KENNETT SQUARE, PA · Chester County
KENNETT SQUARE MUN WATER WORKS Water System
Current status
1 item on record is open and awaiting resolution as of July 4, 2026. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings. Full details are in the violation history below.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Pennsylvania’s official records. Always confirm current status with Pennsylvania before making decisions based on this information.
System facts
- System ID (PWSID)
- PA1150108
- System type
- Community Water System
- Population served
- 6,328
- Service connections
- 1,885
- Ownership
- local government
- Water source
- surface water (rivers, lakes, or reservoirs)
Violation history
Monitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
January 1, 2026 – January 31, 2026
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2025 – December 31, 2025
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
March 1, 2025 – March 31, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2025 – January 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2025 – January 31, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – October 18, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – April 18, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – April 18, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – April 18, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2024 – March 6, 2024
ResolvedMonitoring, Regular
—Nitrate
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Nitrite
October 1, 2023 – December 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Nitrite
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2023 – December 31, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 11, 2023 – August 21, 2025
ResolvedMonitoring and Reporting (DBP)
—TTHM
April 1, 2023 – June 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2023 – March 31, 2023
ResolvedLead Consumer Notice
—Lead and Copper Rule
January 1, 2023
UnaddressedMonitoring, Regular
—Nitrite
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Nitrate
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Nitrite
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Nitrate
January 1, 2023 – March 31, 2023
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2023 – March 31, 2023
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Nitrite
October 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Nitrite
October 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Nitrate
October 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Nitrate
October 1, 2022 – December 31, 2022
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2022 – September 14, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 11, 2022 – January 25, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 11, 2022 – June 14, 2022
ResolvedMonitoring and Reporting (DBP)
—TTHM
April 1, 2022 – June 30, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2022 – March 18, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2022 – March 18, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2022 – March 18, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 11, 2022 – March 18, 2022
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Benzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Toluene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Styrene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Benzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Toluene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Styrene
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2021 – December 31, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – January 10, 2023
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
May 1, 2021 – May 31, 2021
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
March 1, 2021 – March 31, 2021
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
February 1, 2021 – February 28, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
December 1, 2020 – December 31, 2020
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2020 – December 31, 2020
ResolvedMonitoring, Regular
—Radium-228
October 1, 2020 – December 31, 2020
ResolvedMonitoring, Regular
—Radium-226
October 1, 2020 – December 31, 2020
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 13, 2020 – October 26, 2020
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
August 1, 2020 – August 31, 2020
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 13, 2020 – October 26, 2020
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
June 1, 2020 – June 30, 2020
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2018 – August 29, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 11, 2017 – August 1, 2017
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
May 1, 2017 – May 31, 2017
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
August 1, 2016 – August 31, 2016
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2016 – September 30, 2016
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
May 1, 2016 – May 31, 2016
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2016 – April 30, 2016
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2015 – December 31, 2015
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Radium-228
October 1, 2014 – December 31, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2014 – August 31, 2014
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2014 – November 18, 2014
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2014 – November 18, 2014
ResolvedMonitoring, Regular
—LASSO
January 1, 2014 – November 18, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
January 1, 2014 – January 31, 2014
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
April 1, 2013 – April 30, 2013
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
March 1, 2013 – March 31, 2013
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
January 1, 2013 – January 31, 2013
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
December 1, 2011 – December 31, 2011
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2011 – December 31, 2011
ResolvedMonitoring and Reporting (DBP)
—TTHM
July 1, 2011 – September 30, 2011
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Nitrate
