POINT PLEASANT, PA · Bucks County
FAMILY AND FRIENDS Water System
Current status
No open violations on record as of July 4, 2026.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Pennsylvania’s official records. Always confirm current status with Pennsylvania before making decisions based on this information.
System facts
- System ID (PWSID)
- PA1090055
- System type
- Community Water System
- Population served
- 40
- Service connections
- 1
- Ownership
- privately owned
- Water source
- groundwater (wells)
Violation history
Public Notification Violation for NPDWR Violation
—Public Notice
January 11, 2026 – February 25, 2026
ResolvedMonitoring and Reporting (DBP)
—Chlorine
November 1, 2025 – November 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2025 – July 31, 2025
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2024 – December 31, 2024
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2023 – February 7, 2024
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2023 – August 29, 2023
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2023 – December 31, 2023
ResolvedLead Consumer Notice
—Lead and Copper Rule
January 1, 2023 – May 11, 2023
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2022 – September 7, 2022
ResolvedMonitoring and Reporting (DBP)
—TTHM
July 1, 2022 – September 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Nitrate
January 1, 2021 – December 31, 2021
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2020 – August 31, 2020
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
July 1, 2019 – July 31, 2019
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2018 – April 30, 2018
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
October 1, 2017 – December 31, 2017
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
April 1, 2017 – November 27, 2017
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
November 1, 2016 – November 30, 2016
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
July 1, 2016 – September 30, 2016
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
June 1, 2016 – September 28, 2016
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Endrin
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Dalapon
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Diquat
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Endothall
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Simazine
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Picloram
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Atrazine
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—LASSO
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—2,3,7,8-TCDD
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—2,4-D
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Chlordane
January 1, 2016 – December 31, 2016
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
September 1, 2015 – September 30, 2015
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2015 – June 30, 2015
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2015 – June 30, 2015
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2015 – April 30, 2015
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
February 1, 2015 – February 28, 2015
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
October 1, 2014 – December 31, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
September 1, 2014 – September 30, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2014 – August 31, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
May 1, 2014 – May 31, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2014 – April 30, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
March 1, 2014 – March 31, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
February 1, 2014 – February 28, 2014
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
January 1, 2014 – January 31, 2014
ResolvedMonitoring, Regular
—Barium
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—CYANIDE
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Fluoride
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Mercury
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Cadmium
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Selenium
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Nickel
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Chromium
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Arsenic
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-228
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-226
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2011 – July 31, 2011
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Methoxychlor
April 1, 2011 – June 30, 2011
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-226
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Benzo(a)pyrene
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—LASSO
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Atrazine
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Simazine
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
April 1, 2011 – June 30, 2011
Resolved
Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 11, 2026 – February 25, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2025 – November 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| October 1, 2023 – February 7, 2024 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2023 – August 29, 2023 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2023 – December 31, 2023 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2023 – May 11, 2023 | Lead Consumer Notice | Lead and Copper Rule | — | Resolved |
| July 1, 2022 – September 7, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2021 – December 31, 2021 | Monitoring, Regular | Nitrate | — | Resolved |
| August 1, 2020 – August 31, 2020 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 1, 2019 – July 31, 2019 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2018 – April 30, 2018 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2017 – December 31, 2017 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| April 1, 2017 – November 27, 2017 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2016 – November 30, 2016 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 1, 2016 – September 30, 2016 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| June 1, 2016 – September 28, 2016 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | 2,3,7,8-TCDD | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Chlordane | — | Resolved |
