JUNCTION CITY, OR · Lane County
FERNRIDGE MOBILE ESTATES Water System
Consumer Confidence Report status
FERNRIDGE MOBILE ESTATES must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 5 items for FERNRIDGE MOBILE ESTATES that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Oregon’s official records. Always confirm current status with Oregon before making decisions based on this information.
System facts
- System ID (PWSID)
- OR4100421
- System type
- Community Water System
- Population served
- 250
- Service connections
- 90
- Ownership
- privately owned
- Water source
- groundwater (wells)
FERNRIDGE MOBILE ESTATES is one of 1,168 community water systems in Oregon in the 500 or fewer people size category, serving 250 people from groundwater.
As of August 1, 2026, its federal record holds 171 entries between 1976 and 2026, of which 5 remain open; none are health-based.
Of the 171, 166 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Lead and Copper Rule, synthetic organic chemicals, and the Total Coliform Rules.
Violation history
Initial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2026
UnaddressedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2026
UnaddressedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2026
UnaddressedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2026
UnaddressedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2025 – October 9, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2025 – January 9, 2026
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2025 – October 9, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2025 – October 9, 2025
ResolvedMonitoring, Regular
—Nitrate
January 1, 2025 – December 31, 2025
ArchivedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2025 – December 31, 2025
ArchivedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2025 – October 9, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2025 – October 9, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2025 – October 9, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2025 – October 9, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2025 – October 9, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2024 – January 7, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2024 – January 7, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2024 – January 7, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2024 – January 7, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2024 – January 7, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2024 – January 7, 2025
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2024 – December 31, 2024
ArchivedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2024 – January 7, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2024 – January 7, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2024 – January 7, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2024 – January 7, 2025
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2023
UnaddressedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2023 – January 10, 2024
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2023 – January 10, 2024
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2023 – January 10, 2024
ResolvedMonitoring, Regular
—Endrin
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Benzene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Tetrachloroethylene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Trichloroethylene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Carbon tetrachloride
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Vinyl chloride
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Xylenes, Total
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Nitrate
January 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Chlordane
January 1, 2023 – December 31, 2025
ArchivedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2023 – April 10, 2023
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2023 – April 10, 2023
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2023 – July 10, 2023
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—2,4-D
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Heptachlor
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—LASSO
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Atrazine
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Carbofuran
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Dinoseb
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Picloram
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Simazine
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—OXAMYL
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Glyphosate
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Endothall
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Diquat
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Dalapon
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—Toxaphene
January 1, 2023 – December 31, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
January 1, 2023 – December 31, 2025
ArchivedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2022 – April 10, 2023
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2022 – April 10, 2023
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2022 – November 9, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2022 – November 9, 2022
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2022 – December 31, 2024
ArchivedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2022 – August 9, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2022 – August 9, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2022 – August 9, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2022 – August 9, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2022 – August 9, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2022 – August 9, 2022
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2022 – December 31, 2024
ArchivedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2021 – January 10, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2021 – January 10, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2021 – January 10, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2021 – January 10, 2022
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2021 – June 2, 2021
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2021 – June 2, 2021
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2021 – June 2, 2021
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2021 – June 2, 2021
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2021 – August 10, 2021
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2020 – September 21, 2020
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2020 – June 2, 2021
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2020 – June 2, 2021
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2020 – August 10, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2020 – August 10, 2020
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2020 – August 10, 2020
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2020 – August 10, 2020
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2020 – August 10, 2020
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
January 1, 2020 – August 10, 2020
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2020 – December 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2019 – November 30, 2019
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2019 – July 3, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2019 – September 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2019 – August 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2019 – June 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2018 – September 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2018 – April 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2018 – February 28, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2017 – December 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2017 – November 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2017 – September 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2017 – April 30, 2017
ResolvedMonitoring, Regular
—Chlordane
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Nitrate
