OK · Oklahoma County
TIMBERLAND MHC Water System
Consumer Confidence Report status
TIMBERLAND MHC must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 item for TIMBERLAND MHC that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Oklahoma’s official records. Always confirm current status with Oklahoma before making decisions based on this information.
System facts
- System ID (PWSID)
- OK4005573
- System type
- Community Water System
- Population served
- 200
- Service connections
- 180
- Ownership
- privately owned
- Water source
- groundwater (wells)
TIMBERLAND MHC is one of 1,277 community water systems in Oklahoma in the 500 or fewer people size category, serving 200 people from groundwater.
As of August 1, 2026, its federal record holds 42 entries between 1991 and 2025, of which 1 remains open; none are health-based.
Of the 42, 30 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Total Coliform Rules, the Consumer Confidence Rule, and the Lead and Copper Rule.
Violation history
Consumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025 – June 23, 2025
ResolvedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024 – July 15, 2025
ResolvedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024 – July 15, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – July 26, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2022 – January 31, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2022 – February 22, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2021 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2021 – November 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2021 – October 31, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2021 – December 31, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2021 – December 31, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2021 – December 31, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – November 17, 2022
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 2, 2020 – November 17, 2022
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
December 2, 2019 – November 17, 2022
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2017 – December 12, 2017
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2016 – December 12, 2017
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2015 – December 12, 2017
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2014 – December 12, 2017
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2013 – May 31, 2013
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 24, 2012
UnaddressedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2011 – December 31, 2011
ResolvedMonitoring, Source Water (GWR)
—E. COLI
July 1, 2011 – July 31, 2011
ResolvedMonitoring, Source Water (GWR)
—E. COLI
October 1, 2010 – October 31, 2010
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 2010 – October 31, 2010
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
September 1, 2010 – September 30, 2010
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
September 1, 2010 – September 30, 2010
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
September 1, 2010 – September 30, 2010
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
August 1, 2010 – August 31, 2010
ResolvedMonitoring, Source Water (GWR)
—E. COLI
August 1, 2010 – August 31, 2010
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
July 1, 2010 – December 31, 2010
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
July 1, 2010 – December 31, 2010
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
January 1, 2010 – June 30, 2010
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
January 1, 2010 – June 30, 2010
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
October 1, 2009 – December 31, 2009
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
August 1, 2009 – August 31, 2009
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 2009 – August 31, 2009
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2009 – December 31, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2006 – October 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2006 – September 30, 2006
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
July 1, 1991 – July 31, 1991
Resolved
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| July 1, 2025 – June 23, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| October 17, 2024 – July 15, 2025 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Resolved |
| October 17, 2024 – July 15, 2025 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Resolved |
| July 1, 2024 – July 26, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2022 – January 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2022 – February 22, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2021 – December 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2021 – November 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2021 – October 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2021 – December 31, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2021 – December 31, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2021 – December 31, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2021 – November 17, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| October 2, 2020 – November 17, 2022 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| December 2, 2019 – November 17, 2022 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2017 – December 12, 2017 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2016 – December 12, 2017 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2015 – December 12, 2017 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2014 – December 12, 2017 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| May 1, 2013 – May 31, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 24, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| December 1, 2011 – December 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2011 – July 31, 2011 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| October 1, 2010 – October 31, 2010 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| October 1, 2010 – October 31, 2010 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2010 – September 30, 2010 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2010 – September 30, 2010 