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—2,3,7,8-TCDD
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Nitrite
April 1, 2011 – June 30, 2011
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2011 – June 27, 2011
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
November 1, 2010 – November 30, 2010
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2010 – December 31, 2010
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2010 – September 28, 2010
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
May 1, 2010 – May 31, 2010
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2010 – June 30, 2010
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2009 – December 31, 2009
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2009 – September 4, 2009
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
July 1, 2009 – July 31, 2009
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
April 1, 2007 – June 30, 2007
ResolvedMonitoring, Regular
—Nitrate
April 1, 2006 – June 30, 2006
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2005 – February 9, 2006
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2005 – March 31, 2005
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2005 – March 31, 2005
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2004 – March 4, 2005
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2004 – December 15, 2004
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
July 1, 2004 – July 31, 2004
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2004 – August 31, 2004
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
June 1, 2004 – June 30, 2004
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2004 – June 30, 2004
ResolvedMonitoring, Regular
—Nitrate
April 1, 2004 – June 30, 2004
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2004 – January 31, 2004
ResolvedMonitoring, Regular
—Fluoride
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Styrene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Toluene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Benzene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2002 – December 31, 2002
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
November 1, 2001 – November 30, 2001
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
September 1, 2001 – September 30, 2001
ArchivedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
July 1, 2001 – July 31, 2001
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
June 1, 2001 – June 30, 2001
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
May 1, 2001 – May 31, 2001
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
March 1, 2001 – March 31, 2001
ResolvedMonitoring, Regular
—Atrazine
January 1, 2001 – December 31, 2001
ResolvedMonitoring, Regular
—Nitrate
January 1, 2001 – March 31, 2001
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
December 1, 2000 – December 31, 2000
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2000 – December 31, 2000
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
November 1, 2000 – November 30, 2000
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2000 – November 30, 2000
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
July 1, 2000 – July 31, 2000
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
June 1, 2000 – June 30, 2000
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
May 1, 2000 – May 31, 2000
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
April 1, 2000 – April 30, 2000
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Surface Water Treatment Rule
March 1, 2000 – March 31, 2000
ResolvedMonitoring, Regular
—Nitrate
January 1, 2000 – March 31, 2000
ResolvedMonitoring, Regular
—Fluoride
January 1, 2000 – December 31, 2000
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 1999 – November 8, 2001
ResolvedMonitoring, Regular
—Nitrate
July 1, 1998 – September 30, 1998
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 1996 – June 30, 2000
ResolvedMonitoring, Regular
—Nitrate
January 1, 1993 – December 31, 1993
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 1992 – August 31, 1992
ArchivedMonitoring, Regular
—Chromium
June 25, 1982 – June 24, 1983
ArchivedMonitoring, Regular
—Barium
June 25, 1982 – June 24, 1983
ArchivedMonitoring, Regular
—Selenium
June 25, 1982 – June 24, 1983
ArchivedMonitoring, Regular
—Mercury
June 25, 1982 – June 24, 1983
ArchivedMonitoring, Regular
—Arsenic
June 25, 1982 – June 24, 1983
ArchivedMonitoring, Regular
—Mercury
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—Nitrate
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—Selenium
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—Endrin
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—BHC-GAMMA
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—Methoxychlor
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—Toxaphene
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—2,4,5-TP
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—2,4-D
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—Arsenic
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—Barium
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—Cadmium
June 24, 1979 – June 23, 1980
ArchivedMonitoring, Regular
—Chromium
June 24, 1979 – June 23, 1980
Archived
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2026 – January 31, 2026 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| December 1, 2025 – December 31, 2025 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| January 1, 2025 – January 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2025 – January 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2024 – October 18, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – April 18, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – April 18, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – April 18, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2024 – March 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Nitrite | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Nitrite | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 11, 2023 – August 21, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2023 | Lead Consumer Notice | Lead and Copper Rule | — | Unaddressed |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| December 1, 2022 – December 31, 2022 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring, Regular | Nitrite | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring, Regular | Nitrite | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 2022 – September 14, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 11, 2022 – January 25, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 11, 2022 – June 14, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| January 11, 2022 – March 18, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2022 – March 18, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2022 – March 18, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 11, 2022 – March 18, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Styrene | — | Resolved |