January 1, 2017 – December 31, 2017
ResolvedMonitoring, Regular
—Endrin
January 1, 2017 – December 31, 2019
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2017 – December 31, 2017
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2017 – December 31, 2017
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2017 – December 31, 2017
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2017 – December 31, 2025
ArchivedMonitoring, Regular
—Combined Uranium
January 1, 2017 – December 31, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2017 – December 31, 2025
ArchivedMonitoring and Reporting (DBP)
—TTHM
October 1, 2016 – September 30, 2019
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
October 1, 2016 – September 30, 2019
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2012 – December 31, 2012
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2012 – December 31, 2012
ResolvedFailure to Conduct Assessment Monitoring
—COLIPHAGE
January 1, 2012 – December 31, 2012
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 23, 2011 – December 9, 2011
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 2011 – November 30, 2011
ResolvedMonitoring, Source Water (GWR)
—E. COLI
October 1, 2011 – January 3, 2014
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 2011 – October 31, 2011
ResolvedMonitoring, Source Water (GWR)
—E. COLI
October 1, 2011 – January 3, 2014
ResolvedMonitoring, Source Water (GWR)
—E. COLI
October 1, 2011 – January 3, 2014
ResolvedMonitoring, Source Water (GWR)
—E. COLI
January 1, 2011 – January 3, 2014
ResolvedMonitoring, Source Water (GWR)
—E. COLI
January 1, 2011 – January 3, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2009 – August 31, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2009 – January 31, 2009
ResolvedMonitoring, Repeat Minor (TCR)
—Coliform (TCR)
September 1, 2003 – September 30, 2003
ResolvedMonitoring, Regular
—Nitrate
January 1, 2001 – December 31, 2001
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
April 1, 1998 – April 30, 1998
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
April 1, 1998 – April 30, 1998
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
April 1, 1997 – April 30, 1997
ResolvedMonitoring, Repeat Minor (TCR)
—Coliform (TCR)
March 1, 1997 – March 31, 1997
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
March 1, 1997 – March 31, 1997
ResolvedMonitoring, Regular
—Nitrate
January 1, 1997 – December 31, 1997
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
January 1, 1997 – January 31, 1997
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
December 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Nitrate
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1994 – September 30, 1994
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
September 1, 1993 – September 30, 1993
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1993 – January 31, 1993
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1992 – December 31, 1992
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1992 – December 31, 1992
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
June 1, 1976 – May 31, 1980
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
June 1, 1976 – May 31, 1980
Archived
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2026 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Unaddressed |
| January 1, 2026 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Unaddressed |
| January 1, 2026 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Unaddressed |
| January 1, 2026 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2025 – October 9, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2025 – January 9, 2026 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2025 – October 9, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2025 – October 9, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2025 – December 31, 2025 | Monitoring, Regular | Nitrate | — | Archived |
| January 1, 2025 – December 31, 2025 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Archived |
| January 1, 2025 – October 9, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2025 – October 9, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2025 – October 9, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2025 – October 9, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2025 – October 9, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2024 – December 31, 2024 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Archived |
| January 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2024 – January 7, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2023 – January 10, 2024 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2023 – January 10, 2024 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2023 – January 10, 2024 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Endrin | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Benzene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Tetrachloroethylene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Trichloroethylene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | 1,2-Dichloropropane | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Carbon tetrachloride | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | 1,2-Dichloroethane | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | 1,1-Dichloroethylene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Vinyl chloride | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | p-Dichlorobenzene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | o-Dichlorobenzene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | DICHLOROMETHANE | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Xylenes, Total | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Archived |
| January 1, 2023 – December 31, 2023 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Chlordane | — | Archived |
| January 1, 2023 – April 10, 2023 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2023 – April 10, 2023 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2023 – July 10, 2023 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | LASSO | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Picloram | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Simazine | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Endothall | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Diquat | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| July 1, 2022 – April 10, 2023 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2022 – April 10, 2023 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2022 – November 9, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2022 – November 9, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – December 31, 2024 | Monitoring and Reporting (DBP) | TTHM | — | Archived |
| January 1, 2022 – August 9, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – August 9, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – August 9, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – August 9, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – August 9, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – August 9, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – December 31, 2024 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Archived |
| July 1, 2021 – January 10, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2021 – January 10, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2021 – January 10, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2021 – January 10, 2022 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2021 – June 2, 2021 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2021 – June 2, 2021 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2021 – June 2, 2021 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2021 – June 2, 2021 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2021 – August 10, 2021 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2020 – September 21, 2020 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2020 – June 2, 2021 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2020 – June 2, 2021 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2020 – August 10, 2020 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – August 10, 2020 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2020 – August 10, 2020 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2020 – August 10, 2020 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2020 – August 10, 2020 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2020 – August 10, 2020 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2020 – December 31, 2020 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Resolved |