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| September 1, 2010 – September 30, 2010 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2010 – August 31, 2010 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2010 – August 31, 2010 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| July 1, 2010 – December 31, 2010 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2010 – December 31, 2010 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2010 – June 30, 2010 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2010 – June 30, 2010 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2009 – December 31, 2009 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2009 – December 31, 2009 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| August 1, 2009 – August 31, 2009 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2009 – August 31, 2009 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| October 1, 2006 – October 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2006 – September 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1991 – July 31, 1991 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
Enforcement actions
- July 15, 2025State Compliance achieved1 linked violation
- July 11, 2025State Violation/Reminder Notice1 linked violation
- July 26, 2024State Compliance achieved1 linked violation
- December 2, 2022State Public Notification received1 linked violation
- December 2, 2022State Public Notification received3 linked violations
- July 19, 2022State Compliance achieved2 linked violations
- March 24, 2022State Violation/Reminder Notice1 linked violation
- March 24, 2022State Public Notification requested2 linked violations
- March 1, 2022State Public Notification requested3 linked violations
- January 19, 2022State Public Notification requested2 linked violations
- January 5, 2022State Violation/Reminder Notice2 linked violations
- December 28, 2021State Public Notification requested2 linked violations
- December 28, 2021State Violation/Reminder Notice2 linked violations
- December 12, 2017State Compliance achieved4 linked violations
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 9, 2016Federal Compliance achieved3 linked violations
- June 19, 2014State Compliance achieved2 linked violations
- February 2, 2012State Public Notification requested3 linked violations
- October 3, 2011State Public Notification requested1 linked violation
- August 18, 2011State Public Notification requested1 linked violation
- April 12, 2011State Violation/Reminder Notice7 linked violations
- April 12, 2011State Public Notification requested7 linked violations
- April 12, 2011State Public Notification requested2 linked violations
- April 12, 2011State Public Notification requested1 linked violation
- April 12, 2011State Public Notification requested3 linked violations
- April 12, 2011State Administrative/Compliance Order with penalty issued3 linked violations
- February 18, 2011State Public Notification received1 linked violation
- January 11, 2011State Public Notification requested1 linked violation
- November 16, 2010State Public Notification requested1 linked violation
- November 16, 2010State Public Notification requested1 linked violation
- November 16, 2010State Public Notification requested1 linked violation
- November 12, 2010State Public Notification requested1 linked violation
- September 10, 2010State Public Notification requested3 linked violations
- September 10, 2010State Public Notification requested1 linked violation
- April 6, 2010State Public Notification received1 linked violation
- March 25, 2010State Public Notification requested1 linked violation
- March 3, 2010State Public Notification requested1 linked violation
- February 8, 2010State Violation/Reminder Notice1 linked violation
- December 14, 2009State Public Notification requested1 linked violation
- December 14, 2009State Public Notification requested1 linked violation
- December 14, 2009State Public Notification requested1 linked violation
- February 6, 2009State Public Notification requested1 linked violation
- November 21, 2008State Public Notification requested1 linked violation
- October 27, 2008State Public Notification requested1 linked violation
- July 9, 2008State Public Notification requested1 linked violation
- June 30, 2008State Public Notification requested1 linked violation
- November 20, 2007State Violation/Reminder Notice1 linked violation
- September 26, 2007State Violation/Reminder Notice1 linked violation
- August 22, 2007State Violation/Reminder Notice1 linked violation
- February 21, 2007State Violation/Reminder Notice1 linked violation
- February 5, 2007State Violation/Reminder Notice1 linked violation
- October 6, 2006State Public Notification requested2 linked violations
- August 30, 2006State Public Notification requested1 linked violation
- September 27, 2004State Compliance achieved3 linked violations
- August 27, 2004State Violation/Reminder Notice1 linked violation
- August 27, 2004State Public Notification requested1 linked violation
- August 3, 2004State Public Notification requested1 linked violation
- June 8, 2004State Public Notification requested1 linked violation
- June 8, 2004State Violation/Reminder Notice1 linked violation
- October 2, 2003State Boil Water Order2 linked violations
- October 2, 2003State Administrative/Compliance Order with penalty issued2 linked violations
- September 30, 2003State Compliance achieved1 linked violation
- September 30, 2003State Public Notification received3 linked violations
- September 20, 1995State Administrative/Compliance Order without penalty issued5 linked violations
- October 1, 1994State Compliance achieved1 linked violation
- August 27, 1991State Administrative/Compliance Order without penalty issuedgeneral compliance action — not tied to a specific violation on record
Common questions
Is TIMBERLAND MHC required to publish a Consumer Confidence Report?
- Yes. TIMBERLAND MHC is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is TIMBERLAND MHC’s next Consumer Confidence Report due?
- TIMBERLAND MHC’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does TIMBERLAND MHC have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 item for TIMBERLAND MHC that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
Not on record
Phone not on record