| October 1, 2021 – December 31, 2021 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2021 – January 10, 2023 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| May 1, 2021 – May 31, 2021 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| March 1, 2021 – March 31, 2021 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| February 1, 2021 – February 28, 2021 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| December 1, 2020 – December 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2020 – December 31, 2020 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2020 – December 31, 2020 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2020 – December 31, 2020 | Monitoring, Regular | Radium-226 | — | Resolved |
| August 13, 2020 – October 26, 2020 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2020 – August 31, 2020 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| June 13, 2020 – October 26, 2020 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| June 1, 2020 – June 30, 2020 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| July 1, 2018 – August 29, 2018 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 11, 2017 – August 1, 2017 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 1, 2017 – May 31, 2017 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| August 1, 2016 – August 31, 2016 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2016 – September 30, 2016 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2016 – May 31, 2016 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2016 – April 30, 2016 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| December 1, 2015 – December 31, 2015 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| December 1, 2014 – December 31, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2014 – December 31, 2014 | Monitoring, Regular | Radium-228 | — | Resolved |
| August 1, 2014 – August 31, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| January 1, 2014 – November 18, 2014 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2014 – November 18, 2014 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2014 – November 18, 2014 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2014 – January 31, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2013 – April 30, 2013 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 2013 – March 31, 2013 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| January 1, 2013 – January 31, 2013 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| December 1, 2011 – December 31, 2011 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Nitrate | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | 2,3,7,8-TCDD | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Nitrite | — | Resolved |
| April 1, 2011 – June 27, 2011 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| November 1, 2010 – November 30, 2010 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2010 – September 28, 2010 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2010 – May 31, 2010 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2009 – September 4, 2009 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2009 – July 31, 2009 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2007 – June 30, 2007 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| April 1, 2006 – June 30, 2006 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 2005 – February 9, 2006 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2005 – March 31, 2005 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2005 – March 31, 2005 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| October 1, 2004 – March 4, 2005 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2004 – December 15, 2004 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2004 – July 31, 2004 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2004 – August 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| June 1, 2004 – June 30, 2004 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2004 – January 31, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| November 1, 2001 – November 30, 2001 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| September 1, 2001 – September 30, 2001 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Archived |
| July 1, 2001 – July 31, 2001 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| June 1, 2001 – June 30, 2001 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2001 – May 31, 2001 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2001 – March 31, 2001 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2001 – December 31, 2001 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2001 – March 31, 2001 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 2000 – December 31, 2000 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| December 1, 2000 – December 31, 2000 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2000 – November 30, 2000 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2000 – November 30, 2000 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2000 – July 31, 2000 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| June 1, 2000 – June 30, 2000 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2000 – May 31, 2000 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2000 – April 30, 2000 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2000 – March 31, 2000 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2000 – March 31, 2000 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2000 – December 31, 2000 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 1999 – November 8, 2001 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 1998 – September 30, 1998 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 1996 – June 30, 2000 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 1993 – December 31, 1993 | Monitoring, Regular | Nitrate | — | Resolved |
