TECUMSEH, OK · Pottawatomie County
BROOKSVILLE Water System
Consumer Confidence Report status
BROOKSVILLE must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 8 items for BROOKSVILLE that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Oklahoma’s official records. Always confirm current status with Oklahoma before making decisions based on this information.
System facts
- System ID (PWSID)
- OK2006363
- System type
- Community Water System
- Population served
- 90
- Service connections
- 44
- Ownership
- local government
- Water source
- groundwater (wells)
BROOKSVILLE is one of 1,277 community water systems in Oklahoma in the 500 or fewer people size category, serving 90 people from groundwater.
As of August 1, 2026, its federal record holds 852 entries between 1993 and 2026, of which 8 remain open; none are health-based.
Of the 852, 783 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, the Radionuclides and Revised Rad Rule, and the Total Coliform Rules.
Violation history
Monitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2026 – February 28, 2026
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2026
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2026 – January 31, 2026
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2025 – December 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
December 1, 2025 – December 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
November 1, 2025 – November 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2025 – November 30, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Heptachlor
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—LASSO
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Atrazine
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Carbofuran
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Simazine
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Endothall
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Diquat
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Dalapon
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—LASSO
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Carbofuran
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Dinoseb
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Picloram
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Simazine
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—OXAMYL
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Endothall
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Diquat
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Dalapon
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Toxaphene
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Methoxychlor
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Endrin
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Chlordane
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—2,4-D
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Heptachlor
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—LASSO
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Atrazine
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Carbofuran
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Dinoseb
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Picloram
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Simazine
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—OXAMYL
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Glyphosate
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Endothall
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Diquat
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Dalapon
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Toxaphene
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Methoxychlor
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Combined Uranium
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Combined Uranium
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Combined Uranium
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—2,4-D
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
October 1, 2025 – December 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2025 – September 30, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
September 1, 2025 – September 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2025 – August 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
August 1, 2025 – August 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2025 – July 31, 2025
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2025
UnaddressedMonitoring, Regular
—ETHYLENE DIBROMIDE
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Heptachlor
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Atrazine
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Picloram
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Simazine
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Endothall
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Dalapon
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Methoxychlor
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Endrin
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Chlordane
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—2,4-D
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Heptachlor
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—LASSO
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Atrazine
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Carbofuran
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Dinoseb
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Picloram
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Simazine
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—OXAMYL
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Glyphosate
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Endothall
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Diquat
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Dalapon
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Toxaphene
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Methoxychlor
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Endrin
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Chlordane
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—2,4-D
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Heptachlor
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—LASSO
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Atrazine
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Carbofuran
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Dinoseb
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Picloram
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Simazine
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—OXAMYL
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Glyphosate
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Endothall
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Diquat
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Dalapon
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Toxaphene
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Methoxychlor
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Endrin
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Combined Uranium
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Combined Uranium
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Combined Uranium
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
June 1, 2025 – June 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Chlordane
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—LASSO
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Atrazine
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Dinoseb
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Simazine
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Endothall
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Diquat
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Dalapon
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Toxaphene
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Methoxychlor
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Endrin
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—2,4-D
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Heptachlor
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—LASSO
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Atrazine
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Carbofuran
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Dinoseb
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Picloram
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Simazine
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—OXAMYL
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Glyphosate
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Endothall
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Diquat
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Dalapon
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Toxaphene
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Methoxychlor
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Endrin
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Chlordane
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—2,4-D
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Heptachlor
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—LASSO
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Atrazine
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Carbofuran
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Dinoseb
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Picloram
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Simazine
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—OXAMYL
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Glyphosate
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Endothall
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Diquat
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Dalapon
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Toxaphene
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Methoxychlor
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Endrin
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Combined Uranium
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Combined Uranium
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Combined Uranium
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – April 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2025 – March 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
February 1, 2025 – February 28, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—2,4-D
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—LASSO
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Atrazine
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Dinoseb
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Picloram
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Simazine
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—OXAMYL
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Glyphosate
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Endothall
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Diquat
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Dalapon
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Toxaphene
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Methoxychlor
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Endrin
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Chlordane
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—2,4-D
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Heptachlor
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—LASSO
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Atrazine
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Carbofuran
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Dinoseb
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Picloram
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Simazine
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—OXAMYL
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Glyphosate
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Endothall
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Diquat
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Dalapon
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Toxaphene
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Methoxychlor
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—BHC-GAMMA
