

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Endrin

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    Picloram

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    July 1, 2020 – September 30, 2020

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    July 1, 2020 – September 30, 2020

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2020 – June 5, 2020

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Endrin

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Methoxychlor

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Toxaphene

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Dalapon

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Diquat

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Endothall

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    OXAMYL

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Simazine

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Dinoseb

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Carbofuran

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Atrazine

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    LASSO

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Heptachlor

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Regular

    Chlordane

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    July 1, 2019 – September 30, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    July 1, 2019 – September 30, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 11, 2019 – May 6, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    January 1, 2019 – March 31, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2018 – May 6, 2019

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 11, 2018

    Unaddressed
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2018 – December 31, 2018

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2018 – September 30, 2018

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    July 1, 2018 – September 30, 2018

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    July 1, 2018 – September 30, 2018

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2018 – June 30, 2018

    Resolved
  • Treatment Technique, Level 1 Assessment (RTCR)

    Health-based

    Revised Total Coliform Rule

    November 21, 2017 – January 26, 2018

    Resolved
  • Notify Level 1/Level 2 Treatment Technique Violation, Correct Action (RTCR)

    Revised Total Coliform Rule

    November 21, 2017 – January 26, 2018

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    July 1, 2017 – September 30, 2017

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    July 1, 2017 – September 30, 2017

    Resolved
  • Monitoring, Regular

    1,1,1-Trichloroethane

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    Styrene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    Ethylbenzene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    Toluene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    Benzene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    Trichloroethylene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    1,2-Dichloropropane

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    trans-1,2-Dichloroethylene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    o-Dichlorobenzene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    DICHLOROMETHANE

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    2,4-D

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Regular

    Glyphosate

    January 1, 2017 – December 31, 2017

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    July 1, 2014 – September 30, 2014

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    July 1, 2014 – September 30, 2014

    Resolved
  • Monitoring, Regular

    Glyphosate

    July 1, 2011 – September 30, 2011

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    July 1, 2011 – September 30, 2011

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    July 1, 2011 – September 30, 2011

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    July 1, 2011 – September 30, 2011

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    July 1, 2011 – September 30, 2011

    Resolved
  • Monitoring, Regular

    2,4-D

    July 1, 2011 – September 30, 2011

    Resolved
  • Monitoring, Regular

    Chlordane

    July 1, 2011 – September 30, 2011

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2009 – June 18, 2009

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2008 – December 30, 2008

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    July 1, 2007 – September 30, 2007

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    July 1, 2007 – September 30, 2007

    Resolved
  • Consumer Confidence Report Complete Failure to Report

    Consumer Confidence Rule

    July 1, 2005 – September 29, 2005

    Resolved
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    o-Dichlorobenzene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    DICHLOROMETHANE

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Toluene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Atrazine

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    January 1, 2005 – March 31, 2005

    Resolved
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Styrene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Ethylbenzene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Benzene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Trichloroethylene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    1,2-Dichloropropane

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    1,1,1-Trichloroethane

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    trans-1,2-Dichloroethylene

    January 1, 2005 – December 31, 2005

    Resolved
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 2005 – December 31, 2005

    Resolved
  • Maximum Contaminant Level Violation, Monthly (TCR)

    Health-based

    Coliform (TCR)

    August 1, 2003 – August 31, 2003

    Resolved
  • Maximum Contaminant Level Violation, Acute (TCR)

    Health-based

    Coliform (TCR)

    August 1, 2003 – August 31, 2003

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 2003 – December 31, 2003

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    o-Dichlorobenzene

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    trans-1,2-Dichloroethylene

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Benzene

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Ethylbenzene

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Styrene

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 1995 – December 31, 1995

    Resolved
  • Maximum Contaminant Level Violation, Monthly (TCR)

    Health-based

    Coliform (TCR)

    November 1, 1991 – November 30, 1991

    Resolved

Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet

Enforcement actions

Contact

ROCK SPRING WATER CO

814-231-2911

PENNSYLVANIA FURNACE, PA 16865