| August 1, 1992 – August 31, 1992 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| June 25, 1982 – June 24, 1983 | Monitoring, Regular | Chromium | — | Archived |
| June 25, 1982 – June 24, 1983 | Monitoring, Regular | Barium | — | Archived |
| June 25, 1982 – June 24, 1983 | Monitoring, Regular | Selenium | — | Archived |
| June 25, 1982 – June 24, 1983 | Monitoring, Regular | Mercury | — | Archived |
| June 25, 1982 – June 24, 1983 | Monitoring, Regular | Arsenic | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Mercury | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Nitrate | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Selenium | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Endrin | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Methoxychlor | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Toxaphene | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | 2,4-D | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Arsenic | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Barium | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Cadmium | — | Archived |
| June 24, 1979 – June 23, 1980 | Monitoring, Regular | Chromium | — | Archived |
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- March 13, 2026State Compliance achieved1 linked violation
- February 25, 2026State Compliance achieved1 linked violation
- February 25, 2026State Violation/Reminder Notice1 linked violation
- February 11, 2026State Formal Notice of Violation issued1 linked violation
- January 13, 2026State Compliance achieved1 linked violation
- December 9, 2025State Violation/Reminder Notice1 linked violation
- November 12, 2025State Public Notification requested2 linked violations
- November 12, 2025State Formal Notice of Violation issued2 linked violations
- October 8, 2025State Public Notification requested1 linked violation
- October 8, 2025State Public Notification received2 linked violations
- October 8, 2025State Compliance achieved2 linked violations
- August 21, 2025State Compliance achieved3 linked violations
- August 21, 2025State Compliance achieved9 linked violations
- August 21, 2025State Compliance achieved8 linked violations
- July 8, 2025State Formal Notice of Violation issued1 linked violation
- June 9, 2025State Formal Notice of Violation issued1 linked violation
- June 9, 2025State Public Notification requested1 linked violation
- May 9, 2025State Violation/Reminder Notice1 linked violation
- March 14, 2025State Formal Notice of Violation issued2 linked violations
- October 18, 2024State Compliance achieved1 linked violation
- October 18, 2024State Violation/Reminder Notice1 linked violation
- June 12, 2024State Public Notification received22 linked violations
- May 1, 2024State Public Notification received7 linked violations
- April 18, 2024State Compliance achieved4 linked violations
- April 18, 2024State Public Notification requested4 linked violations
- April 18, 2024State Violation/Reminder Notice4 linked violations
- April 18, 2024State Public Notification received12 linked violations
- March 6, 2024State Compliance achieved37 linked violations
- March 6, 2024State Public Notification received37 linked violations
- March 6, 2024State Violation/Reminder Notice37 linked violations
- February 9, 2024State Violation/Reminder Notice8 linked violations
- February 9, 2024State Public Notification requested8 linked violations
- October 11, 2023State Public Notification received1 linked violation
- August 28, 2023State Violation/Reminder Notice1 linked violation
- August 28, 2023State Public Notification received1 linked violation
- August 9, 2023State Public Notification requested1 linked violation
- August 9, 2023State Formal Notice of Violation issued2 linked violations
- May 4, 2023State Violation/Reminder Notice6 linked violations
- May 4, 2023State Public Notification requested6 linked violations
- January 26, 2023State Formal Notice of Violation issued1 linked violation
- January 25, 2023State Compliance achieved46 linked violations
- January 25, 2023State Compliance achieved2 linked violations
- January 25, 2023State Public Notification requested45 linked violations
- January 25, 2023State Violation/Reminder Notice45 linked violations
- January 10, 2023State Compliance achieved8 linked violations
- January 10, 2023State Public Notification requested8 linked violations
- December 2, 2022State Violation/Reminder Notice1 linked violation
- September 14, 2022State Violation/Reminder Notice2 linked violations
- September 14, 2022State Compliance achieved1 linked violation
- September 14, 2022State Compliance achieved1 linked violation
- September 14, 2022State Violation/Reminder Notice2 linked violations
- August 10, 2022State Formal Notice of Violation issued1 linked violation
- August 10, 2022State Public Notification requested1 linked violation
- August 10, 2022State Public Notification requested1 linked violation
- August 10, 2022State Formal Notice of Violation issued1 linked violation
- July 13, 2022State Compliance achieved1 linked violation
- July 13, 2022State Violation/Reminder Notice1 linked violation
- June 14, 2022State Compliance achieved1 linked violation
- June 14, 2022State Violation/Reminder Notice1 linked violation
- March 18, 2022State Compliance achieved4 linked violations
- March 18, 2022State Violation/Reminder Notice4 linked violations
- February 14, 2022State Compliance achieved1 linked violation
- February 14, 2022State Violation/Reminder Notice1 linked violation
- December 17, 2021State Compliance achieved1 linked violation
- December 17, 2021State Violation/Reminder Notice1 linked violation
- September 14, 2021State Violation/Reminder Notice1 linked violation