| November 1, 2019 – November 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2019 – July 3, 2020 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2019 – September 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2019 – August 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2019 – June 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2018 – September 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2018 – April 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2018 – February 28, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2017 – December 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2017 – November 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2017 – September 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2017 – April 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2017 – December 31, 2017 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2017 – December 31, 2017 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Resolved |
| January 1, 2017 – December 31, 2017 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Resolved |
| January 1, 2017 – December 31, 2017 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Resolved |
| January 1, 2017 – December 31, 2025 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| January 1, 2017 – December 31, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| January 1, 2017 – December 31, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| October 1, 2016 – September 30, 2019 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| October 1, 2016 – September 30, 2019 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2012 – December 31, 2012 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Resolved |
| January 1, 2012 – December 31, 2012 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Resolved |
| January 1, 2012 – December 31, 2012 | Failure to Conduct Assessment Monitoring | COLIPHAGE | — | Resolved |
| December 23, 2011 – December 9, 2011 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2011 – November 30, 2011 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2011 – January 3, 2014 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| October 1, 2011 – October 31, 2011 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2011 – January 3, 2014 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| October 1, 2011 – January 3, 2014 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| January 1, 2011 – January 3, 2014 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| January 1, 2011 – January 3, 2014 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| August 1, 2009 – August 31, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2009 – January 31, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2003 – September 30, 2003 | Monitoring, Repeat Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2001 – December 31, 2001 | Monitoring, Regular | Nitrate | — | Resolved |
| April 1, 1998 – April 30, 1998 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| April 1, 1998 – April 30, 1998 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| April 1, 1997 – April 30, 1997 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 1997 – March 31, 1997 | Monitoring, Repeat Minor (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 1997 – March 31, 1997 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 1997 – December 31, 1997 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1997 – January 31, 1997 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 1996 – December 31, 1996 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Nitrate | — | Resolved |
| September 1, 1994 – September 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 1993 – September 30, 1993 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1993 – January 31, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| December 1, 1992 – December 31, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 1992 – December 31, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| June 1, 1976 – May 31, 1980 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| June 1, 1976 – May 31, 1980 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- January 9, 2026State Compliance achieved1 linked violation
- January 9, 2026State Compliance achieved1 linked violation
- October 9, 2025State Compliance achieved8 linked violations
- January 7, 2025State Compliance achieved10 linked violations
- April 3, 2024State Compliance achieved1 linked violation
- January 10, 2024State Compliance achieved3 linked violations
- July 10, 2023State Compliance achieved1 linked violation
- April 10, 2023State Compliance achieved4 linked violations
- November 9, 2022State Compliance achieved2 linked violations
- August 9, 2022State Compliance achieved6 linked violations
- January 10, 2022State Compliance achieved4 linked violations
- January 7, 2022State Compliance achieved2 linked violations
- December 22, 2021State Compliance achieved1 linked violation
- August 10, 2021State Compliance achieved1 linked violation
- June 2, 2021State Compliance achieved6 linked violations
- January 14, 2021State Compliance achieved8 linked violations
- September 21, 2020State Compliance achieved1 linked violation
- August 10, 2020State Compliance achieved6 linked violations
- July 3, 2020State Compliance achieved1 linked violation
- February 28, 2020State Compliance achieved1 linked violation
- December 30, 2019State Compliance achieved1 linked violation
- November 4, 2019State Compliance achieved1 linked violation
- November 4, 2019State Compliance achieved1 linked violation
- August 2, 2019State Compliance achieved1 linked violation
- January 2, 2019State Compliance achieved1 linked violation
- October 4, 2018State Compliance achieved1 linked violation
- June 4, 2018State Compliance achieved1 linked violation
- March 7, 2018State Compliance achieved3 linked violations
- March 2, 2018State Compliance achieved1 linked violation
- February 5, 2018State Compliance achieved1 linked violation
- February 5, 2018State Compliance achieved1 linked violation
- November 3, 2017State Compliance achieved1 linked violation
- May 3, 2017State Compliance achieved1 linked violation
- January 3, 2014State Compliance achieved8 linked violations
- February 4, 2013State Violation/Reminder Notice3 linked violations
- January 30, 2012State Violation/Reminder Notice1 linked violation
- December 9, 2011State Compliance achieved3 linked violations
- November 29, 2011State Violation/Reminder Notice5 linked violations
- February 22, 2011State Violation/Reminder Notice3 linked violations
- September 28, 2009State Violation/Reminder Notice10 linked violations
- February 9, 2004State Compliance achieved4 linked violations
- April 7, 1998State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- January 1, 1998State Compliance achieved1 linked violation
- January 15, 1997State Public Notification received3 linked violations
- December 21, 1996State Public Notification received3 linked violations
- June 7, 1995State Compliance achieved1 linked violation
- February 6, 1995State Compliance achieved1 linked violation
- November 8, 1994State Public Notification received2 linked violations
- November 4, 1994State Formal Notice of Violation issued1 linked violation
Common questions
Is FERNRIDGE MOBILE ESTATES required to publish a Consumer Confidence Report?
- Yes. FERNRIDGE MOBILE ESTATES is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is FERNRIDGE MOBILE ESTATES’s next Consumer Confidence Report due?
- FERNRIDGE MOBILE ESTATES’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does FERNRIDGE MOBILE ESTATES have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 5 items for FERNRIDGE MOBILE ESTATES that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
FERNRIDGE MOBILE ESTATES
541-689-8237
JUNCTION CITY, OR 97448