MEDFORD, OR · Jackson County
A RIVER RUNS THROUGH Water System
Consumer Confidence Report status
A RIVER RUNS THROUGH must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 item for A RIVER RUNS THROUGH that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Oregon’s official records. Always confirm current status with Oregon before making decisions based on this information.
System facts
- System ID (PWSID)
- OR4195342
- System type
- Community Water System
- Population served
- 30
- Service connections
- 25
- Ownership
- privately owned
- Water source
- groundwater (wells)
A RIVER RUNS THROUGH is one of 1,168 community water systems in Oregon in the 500 or fewer people size category, serving 30 people from groundwater.
As of August 1, 2026, its federal record holds 85 entries between 2010 and 2026, of which 1 remains open; none are health-based.
Of the 85, 82 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, volatile organic chemicals, and the Total Coliform Rules.
Violation history
Monitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2026 – February 28, 2026
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2025
UnaddressedMaximum Contaminant Level Violation, Average
Health-basedNitrate
April 1, 2025 – June 30, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2023 – August 10, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2019 – January 31, 2019
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2019 – April 8, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2018 – December 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2018 – November 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2018 – October 31, 2018
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2018 – December 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2018 – September 30, 2018
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2018 – September 30, 2018
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2018 – April 8, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2018 – July 31, 2018
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2018 – September 30, 2018
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2018 – September 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2018 – May 31, 2018
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2018 – June 30, 2018
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2018 – June 30, 2018
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2018 – June 30, 2018
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2018 – January 31, 2018
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—2,4-D
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Chlordane
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Nitrate
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Benzene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Toluene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Styrene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Endrin
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Dalapon
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Diquat
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Endothall
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Simazine
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Picloram
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Atrazine
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—LASSO
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2017 – December 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2017 – December 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2017 – September 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2017 – June 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2016 – December 31, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2016 – September 30, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2016 – June 30, 2016
ArchivedMonitoring, Regular
—Nitrate
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2015 – March 31, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Nitrate
January 1, 2010 – December 31, 2010
Resolved
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| February 1, 2026 – February 28, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2025 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Unaddressed |
| April 1, 2025 – June 30, 2025 | Maximum Contaminant Level Violation, Average | Nitrate | Health-based | Resolved |
| July 1, 2023 – August 10, 2023 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2019 – January 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2019 – April 8, 2019 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| December 1, 2018 – December 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2018 – November 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2018 – October 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2018 – December 31, 2018 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2018 – December 31, 2018 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2018 – December 31, 2018 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| September 1, 2018 – September 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2018 – April 8, 2019 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2018 – July 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Regular | Combined Uranium | — | Resolved |
| May 1, 2018 – May 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2018 – June 30, 2018 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2018 – June 30, 2018 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2018 – June 30, 2018 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2018 – January 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | LASSO | — | Resolved |
| December 1, 2017 – December 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2017 – December 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2016 – December 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2016 – September 30, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2015 – March 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2010 – December 31, 2010 | Monitoring, Regular | Nitrate | — | Resolved |
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
No enforcement actions on record for this system.
Common questions
Is A RIVER RUNS THROUGH required to publish a Consumer Confidence Report?
- Yes. A RIVER RUNS THROUGH is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is A RIVER RUNS THROUGH’s next Consumer Confidence Report due?
- A RIVER RUNS THROUGH’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does A RIVER RUNS THROUGH have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 item for A RIVER RUNS THROUGH that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
A RIVER RUNS THROUGH
541-840-9733
MEDFORD, OR 97504