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Endrin
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Chlordane
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Pentachlorophenol
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—2,4,5-TP
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—2,4-D
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Heptachlor epoxide
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Heptachlor
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—LASSO
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Atrazine
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Carbofuran
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2025 – December 31, 2025
ArchivedMonitoring, Regular
—Dinoseb
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Picloram
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Simazine
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—OXAMYL
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Glyphosate
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Endothall
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Diquat
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Dalapon
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Toxaphene
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Methoxychlor
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Endrin
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Combined Uranium
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Combined Uranium
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2025 – December 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2025 – January 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2025 – January 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
December 1, 2024 – December 31, 2024
ArchivedMonitoring and Reporting (DBP)
—Chlorine
November 1, 2024 – November 30, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2024 – November 30, 2024
ArchivedMonitoring, Regular
—Atrazine
October 1, 2024 – December 31, 2024
ArchivedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2024 – October 31, 2024
ArchivedMonitoring, Regular
—Methoxychlor
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Toxaphene
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Dalapon
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Endothall
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Glyphosate
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—OXAMYL
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Picloram
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Dinoseb
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Carbofuran
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—LASSO
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Heptachlor
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Heptachlor epoxide
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—2,4-D
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—2,4,5-TP
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Benzo(a)pyrene
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Pentachlorophenol
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Chlordane
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Endrin
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—BHC-GAMMA
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Methoxychlor
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Toxaphene
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Dalapon
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Diquat
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Endothall
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Glyphosate
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—OXAMYL
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Simazine
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Picloram
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Dinoseb
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Carbofuran
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Atrazine
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—LASSO
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Heptachlor
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Heptachlor epoxide
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—2,4-D
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—2,4,5-TP
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Benzo(a)pyrene
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Pentachlorophenol
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Chlordane
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Endrin
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—BHC-GAMMA
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Methoxychlor
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Toxaphene
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Dalapon
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Diquat
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Endothall
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Glyphosate
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—OXAMYL
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Simazine
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Picloram
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Dinoseb
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Carbofuran
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Atrazine
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—LASSO
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Heptachlor
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Heptachlor epoxide
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—2,4-D
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—2,4,5-TP
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Benzo(a)pyrene
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Pentachlorophenol
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
October 1, 2024 – December 31, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Source Water (GWR)
—E. COLI
September 26, 2024
UnaddressedMonitoring and Reporting (DBP)
—Chlorine
September 1, 2024 – September 30, 2024
ArchivedMonitoring and Reporting (DBP)
—Chlorine
August 1, 2024 – August 31, 2024
ArchivedMonitoring, Regular
—Endothall
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Chlordane
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Pentachlorophenol
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Benzo(a)pyrene
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—2,4,5-TP
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—2,4-D
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Heptachlor epoxide
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Heptachlor
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—LASSO
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Atrazine
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Carbofuran
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Dinoseb
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Picloram
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Simazine
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—OXAMYL
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Glyphosate
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Endothall
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Diquat
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Dalapon
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Toxaphene
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Glyphosate
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—BHC-GAMMA
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Endrin
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Chlordane
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Pentachlorophenol
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Benzo(a)pyrene
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—2,4,5-TP
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—2,4-D
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Heptachlor epoxide
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Heptachlor
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—LASSO
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Atrazine
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Carbofuran
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Dinoseb
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Picloram
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Simazine
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—OXAMYL
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
July 1, 2024 – September 30, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2024 – September 30, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Toxaphene
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Methoxychlor
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—BHC-GAMMA
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Endrin
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Chlordane
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Pentachlorophenol
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Benzo(a)pyrene
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—2,4,5-TP
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—2,4-D
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Heptachlor epoxide
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Heptachlor
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—LASSO
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Atrazine
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Carbofuran
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Dinoseb
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Glyphosate
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Endothall
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Methoxychlor
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Dalapon
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Regular
—Diquat
July 1, 2024 – September 30, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2024 – July 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2024 – July 31, 2024
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2024
UnaddressedMonitoring and Reporting (DBP)
—Chlorine
June 1, 2024 – June 30, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2024 – May 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2024 – April 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2024 – June 30, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2024 – June 30, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2024 – June 30, 2024
ArchivedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2024 – February 29, 2024
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2024 – December 31, 2024
ArchivedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2024 – March 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2024 – January 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2024 – December 31, 2024
ArchivedMonitoring, Source Water (GWR)
—E. COLI
November 15, 2023
UnaddressedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 2, 2023
UnaddressedMonitoring, Regular
—Combined Uranium
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2023 – December 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2023 – December 31, 2023
ArchivedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2023 – December 31, 2023
ArchivedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2023 – December 31, 2023
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2023
UnaddressedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2023 – December 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2023 – September 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2023 – July 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – June 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – April 30, 2023
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2023 – March 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2023 – December 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2023 – December 31, 2025
ArchivedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 2, 2022
UnaddressedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2022 – December 31, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2022 – December 31, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2022 – December 31, 2022
