TRUMBAUERSVILLE, PA · Monroe County
POCONO PLATEAU PARK WELL 1 Water System
Current status
4 items on record are open and awaiting resolution as of July 4, 2026. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings. Full details are in the violation history below.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Pennsylvania’s official records. Always confirm current status with Pennsylvania before making decisions based on this information.
System facts
- System ID (PWSID)
- PA2450097
- System type
- Community Water System
- Population served
- 60
- Service connections
- 37
- Ownership
- privately owned
- Water source
- groundwater (wells)
Violation history
Consumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2023 – December 4, 2023
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2022 – June 30, 2022
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
March 1, 2022 – March 31, 2022
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—2,3,7,8-TCDD
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—LASSO
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Atrazine
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Picloram
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Simazine
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Endothall
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Diquat
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Dalapon
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Endrin
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—2,4-D
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Asbestos
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Chlordane
January 1, 2022 – December 31, 2022
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2021 – December 31, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 13, 2021
UnaddressedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
September 1, 2021 – September 30, 2021
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
September 1, 2021 – September 30, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 11, 2021 – August 24, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – August 24, 2021
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
November 1, 2020 – November 30, 2020
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2020 – August 9, 2021
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2020 – June 30, 2020
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
May 1, 2020 – May 31, 2020
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2020 – April 30, 2020
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
February 1, 2020 – February 29, 2020
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2019 – December 31, 2019
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
September 1, 2019 – September 30, 2019
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2019 – August 31, 2019
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
July 1, 2019 – July 31, 2019
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2019 – June 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2019 – May 31, 2019
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
May 1, 2019 – May 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Chlordane
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Endrin
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Dalapon
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Endothall
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Simazine
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Picloram
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Atrazine
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—LASSO
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—2,3,7,8-TCDD
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—2,4-D
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2019 – August 13, 2019
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2019 – August 13, 2019
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
March 1, 2018 – April 3, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 11, 2017 – February 28, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 11, 2017 – February 28, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 11, 2017 – February 28, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 11, 2017 – February 28, 2018
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
July 1, 2017 – July 31, 2017
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2017 – September 30, 2017
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2017 – June 30, 2017
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
May 1, 2017 – May 31, 2017
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
January 1, 2017 – November 3, 2017
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 11, 2016
UnaddressedPublic Notification Violation for NPDWR Violation
—Public Notice
September 11, 2016
UnaddressedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
July 1, 2016 – July 31, 2016
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
July 1, 2016 – September 30, 2016
ResolvedMonitoring and Reporting (DBP)
—TTHM
July 1, 2016 – September 30, 2016
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
February 1, 2016 – February 29, 2016
ResolvedMonitoring, Regular
—2,4-D
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—LASSO
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Atrazine
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Picloram
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Simazine
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Endothall
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Diquat
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Dalapon
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Endrin
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Chlordane
