PORTLAND, OR · Columbia County
MCCUDDYS LANDING Water System
Consumer Confidence Report status
MCCUDDYS LANDING must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 4 items for MCCUDDYS LANDING that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Oregon’s official records. Always confirm current status with Oregon before making decisions based on this information.
System facts
- System ID (PWSID)
- OR4106090
- System type
- Community Water System
- Population served
- 70
- Service connections
- 1
- Ownership
- privately owned
- Water source
- groundwater (wells)
MCCUDDYS LANDING is one of 1,168 community water systems in Oregon in the 500 or fewer people size category, serving 70 people from groundwater.
As of August 1, 2026, its federal record holds 94 entries between 2002 and 2026, of which 4 remain open; none are health-based.
Of the 94, 90 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, volatile organic chemicals, and the Lead and Copper Rule.
Violation history
Initial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2026
UnaddressedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2025
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2025 – October 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2025 – September 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2025 – August 31, 2025
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2025
UnaddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025
UnaddressedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2025 – December 31, 2025
ArchivedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2024 – October 21, 2024
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – August 1, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2024 – June 30, 2024
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2024 – February 23, 2024
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2023 – June 26, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2022 – December 31, 2022
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2022 – June 26, 2023
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2022 – December 31, 2022
ArchivedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
October 1, 2021 – September 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2021 – September 30, 2021
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2021 – November 5, 2021
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2020 – September 21, 2020
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Dalapon
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Diquat
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Endothall
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Simazine
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Picloram
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Atrazine
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—LASSO
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—2,4-D
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Chlordane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Benzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Toluene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Styrene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Endrin
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2020 – December 31, 2022
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2019 – September 30, 2019
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2018 – July 20, 2018
ResolvedMonitoring, Regular
—Nitrate
January 1, 2018 – December 31, 2018
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2018 – July 20, 2018
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2017 – July 20, 2018
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2017 – December 31, 2017
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2016 – October 21, 2016
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2016 – October 21, 2016
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2015 – October 21, 2016
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2015 – October 21, 2016
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2014 – December 31, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2014 – December 31, 2022
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2014 – March 21, 2014
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2013 – March 21, 2014
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2013 – March 21, 2014
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2012 – March 21, 2014
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2012 – September 30, 2012
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2012 – December 31, 2012
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2012 – December 31, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2011 – December 31, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2002 – June 30, 2002
ResolvedMonitoring, Regular
—Nitrate
January 1, 2002 – December 31, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2002 – March 31, 2002
Resolved
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2026 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Unaddressed |
| October 1, 2025 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Unaddressed |
| October 1, 2025 – October 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2025 – September 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2025 – August 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2025 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Unaddressed |
| July 1, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Unaddressed |
| January 1, 2025 – December 31, 2025 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Archived |
| October 1, 2024 – October 21, 2024 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2024 – August 1, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2024 – June 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – February 23, 2024 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2023 – June 26, 2023 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| December 1, 2022 – December 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2022 – June 26, 2023 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – December 31, 2022 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Archived |
| October 1, 2021 – September 30, 2022 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| September 1, 2021 – September 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2021 – November 5, 2021 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2020 – September 21, 2020 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| July 1, 2019 – September 30, 2019 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2018 – July 20, 2018 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2018 – July 20, 2018 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2017 – July 20, 2018 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2017 – December 31, 2017 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Resolved |
| July 1, 2016 – October 21, 2016 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2016 – October 21, 2016 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2015 – October 21, 2016 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2015 – October 21, 2016 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2014 – December 31, 2022 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2014 – December 31, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2014 – March 21, 2014 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2013 – March 21, 2014 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2013 – March 21, 2014 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2012 – March 21, 2014 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| January 1, 2012 – December 31, 2012 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| December 1, 2011 – December 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2002 – June 30, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2002 – December 31, 2002 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2002 – March 31, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
No enforcement actions on record for this system.
Common questions
Is MCCUDDYS LANDING required to publish a Consumer Confidence Report?
- Yes. MCCUDDYS LANDING is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is MCCUDDYS LANDING’s next Consumer Confidence Report due?
- MCCUDDYS LANDING’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does MCCUDDYS LANDING have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 4 items for MCCUDDYS LANDING that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
MCCUDDYS LANDING
503-289-7879
PORTLAND, OR 97217