KLAMATH FALLS, OR · Klamath County
COVE PARTNERSHIP Water System
Consumer Confidence Report status
COVE PARTNERSHIP must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 item for COVE PARTNERSHIP that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Oregon’s official records. Always confirm current status with Oregon before making decisions based on this information.
System facts
- System ID (PWSID)
- OR4194026
- System type
- Community Water System
- Population served
- 40
- Service connections
- 16
- Ownership
- privately owned
- Water source
- groundwater (wells)
COVE PARTNERSHIP is one of 1,168 community water systems in Oregon in the 500 or fewer people size category, serving 40 people from groundwater.
As of August 1, 2026, its federal record holds 79 entries between 1991 and 2025, of which 1 remains open; none are health-based.
Of the 79, 73 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Total Coliform Rules, inorganic chemicals, and the Radionuclides and Revised Rad Rule.
Violation history
Monitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2025 – December 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2025 – October 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2025 – September 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2025 – February 28, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2024 – August 31, 2024
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Combined Uranium
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2024 – March 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2024 – February 29, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2023 – May 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – April 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – March 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2023 – February 28, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2023 – January 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – November 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2022 – October 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2022 – September 30, 2022
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
August 29, 2022
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2022 – August 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2022 – July 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – June 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2022 – April 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2022 – March 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2022 – February 28, 2022
ResolvedMonitoring, Regular
—Nitrate
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2021 – October 31, 2021
ResolvedTreatment Technique, Level 1 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
August 14, 2021 – August 26, 2021
ResolvedMonitoring, Source Water (GWR)
—E. COLI
August 8, 2021 – October 7, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2021 – August 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – February 28, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2020 – May 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2019 – November 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – October 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2019 – September 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2019 – August 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2018 – September 30, 2018
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2014 – April 30, 2014
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 24, 2011 – April 9, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2011 – October 31, 2011
ResolvedMonitoring, Source Water (GWR)
—E. COLI
September 1, 2011 – April 9, 2012
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2010 – March 31, 2010
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2007 – September 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2007 – June 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2006 – December 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2006 – September 30, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2006 – June 30, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2005 – September 30, 2005
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
July 1, 2005 – September 30, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2005 – June 30, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2005 – March 31, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2004 – December 31, 2004
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2004 – June 30, 2004
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2003 – October 31, 2003
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2003 – September 30, 2003
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2003 – March 31, 2003
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2002 – June 30, 2002
ResolvedMonitoring, Regular
—Nitrate
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2001 – December 31, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2001 – September 30, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2001 – June 30, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2001 – March 31, 2001
ResolvedMonitoring, Regular
—Nitrate
January 1, 2001 – December 31, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2000 – September 30, 2000
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
April 1, 1999 – June 30, 1999
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1997 – September 30, 1997
ResolvedMonitoring, Regular
—Nitrate
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Repeat Minor (TCR)
—Coliform (TCR)
July 1, 1994 – September 30, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1992 – December 31, 1992
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1991 – March 31, 1991
Resolved
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| December 1, 2025 – December 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2025 – October 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2025 – September 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Combined Uranium | — | Archived |
| March 1, 2024 – March 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2024 – February 29, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2023 – May 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2023 – April 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2023 – February 28, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – January 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2022 – November 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2022 – October 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2022 – September 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 29, 2022 | Public Notification Violation without NPDWR Violation | Public Notice | — | Unaddressed |