- September 14, 2021State Violation/Reminder Notice1 linked violation
- August 16, 2021State Compliance achieved1 linked violation
- August 16, 2021State Violation/Reminder Notice1 linked violation
- July 15, 2021State Violation/Reminder Notice1 linked violation
- July 15, 2021State Violation/Reminder Notice1 linked violation
- June 11, 2021State Violation/Reminder Notice1 linked violation
- June 11, 2021State Violation/Reminder Notice1 linked violation
- May 12, 2021State Violation/Reminder Notice1 linked violation
- May 12, 2021State Violation/Reminder Notice1 linked violation
- February 3, 2021State Violation/Reminder Notice4 linked violations
- October 26, 2020State Public Notification requested2 linked violations
- October 26, 2020State Compliance achieved4 linked violations
- October 26, 2020State Public Notification received2 linked violations
- September 28, 2020State Violation/Reminder Notice2 linked violations
- September 28, 2020State Violation/Reminder Notice2 linked violations
- August 24, 2020State Violation/Reminder Notice2 linked violations
- August 24, 2020State Violation/Reminder Notice2 linked violations
- August 29, 2018State Compliance achieved1 linked violation
- August 29, 2018State Violation/Reminder Notice1 linked violation
- August 1, 2017State Compliance achieved1 linked violation
- August 1, 2017State Violation/Reminder Notice1 linked violation
- August 1, 2017State Compliance achieved1 linked violation
- July 13, 2017State Compliance achieved1 linked violation
- June 29, 2017State Violation/Reminder Notice1 linked violation
- April 20, 2017State Compliance achieved1 linked violation
- January 30, 2017State Compliance achieved2 linked violations
- October 27, 2016State Violation/Reminder Notice2 linked violations
- June 30, 2016State Compliance achieved1 linked violation
- June 28, 2016State Violation/Reminder Notice3 linked violations
- June 28, 2016State Violation/Reminder Notice2 linked violations
- July 14, 2015State Compliance achieved1 linked violation
- July 14, 2015State Public Notification requested1 linked violation
- July 14, 2015State Public Notification received1 linked violation
- February 12, 2015State Violation/Reminder Notice2 linked violations
- February 12, 2015State Compliance achieved1 linked violation
- November 18, 2014State Compliance achieved3 linked violations
- November 14, 2014State Violation/Reminder Notice3 linked violations
- October 2, 2014State Compliance achieved1 linked violation
- October 2, 2014State Violation/Reminder Notice1 linked violation
- March 26, 2014State Violation/Reminder Notice1 linked violation
- March 26, 2014State Compliance achieved1 linked violation
- June 13, 2013State Compliance achieved1 linked violation
- May 29, 2013State Compliance achieved1 linked violation
- March 18, 2013State Compliance achieved1 linked violation
- February 1, 2012State Compliance achieved2 linked violations
- November 2, 2011State Compliance achieved2 linked violations
- August 12, 2011State Compliance achieved1 linked violation
- August 11, 2011State Compliance achieved2 linked violations
- August 11, 2011State Violation/Reminder Notice2 linked violations
- June 27, 2011State Compliance achieved2 linked violations
- June 27, 2011State Violation/Reminder Notice2 linked violations
- March 3, 2011State Compliance achieved1 linked violation
- February 28, 2011State Violation/Reminder Notice1 linked violation
- February 2, 2011State Compliance achieved2 linked violations
- September 28, 2010State Compliance achieved1 linked violation
- September 20, 2010State Compliance achieved1 linked violation
- August 5, 2010State Compliance achieved1 linked violation
- July 6, 2010State Compliance achieved1 linked violation
- May 6, 2010State Compliance achieved1 linked violation
- February 3, 2010State Compliance achieved1 linked violation
- December 2, 2009State Compliance achieved1 linked violation
- September 4, 2009State Compliance achieved2 linked violations
- August 7, 2007State Compliance achieved1 linked violation
- August 16, 2006State Compliance achieved1 linked violation
- February 9, 2006State Compliance achieved1 linked violation
- February 9, 2006State Consent Decree/Judgement1 linked violation
- December 13, 2005State Formal Notice of Violation issued1 linked violation
- November 8, 2005State Formal Notice of Violation issued1 linked violation
- June 17, 2005State Compliance achieved2 linked violations
- May 20, 2005State Formal Notice of Violation issued2 linked violations
- March 4, 2005State Consent Decree/Judgement1 linked violation
- March 4, 2005State Compliance achieved1 linked violation
- December 15, 2004State Consent Decree/Judgement1 linked violation
- December 15, 2004State Compliance achieved1 linked violation
- November 9, 2004State Formal Notice of Violation issued1 linked violation
- September 10, 2004State Compliance achieved1 linked violation
- September 9, 2004State Violation/Reminder Notice1 linked violation
- August 31, 2004State Compliance achieved4 linked violations
- August 31, 2004State Formal Notice of Violation issued4 linked violations
- April 9, 2004State Formal Notice of Violation issued1 linked violation
- April 9, 2004State Compliance achieved1 linked violation
- April 1, 2004State Compliance achieved1 linked violation
- March 3, 2004State Compliance achieved1 linked violation
- March 3, 2004State Violation/Reminder Notice1 linked violation
- January 12, 2004State Formal Notice of Violation issued1 linked violation
- April 4, 2003State Formal Notice of Violation issued20 linked violations
- April 4, 2003State Compliance achieved20 linked violations
- October 11, 2002State Compliance achieved1 linked violation
- August 24, 2001State Compliance achieved25 linked violations
- October 5, 1989State Formal Notice of Violation issued1 linked violation
- November 7, 1988State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- September 30, 1982Federal issued Formal Notice of Violationgeneral compliance action — not tied to a specific violation on record
- March 19, 1982State Unresolvedgeneral compliance action — not tied to a specific violation on record
- October 19, 1981State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
Contact
KENNETT SQUARE MUN WATER WORKS
610-444-6020
KENNETT SQUARE, PA 19348