| September 1, 2015 – September 30, 2015 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| June 1, 2015 – June 30, 2015 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2015 – June 30, 2015 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2015 – April 30, 2015 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| February 1, 2015 – February 28, 2015 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2014 – December 31, 2014 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| September 1, 2014 – September 30, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| August 1, 2014 – August 31, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| May 1, 2014 – May 31, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| April 1, 2014 – April 30, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| March 1, 2014 – March 31, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| February 1, 2014 – February 28, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| January 1, 2014 – January 31, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | CYANIDE | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Nickel | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring, Regular | Arsenic | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2011 – July 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Methoxychlor | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | LASSO | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Atrazine | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Simazine | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
Resolved addressed and confirmed by the state
Enforcement actions
- March 2, 2026State Public Notification received2 linked violations
- March 2, 2026State Compliance achieved2 linked violations
- February 25, 2026State Violation/Reminder Notice1 linked violation
- February 25, 2026State Compliance achieved2 linked violations
- February 25, 2026State Public Notification received1 linked violation
- January 7, 2026State Formal Notice of Violation issued1 linked violation
- January 7, 2026State Public Notification requested1 linked violation
- September 8, 2025State Formal Notice of Violation issued1 linked violation
- September 8, 2025State Public Notification requested1 linked violation
- March 10, 2025State Public Notification requested1 linked violation
- March 10, 2025State Violation/Reminder Notice1 linked violation
- September 23, 2024State Compliance achieved1 linked violation
- February 7, 2024State Violation/Reminder Notice1 linked violation
- February 7, 2024State Compliance achieved1 linked violation
- November 28, 2023State Violation/Reminder Notice1 linked violation
- August 29, 2023State Compliance achieved1 linked violation
- August 28, 2023State Violation/Reminder Notice1 linked violation
- May 11, 2023State Compliance achieved1 linked violation
- May 11, 2023State Compliance achieved1 linked violation
- January 26, 2023State Formal Notice of Violation issued1 linked violation
- November 15, 2022State Compliance achieved1 linked violation
- November 14, 2022State Formal Notice of Violation issued1 linked violation
- September 7, 2022State Compliance achieved1 linked violation
- September 7, 2022State Violation/Reminder Notice1 linked violation
- March 15, 2022State Compliance achieved2 linked violations
- March 15, 2022State Public Notification received2 linked violations
- February 11, 2022State Public Notification requested2 linked violations
- January 31, 2022State Violation/Reminder Notice2 linked violations
- December 7, 2021State Compliance achieved1 linked violation
- December 2, 2021State Violation/Reminder Notice1 linked violation
- November 24, 2020State Compliance achieved1 linked violation
- September 22, 2020State Violation/Reminder Notice1 linked violation
- November 12, 2019State Compliance achieved1 linked violation
- September 13, 2019State Violation/Reminder Notice1 linked violation
- September 13, 2019State Violation/Reminder Notice1 linked violation
- December 11, 2018State Violation/Reminder Notice1 linked violation
- December 11, 2018State Compliance achieved1 linked violation
- September 12, 2018State Compliance achieved1 linked violation
- June 18, 2018State Violation/Reminder Notice1 linked violation
- March 27, 2018State Compliance achieved1 linked violation
- February 15, 2018State Violation/Reminder Notice1 linked violation
- November 27, 2017State Compliance achieved1 linked violation
- August 7, 2017State Public Notification requested1 linked violation
- August 7, 2017State Compliance achieved1 linked violation
- August 7, 2017State Public Notification received1 linked violation
- June 30, 2017State Compliance achieved1 linked violation
- June 30, 2017State Public Notification received1 linked violation
- June 20, 2017State Violation/Reminder Notice1 linked violation
- June 20, 2017State Violation/Reminder Notice1 linked violation
- March 23, 2017State Violation/Reminder Notice1 linked violation
- February 14, 2017State Compliance achieved30 linked violations
- January 27, 2017State Violation/Reminder Notice1 linked violation
- January 27, 2017State Public Notification requested1 linked violation
- November 22, 2016State Violation/Reminder Notice1 linked violation
- September 28, 2016State Violation/Reminder Notice30 linked violations
- September 28, 2016State Violation/Reminder Notice29 linked violations
- September 28, 2016State Compliance achieved1 linked violation
- November 13, 2015State Compliance achieved1 linked violation
- October 28, 2015State Violation/Reminder Notice1 linked violation
- September 15, 2015State Compliance achieved1 linked violation
- September 15, 2015State Public Notification received1 linked violation
- August 12, 2015State Compliance achieved1 linked violation
- July 24, 2015State Violation/Reminder Notice1 linked violation
- July 17, 2015State Compliance achieved1 linked violation
- July 10, 2015State Violation/Reminder Notice1 linked violation
- June 12, 2015State Compliance achieved1 linked violation
- June 12, 2015State Violation/Reminder Notice1 linked violation
- April 15, 2015State Compliance achieved1 linked violation
- January 23, 2015State Violation/Reminder Notice1 linked violation
- January 23, 2015State Public Notification requested1 linked violation
- November 13, 2014State Compliance achieved1 linked violation
- September 23, 2014State Compliance achieved1 linked violation
- September 22, 2014State Compliance achieved1 linked violation
- September 12, 2014State Compliance achieved5 linked violations
- August 22, 2014State Violation/Reminder Notice1 linked violation
- July 29, 2014State Violation/Reminder Notice2 linked violations
- April 24, 2014State Violation/Reminder Notice3 linked violations
- February 20, 2013State Violation/Reminder Notice12 linked violations
- February 20, 2013State Compliance achieved12 linked violations
- January 25, 2012State Compliance achieved4 linked violations
- January 24, 2012State Violation/Reminder Notice4 linked violations
- December 13, 2011State Public Notification requested1 linked violation
- December 13, 2011State Compliance achieved9 linked violations
- October 27, 2011State Public Notification requested1 linked violation
- October 27, 2011State Violation/Reminder Notice1 linked violation
- September 9, 2011State Public Notification requested4 linked violations
- September 9, 2011State Violation/Reminder Notice4 linked violations
- September 9, 2011State Public Notification requested4 linked violations
- September 9, 2011State Violation/Reminder Notice4 linked violations
- August 30, 2011State Violation/Reminder Notice7 linked violations
- August 30, 2011State Violation/Reminder Notice7 linked violations
- July 26, 2011State Compliance achieved9 linked violations
- May 26, 2011State Violation/Reminder Notice1 linked violation
- May 26, 2011State Violation/Reminder Notice1 linked violation
Contact
FAMILY AND FRIENDS
215-297-8282
POINT PLEASANT, PA 18950