| August 1, 2022 – August 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2022 – July 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2022 – June 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2022 – April 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2022 – March 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2022 – February 28, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 2021 – October 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 14, 2021 – August 26, 2021 | Treatment Technique, Level 1 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| August 8, 2021 – October 7, 2021 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| August 1, 2021 – August 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2021 – February 28, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2020 – May 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2019 – November 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2019 – October 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2019 – September 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2019 – August 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2014 – April 30, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 24, 2011 – April 9, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2011 – October 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2011 – April 9, 2012 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| July 1, 2011 – September 30, 2011 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2009 – June 30, 2009 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2007 – September 30, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2007 – June 30, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2006 – December 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2006 – September 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2006 – June 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2005 – September 30, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2005 – September 30, 2005 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2005 – June 30, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2005 – March 31, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2004 – December 31, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2003 – October 31, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2003 – September 30, 2003 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 2003 – March 31, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2002 – June 30, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 2001 – December 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2001 – September 30, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2001 – June 30, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2001 – March 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2001 – December 31, 2001 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 2000 – September 30, 2000 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1999 – June 30, 1999 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1997 – September 30, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1994 – September 30, 1994 | Monitoring, Repeat Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 1992 – December 31, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1991 – March 31, 1991 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yet
Enforcement actions
- January 30, 2026State Compliance achieved1 linked violation
- November 24, 2025State Compliance achieved1 linked violation
- November 24, 2025State Compliance achieved1 linked violation
- September 2, 2025State Compliance achieved1 linked violation
- March 31, 2025State Compliance achieved1 linked violation
- September 6, 2024State Compliance achieved1 linked violation
- May 6, 2024State Compliance achieved1 linked violation
- May 6, 2024State Compliance achieved1 linked violation
- June 20, 2023State Compliance achieved2 linked violations
- June 6, 2023State Compliance achieved1 linked violation
- June 6, 2023State Compliance achieved1 linked violation
- June 6, 2023State Compliance achieved1 linked violation
- June 2, 2023State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- May 1, 2023State Bilateral Compliance Agreement signed4 linked violations
- January 17, 2023State Compliance achieved1 linked violation
- January 3, 2023State Compliance achieved1 linked violation
- January 3, 2023State Compliance achieved1 linked violation
- January 3, 2023State Compliance achieved1 linked violation
- January 3, 2023State Compliance achieved1 linked violation
- January 3, 2023State Compliance achieved1 linked violation
- January 3, 2023State Compliance achieved1 linked violation
- May 19, 2022State Compliance achieved1 linked violation
- May 19, 2022State Compliance achieved1 linked violation
- May 19, 2022State Compliance achieved1 linked violation
- December 3, 2021State Compliance achieved1 linked violation
- October 7, 2021State Compliance achieved1 linked violation
- October 1, 2021State Compliance achieved1 linked violation
- August 26, 2021State Compliance achieved1 linked violation
- April 2, 2021State Compliance achieved1 linked violation
- June 26, 2020State Compliance achieved1 linked violation
- March 9, 2020State Compliance achieved1 linked violation
- December 6, 2019State Compliance achieved1 linked violation
- December 6, 2019State Compliance achieved1 linked violation
- December 6, 2019State Compliance achieved1 linked violation
- December 6, 2019State Compliance achieved1 linked violation
- October 11, 2018State Compliance achieved1 linked violation
- September 29, 2014State Compliance achieved1 linked violation
- April 9, 2012State Compliance achieved2 linked violations
- January 30, 2012State Violation/Reminder Notice1 linked violation
- December 22, 2011State Compliance achieved1 linked violation
- December 22, 2011State Compliance achieved1 linked violation
- November 29, 2011State Violation/Reminder Notice1 linked violation
- October 31, 2011State Violation/Reminder Notice2 linked violations
- October 24, 2011State Public Notification requested1 linked violation
- December 10, 2010State Compliance achieved1 linked violation
- October 26, 2010State Violation/Reminder Notice1 linked violation
- April 26, 2010State Violation/Reminder Notice1 linked violation
- January 25, 2010State Violation/Reminder Notice1 linked violation
- July 27, 2009State Violation/Reminder Notice1 linked violation
- May 12, 2008State Compliance achieved40 linked violations
- April 27, 2006State Compliance achieved34 linked violations
- November 14, 2003State Public Notification received2 linked violations
- February 2, 1999State Public Notification received2 linked violations
- January 1, 1998State Compliance achieved1 linked violation
Common questions
Is COVE PARTNERSHIP required to publish a Consumer Confidence Report?
- Yes. COVE PARTNERSHIP is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is COVE PARTNERSHIP’s next Consumer Confidence Report due?
- COVE PARTNERSHIP’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does COVE PARTNERSHIP have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 item for COVE PARTNERSHIP that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
COVE PARTNERSHIP
541-891-0561
KLAMATH FALLS, OR 97601