SHAVERTOWN, PA · Luzerne County
VALLEY VIEW MHP Water System
Current status
No open violations on record as of July 4, 2026.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Pennsylvania’s official records. Always confirm current status with Pennsylvania before making decisions based on this information.
System facts
- System ID (PWSID)
- PA2400051
- System type
- Community Water System
- Population served
- 480
- Service connections
- 225
- Ownership
- privately owned
- Water source
- groundwater (wells)
Violation history
Consumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2025 – December 10, 2025
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2023 – August 31, 2023
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
February 1, 2023 – February 28, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Arsenic
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Barium
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Cadmium
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Chromium
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—CYANIDE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Fluoride
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Mercury
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Nickel
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Selenium
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2020 – December 31, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2018 – September 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2017 – November 30, 2017
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2016 – September 30, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2013 – August 31, 2013
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
August 1, 2013 – August 31, 2013
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2011 – December 31, 2011
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2011 – September 30, 2011
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2009 – December 31, 2009
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2007 – June 27, 2007
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2005 – September 9, 2005
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2005 – June 30, 2005
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2004 – December 31, 2004
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2004 – September 30, 2004
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2004 – June 30, 2004
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2004 – March 31, 2004
ResolvedMonitoring, Regular
—Styrene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Benzene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Toluene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Nitrate
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Benzene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—Styrene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 1996 – March 31, 1996
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 1996 – March 31, 1996
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 1994 – June 8, 1995
ResolvedMonitoring, Regular
—Nitrate
January 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 1988 – June 30, 1992
Archived
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| October 1, 2025 – December 10, 2025 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| August 1, 2023 – August 31, 2023 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| February 1, 2023 – February 28, 2023 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| March 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | CYANIDE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Nickel | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Thallium, Total | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| November 1, 2017 – November 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2016 – September 30, 2016 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 2013 – August 31, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2013 – August 31, 2013 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2007 – June 27, 2007 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2005 – September 9, 2005 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2005 – June 30, 2005 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2004 – December 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2004 – September 30, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2004 – March 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 1996 – March 31, 1996 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 1994 – June 8, 1995 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 1993 – December 31, 1993 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 1988 – June 30, 1992 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- December 10, 2025State Compliance achieved1 linked violation
- December 10, 2025State Violation/Reminder Notice1 linked violation
- January 9, 2024State Compliance achieved1 linked violation
- January 9, 2024State Violation/Reminder Notice1 linked violation
- June 23, 2023State Compliance achieved12 linked violations
- May 16, 2023State Compliance achieved12 linked violations
- May 16, 2023State Public Notification received12 linked violations
- March 31, 2023State Compliance achieved1 linked violation
- March 31, 2023State Violation/Reminder Notice1 linked violation
- February 9, 2023State Public Notification requested12 linked violations
- February 9, 2023State Formal Notice of Violation issued12 linked violations
- June 17, 2020State Public Notification received1 linked violation
- May 12, 2020State Compliance achieved1 linked violation
- May 1, 2020State Public Notification requested1 linked violation
- May 1, 2020State Violation/Reminder Notice1 linked violation
- February 25, 2019State Public Notification received1 linked violation
- November 6, 2018State Compliance achieved1 linked violation
- November 6, 2018State Violation/Reminder Notice1 linked violation
- February 28, 2018State Compliance achieved1 linked violation
- January 19, 2018State Public Notification requested1 linked violation
- January 19, 2018State Violation/Reminder Notice1 linked violation
- December 30, 2016State Compliance achieved1 linked violation
- October 4, 2016State Violation/Reminder Notice1 linked violation
- December 23, 2013State Compliance achieved1 linked violation
- November 4, 2013State Violation/Reminder Notice1 linked violation
- October 11, 2013State Public Notification received1 linked violation
- October 11, 2013State Public Notification requested1 linked violation
- October 11, 2013State Compliance achieved1 linked violation
- October 4, 2013State Violation/Reminder Notice1 linked violation
- February 24, 2012State Compliance achieved1 linked violation
- February 24, 2012State Compliance achieved1 linked violation
- December 22, 2011State Formal Notice of Violation issued1 linked violation
- November 21, 2011State Formal Notice of Violation issued1 linked violation
- February 11, 2010State Compliance achieved1 linked violation
- June 27, 2007State Compliance achieved1 linked violation
- June 27, 2007State Violation/Reminder Notice1 linked violation
- September 9, 2005State Consent Decree/Judgement1 linked violation
- September 9, 2005State Compliance achieved1 linked violation
- August 24, 2005State Consent Decree/Judgement1 linked violation
- August 24, 2005State Compliance achieved1 linked violation
- August 10, 2005State Violation/Reminder Notice1 linked violation
- February 14, 2005State Consent Decree/Judgement1 linked violation
- February 14, 2005State Compliance achieved1 linked violation
- November 23, 2004State Consent Decree/Judgement1 linked violation
- November 23, 2004State Compliance achieved1 linked violation
- October 7, 2004State Compliance achieved1 linked violation
- October 7, 2004State Consent Decree/Judgement1 linked violation
- July 29, 2004State Violation/Reminder Notice1 linked violation
- July 29, 2004State Violation/Reminder Notice1 linked violation
- June 22, 2004State Consent Decree/Judgement1 linked violation
- June 22, 2004State Compliance achieved1 linked violation
- May 17, 1982State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 19, 1981State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
Contact
VALLEY VIEW MHP
570-407-1367
SHAVERTOWN, PA 18708