PORTLAND, OR · Multnomah County
BIG OAK MARINA Water System
Consumer Confidence Report status
BIG OAK MARINA must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 2 items for BIG OAK MARINA that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Oregon’s official records. Always confirm current status with Oregon before making decisions based on this information.
System facts
- System ID (PWSID)
- OR4106054
- System type
- Community Water System
- Population served
- 30
- Service connections
- 25
- Ownership
- privately owned
- Water source
- groundwater (wells)
BIG OAK MARINA is one of 1,168 community water systems in Oregon in the 500 or fewer people size category, serving 30 people from groundwater.
As of August 1, 2026, its federal record holds 95 entries between 2000 and 2026, of which 2 remain open; none are health-based.
Of the 95, 86 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, volatile organic chemicals, and the Total Coliform Rules.
Violation history
Initial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2026
UnaddressedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2025 – November 13, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2025 – September 30, 2025
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2025
UnaddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025 – November 13, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2025 – February 28, 2025
ResolvedMaximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
September 1, 2024 – September 30, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 30, 2024 – November 21, 2024
ResolvedMaximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
August 1, 2024 – August 31, 2024
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – August 1, 2024
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—2,4-D
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2024 – December 31, 2024
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2024 – February 23, 2024
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Benzene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Toluene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Styrene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Endrin
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Dalapon
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Diquat
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Endothall
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Simazine
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Picloram
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Atrazine
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—LASSO
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Chlordane
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Arsenic
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Combined Uranium
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Barium
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Cadmium
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Chromium
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—CYANIDE
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Fluoride
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Mercury
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Nickel
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Antimony, Total
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Beryllium, Total
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Thallium, Total
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Selenium
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Nitrite
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2022 – December 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – November 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2022 – October 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2022 – August 31, 2022
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
January 1, 2003 – January 31, 2003
ResolvedMonitoring, Regular
—Nitrate
January 1, 2003 – January 28, 2003
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
December 1, 2002 – December 31, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2002 – November 30, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2002 – October 31, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2002 – July 31, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2002 – June 30, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2002 – May 31, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2002 – April 30, 2002
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
January 1, 2002 – March 31, 2002
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
January 1, 2002 – March 31, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2001 – March 31, 2001
ResolvedMonitoring, Regular
—Nitrate
January 1, 2001 – December 31, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2000 – March 31, 2000
Resolved
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2026 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Unaddressed |
| October 1, 2025 – November 13, 2025 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| September 1, 2025 – September 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2025 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Unaddressed |
| July 1, 2025 – November 13, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2024 – September 30, 2024 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| August 30, 2024 – November 21, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2024 – August 31, 2024 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| July 1, 2024 – August 1, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2024 – February 23, 2024 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Arsenic | — | Archived |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Barium | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Cadmium | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Chromium | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | CYANIDE | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Fluoride | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Mercury | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Nickel | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Antimony, Total | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Beryllium, Total | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Thallium, Total | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Selenium | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Nitrite | — | Archived |
| December 1, 2022 – December 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2022 – November 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2022 – October 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2022 – August 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2003 – January 31, 2003 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2003 – January 28, 2003 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 2002 – December 31, 2002 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| November 1, 2002 – November 30, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2002 – October 31, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2002 – July 31, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2002 – June 30, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2002 – May 31, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2002 – April 30, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2002 – March 31, 2002 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 2002 – March 31, 2002 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 2001 – March 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2001 – December 31, 2001 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2000 – March 31, 2000 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- November 13, 2025State Compliance achieved3 linked violations
- October 24, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved2 linked violations
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved2 linked violations
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved4 linked violations
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved3 linked violations
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved4 linked violations
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved2 linked violations
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- March 13, 2025State Compliance achieved1 linked violation
- November 21, 2024State Compliance achieved4 linked violations
- September 19, 2024State Public Notification requested2 linked violations
- August 30, 2024State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- August 28, 2024State Public Notification requested2 linked violations
- August 1, 2024State Compliance achieved1 linked violation
- February 23, 2024State Compliance achieved2 linked violations
- September 15, 2023State Compliance achieved2 linked violations
- October 5, 2022State Compliance achieved4 linked violations
- January 28, 2003State Compliance achieved4 linked violations
- January 9, 2003State Compliance achieved2 linked violations
- January 9, 2003State Compliance achieved3 linked violations
- August 27, 2002State Compliance achieved4 linked violations
Common questions
Is BIG OAK MARINA required to publish a Consumer Confidence Report?
- Yes. BIG OAK MARINA is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is BIG OAK MARINA’s next Consumer Confidence Report due?
- BIG OAK MARINA’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does BIG OAK MARINA have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 2 items for BIG OAK MARINA that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
BIG OAK MARINA
503-289-7879
PORTLAND, OR 97217