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2016 – December 31, 2016
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2015 – December 31, 2015
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 1, 2015
UnaddressedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
August 1, 2015 – August 31, 2015
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2015 – September 30, 2015
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2014 – December 31, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2014 – June 30, 2014
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2014 – June 30, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2014 – April 30, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2013 – December 31, 2013
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2013 – June 30, 2013
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2013 – August 1, 2013
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2011 – March 31, 2011
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2010 – August 30, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2006 – September 11, 2006
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2005 – September 29, 2005
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2005 – May 24, 2006
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2005 – May 24, 2006
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2004 – January 31, 2005
ResolvedOCCT/SOWT Study/Recommendation
Health-basedLead and Copper Rule
July 1, 2004 – December 7, 2012
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2004 – October 29, 2004
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2003 – October 7, 2003
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1993 – June 30, 1993
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1993 – May 31, 1993
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 1988 – June 30, 1992
Archived
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| October 1, 2023 – December 4, 2023 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| June 1, 2022 – June 30, 2022 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| March 1, 2022 – March 31, 2022 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 2,3,7,8-TCDD | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Asbestos | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Chlordane | — | Resolved |
| December 1, 2021 – December 31, 2021 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| September 13, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| September 1, 2021 – September 30, 2021 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| September 1, 2021 – September 30, 2021 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 11, 2021 – August 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2021 – August 24, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| November 1, 2020 – November 30, 2020 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 1, 2020 – August 9, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2020 – June 30, 2020 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| May 1, 2020 – May 31, 2020 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2020 – April 30, 2020 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| February 1, 2020 – February 29, 2020 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| December 1, 2019 – December 31, 2019 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| September 1, 2019 – September 30, 2019 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| August 1, 2019 – August 31, 2019 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 1, 2019 – July 31, 2019 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| June 1, 2019 – June 30, 2019 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| May 1, 2019 – May 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2019 – May 31, 2019 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | 2,3,7,8-TCDD | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2019 – August 13, 2019 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| March 1, 2018 – April 3, 2019 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 11, 2017 – February 28, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 11, 2017 – February 28, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 11, 2017 – February 28, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 11, 2017 – February 28, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2017 – July 31, 2017 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| June 1, 2017 – June 30, 2017 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| May 1, 2017 – May 31, 2017 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| January 1, 2017 – November 3, 2017 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 11, 2016 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| September 11, 2016 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| July 1, 2016 – July 31, 2016 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 1, 2016 – September 30, 2016 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| July 1, 2016 – September 30, 2016 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| February 1, 2016 – February 29, 2016 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| October 1, 2015 – December 31, 2015 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 2015 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| August 1, 2015 – August 31, 2015 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| July 1, 2015 – September 30, 2015 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2014 – December 31, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| June 1, 2014 – June 30, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2014 – June 30, 2014 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2014 – April 30, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| December 1, 2013 – December 31, 2013 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2013 – August 1, 2013 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2010 – August 30, 2010 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2006 – September 11, 2006 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2005 – September 29, 2005 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2005 – May 24, 2006 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2005 – May 24, 2006 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2004 – January 31, 2005 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2004 – December 7, 2012 | OCCT/SOWT Study/Recommendation | Lead and Copper Rule | Health-based | Resolved |
| July 1, 2004 – October 29, 2004 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2003 – October 7, 2003 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 1993 – June 30, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 1993 – May 31, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1988 – June 30, 1992 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- March 4, 2024State Compliance achieved1 linked violation
- March 4, 2024State Public Notification received1 linked violation
- December 4, 2023State Violation/Reminder Notice1 linked violation
- December 4, 2023State Compliance achieved1 linked violation
- November 7, 2023State Public Notification requested1 linked violation
- November 7, 2023State Violation/Reminder Notice1 linked violation
- July 3, 2023State Violation/Reminder Notice1 linked violation
- July 3, 2023State Compliance achieved32 linked violations
- July 3, 2023State Public Notification received31 linked violations
- June 22, 2023State Compliance achieved1 linked violation
- January 20, 2023State Compliance achieved1 linked violation
- August 10, 2022State Formal Notice of Violation issued31 linked violations
- August 10, 2022State Public Notification requested30 linked violations
- May 2, 2022State Compliance achieved1 linked violation
- January 26, 2022State Violation/Reminder Notice1 linked violation
- January 19, 2022State Violation/Reminder Notice2 linked violations
- January 19, 2022State Public Notification requested2 linked violations
- January 19, 2022State Compliance achieved1 linked violation
- August 24, 2021State Violation/Reminder Notice1 linked violation
- August 24, 2021State Public Notification received2 linked violations
- August 24, 2021State Public Notification received1 linked violation
- August 24, 2021State Public Notification requested1 linked violation
- August 24, 2021State Compliance achieved2 linked violations
- August 9, 2021State Compliance achieved1 linked violation
- August 9, 2021State Public Notification received1 linked violation
- August 9, 2021State Compliance achieved1 linked violation
- August 3, 2021State Violation/Reminder Notice1 linked violation
- August 3, 2021State Compliance achieved1 linked violation
- August 3, 2021State Public Notification requested1 linked violation
- January 22, 2021State Compliance achieved1 linked violation
- January 22, 2021State Public Notification requested1 linked violation
- January 22, 2021State Violation/Reminder Notice1 linked violation
- December 14, 2020State Violation/Reminder Notice1 linked violation
- December 14, 2020State Public Notification requested1 linked violation
- November 12, 2020State Violation/Reminder Notice1 linked violation
- November 12, 2020State Public Notification requested1 linked violation
- August 4, 2020State Violation/Reminder Notice1 linked violation
- August 4, 2020State Violation/Reminder Notice1 linked violation
- July 21, 2020State Compliance achieved2 linked violations
- July 13, 2020State Public Notification requested1 linked violation
- May 28, 2020State Compliance achieved1 linked violation
- March 23, 2020State Violation/Reminder Notice1 linked violation
- March 23, 2020State Compliance achieved1 linked violation
- March 13, 2020State Compliance achieved1 linked violation
- February 21, 2020State Compliance achieved1 linked violation
- February 4, 2020State Violation/Reminder Notice1 linked violation
- January 29, 2020State Compliance achieved3 linked violations
- January 15, 2020State Compliance achieved3 linked violations
- December 27, 2019State Public Notification requested2 linked violations
- December 27, 2019State Violation/Reminder Notice1 linked violation
- November 26, 2019State Violation/Reminder Notice1 linked violation
- November 15, 2019State Violation/Reminder Notice1 linked violation
- September 27, 2019State Violation/Reminder Notice1 linked violation
- September 27, 2019State Violation/Reminder Notice1 linked violation
- September 6, 2019State Public Notification requested3 linked violations
- September 6, 2019State Violation/Reminder Notice1 linked violation
- September 6, 2019State Public Notification requested4 linked violations
- September 6, 2019State Violation/Reminder Notice1 linked violation
- August 13, 2019State Compliance achieved29 linked violations
- August 12, 2019State Violation/Reminder Notice30 linked violations
- August 12, 2019State Violation/Reminder Notice1 linked violation
- July 15, 2019State Compliance achieved1 linked violation
- July 15, 2019State Public Notification requested1 linked violation
- July 9, 2019State Formal Notice of Violation issued3 linked violations
- July 9, 2019State Formal Notice of Violation issued2 linked violations
- June 20, 2019State Violation/Reminder Notice2 linked violations
- June 20, 2019State Violation/Reminder Notice3 linked violations
- April 3, 2019State Compliance achieved1 linked violation
- March 21, 2019State Public Notification received1 linked violation
- March 21, 2019State Compliance achieved1 linked violation
- January 14, 2019State Violation/Reminder Notice1 linked violation
- May 23, 2018State Public Notification received5 linked violations
- May 7, 2018State Formal Notice of Violation issued1 linked violation
- May 7, 2018State Formal Notice of Violation issued1 linked violation
- February 28, 2018State Public Notification received1 linked violation
- February 28, 2018State Public Notification received2 linked violations
- February 28, 2018State Compliance achieved2 linked violations
- February 28, 2018State Compliance achieved2 linked violations
- February 28, 2018State Compliance achieved2 linked violations
- February 28, 2018State Public Notification received2 linked violations
- February 6, 2018State Violation/Reminder Notice2 linked violations
- February 6, 2018State Compliance achieved1 linked violation
- February 6, 2018State Public Notification requested2 linked violations
- February 2, 2018State Compliance achieved1 linked violation
- February 2, 2018State Violation/Reminder Notice2 linked violations
- February 2, 2018State Public Notification requested2 linked violations
- February 2, 2018State Compliance achieved2 linked violations
- November 3, 2017State Compliance achieved4 linked violations
- November 3, 2017State Violation/Reminder Notice4 linked violations
- November 3, 2017State Public Notification requested6 linked violations
- July 21, 2017State Violation/Reminder Notice3 linked violations
- February 14, 2017State Compliance achieved30 linked violations
- February 14, 2017State Violation/Reminder Notice1 linked violation
- February 14, 2017State Violation/Reminder Notice1 linked violation
- December 30, 2016State Violation/Reminder Notice32 linked violations
- December 30, 2016State Violation/Reminder Notice3 linked violations
- December 30, 2016State Violation/Reminder Notice1 linked violation
- June 6, 2016State Compliance achieved1 linked violation
- February 5, 2016State Compliance achieved2 linked violations
- November 25, 2015State Public Notification requested1 linked violation
- November 25, 2015State Violation/Reminder Notice1 linked violation
- October 1, 2015State Public Notification requested3 linked violations
- October 1, 2015State Violation/Reminder Notice3 linked violations
- May 26, 2015State Compliance achieved1 linked violation
- February 24, 2015State Compliance achieved1 linked violation
- February 2, 2015State Violation/Reminder Notice1 linked violation
- November 20, 2014State Compliance achieved1 linked violation
- October 9, 2014State Public Notification requested1 linked violation
- October 9, 2014State Site Visit for enforcement purposes1 linked violation
- October 9, 2014State Public Notification requested1 linked violation
- October 9, 2014State Compliance achieved1 linked violation
- October 9, 2014State Site Visit for enforcement purposes1 linked violation
- September 16, 2014State Compliance achieved1 linked violation
- June 24, 2014State Violation/Reminder Notice2 linked violations
- June 24, 2014State Violation/Reminder Notice1 linked violation
- June 24, 2014State Compliance achieved1 linked violation
- April 22, 2014State Compliance achieved1 linked violation
- April 22, 2014State Compliance achieved1 linked violation
- January 30, 2014State Violation/Reminder Notice1 linked violation
- August 1, 2013State Compliance achieved1 linked violation
- July 5, 2013State Formal Notice of Violation issued1 linked violation
- July 5, 2013State Public Notification requested1 linked violation
- July 5, 2013State Formal Notice of Violation issued1 linked violation
- July 5, 2013State Public Notification requested1 linked violation
- May 8, 2013State Public Notification requested1 linked violation
- May 8, 2013State Formal Notice of Violation issued1 linked violation
- February 1, 2013State Formal Notice of Violation issued1 linked violation
- February 1, 2013State Public Notification requested1 linked violation
- December 7, 2012State Compliance achieved1 linked violation
- December 7, 2012State Violation/Reminder Notice1 linked violation
- May 30, 2012State Compliance achieved1 linked violation
- May 4, 2011State Compliance achieved1 linked violation
- May 4, 2011State Violation/Reminder Notice1 linked violation
- August 30, 2010State Compliance achieved1 linked violation
- August 30, 2010State Violation/Reminder Notice1 linked violation
- January 18, 2007State Public Notification received1 linked violation
- September 11, 2006State Compliance achieved1 linked violation
- August 21, 2006State Violation/Reminder Notice1 linked violation
- August 21, 2006State Public Notification requested1 linked violation
- June 1, 2006State Public Notification received2 linked violations
- May 24, 2006State Public Notification requested2 linked violations
- May 24, 2006State Compliance achieved2 linked violations
- May 24, 2006State Violation/Reminder Notice2 linked violations
- September 29, 2005State Consent Decree/Judgement1 linked violation
- September 29, 2005State Violation/Reminder Notice1 linked violation
- September 29, 2005State Compliance achieved1 linked violation
- January 31, 2005State Compliance achieved1 linked violation
- January 31, 2005State Formal Notice of Violation issued1 linked violation
- October 29, 2004State Consent Decree/Judgement1 linked violation
- October 29, 2004State Compliance achieved1 linked violation
- October 25, 2004State Violation/Reminder Notice1 linked violation
- October 7, 2003State Compliance achieved1 linked violation
- October 7, 2003State Violation/Reminder Notice1 linked violation
- October 7, 2003State Consent Decree/Judgement1 linked violation
- February 5, 1988State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
Contact
POCONO PLATEAU PARK WELL 1
215-536-4622
TRUMBAUERSVILLE, PA 18970