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2022 – June 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2021 – December 31, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2021 – March 31, 2021
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2020 – June 21, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2020 – July 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2020 – June 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2020 – May 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2020 – April 30, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2020 – June 30, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2020 – June 30, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2020 – June 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – March 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2020 – February 29, 2020
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2020 – March 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2020 – March 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2019 – December 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2019 – December 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2019 – December 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2019 – September 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2019 – August 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2019 – September 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2019 – July 31, 2019
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2019 – September 30, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2019 – September 30, 2019
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2019 – September 30, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2019 – September 30, 2019
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2019 – September 30, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2019 – September 30, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2019 – June 30, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2019 – June 30, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2019 – March 31, 2019
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2019 – March 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2019 – January 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2019 – March 31, 2019
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2019 – March 31, 2019
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2019 – March 31, 2019
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2019 – March 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2018 – December 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2018 – November 30, 2018
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2018 – December 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2018 – September 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2018 – August 31, 2018
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2018 – September 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2018 – July 31, 2018
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2018 – September 30, 2018
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2018 – September 30, 2018
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2018 – September 30, 2018
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2018 – September 30, 2018
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2018 – September 30, 2018
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2018 – September 30, 2018
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2018 – September 30, 2018
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2018 – December 16, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2018 – June 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2018 – February 28, 2018
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2018 – March 31, 2018
ResolvedMaximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
December 1, 2017 – December 31, 2017
ArchivedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2017 – December 31, 2017
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2017 – January 18, 2019
ResolvedMonitoring, Source Water (GWR)
—E. COLI
July 29, 2017 – February 27, 2018
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2017 – December 16, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2017 – September 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2017 – June 30, 2017
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2017 – June 30, 2017
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2017 – June 30, 2017
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2017 – June 30, 2017
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2017 – June 30, 2017
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2017 – June 30, 2017
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2017 – June 30, 2017
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2017 – June 30, 2017
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2017 – March 31, 2017
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2017 – March 31, 2017
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2017 – March 31, 2017
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2017 – March 31, 2017
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2017 – March 31, 2017
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2017 – March 31, 2017
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2017 – March 31, 2017
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2016 – December 16, 2021
ResolvedNon-Acute MRDL
Health-basedChlorine
January 1, 2016 – March 31, 2016
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2016 – March 31, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2015 – December 31, 2015
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2015 – December 31, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2015 – October 31, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2015 – September 30, 2015
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2015 – September 30, 2015
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2015 – December 16, 2021
ResolvedMonitoring, Source Water (GWR)
—E. COLI
April 7, 2015 – February 27, 2018
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2014 – December 31, 2014
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2014 – September 30, 2014
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2014 – December 16, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
July 1, 2014 – September 30, 2014
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2014 – June 30, 2014
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2014 – June 30, 2014
ArchivedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Benzene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Benzene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Toluene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Styrene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2014 – December 31, 2019
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2014 – December 31, 2019
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2014 – March 31, 2014
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2014 – March 31, 2014
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2014 – March 31, 2014
ArchivedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2014 – December 31, 2019
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2013 – December 31, 2013
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2013 – December 31, 2013
ArchivedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 2013 – October 31, 2013
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2013 – December 31, 2013
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2013 – September 30, 2013
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2013 – September 30, 2013
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2013 – December 16, 2021
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
July 1, 2013 – July 31, 2013
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2013 – September 30, 2013
ArchivedMonitoring, Source Water (GWR)
—E. COLI
June 1, 2013 – June 30, 2013
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2013 – June 30, 2013
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2013 – June 30, 2013
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2013 – June 30, 2013
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2013 – March 31, 2013
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2013 – March 31, 2013
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2013 – March 31, 2013
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2012 – December 31, 2012
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2012 – December 31, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2012 – December 31, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2012 – December 31, 2012
ArchivedMonitoring, Source Water (GWR)
—E. COLI
August 1, 2012 – August 31, 2012
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
August 1, 2012 – August 31, 2012
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2012 – September 30, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2012 – September 30, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2012 – September 30, 2012
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2012 – December 16, 2021
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2012 – June 30, 2012
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2012 – June 30, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2012 – June 30, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2012 – June 30, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2012 – March 31, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2012 – March 31, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2012 – March 31, 2012
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2011 – December 31, 2011
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2011 – December 31, 2011
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2011 – December 31, 2011
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2011 – September 30, 2011
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2011 – December 16, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2011 – September 30, 2011
ArchivedMonitoring, Regular
—Arsenic
January 1, 2011 – December 31, 2019
ResolvedMonitoring, Regular
—Arsenic
January 1, 2011 – December 31, 2019
ResolvedMonitoring, Regular
—Arsenic
January 1, 2011 – December 31, 2019
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2010 – December 16, 2021
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2010 – January 19, 2011
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
June 1, 2010 – June 30, 2010
ResolvedMonitoring, Source Water (GWR)
—E. COLI
May 1, 2010 – May 21, 2010
ResolvedMonitoring, Repeat Minor (TCR)
—Coliform (TCR)
May 1, 2010 – May 31, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2010 – January 19, 2011
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
November 1, 2009 – November 30, 2009
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 2009 – August 31, 2009
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2009 – December 16, 2021
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
July 1, 2009 – July 31, 2009
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
March 1, 2009 – March 31, 2009
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
July 1, 2008 – September 30, 2008
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2008 – December 16, 2021
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2008 – July 31, 2008
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
April 1, 2008 – June 30, 2008
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2007 – October 31, 2007
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
October 1, 2007 – December 31, 2007
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2007 – December 16, 2021
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2007 – January 31, 2007
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
September 1, 2006 – September 30, 2006
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2006 – December 16, 2021
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
July 1, 2005 – July 31, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2004 – September 30, 2004
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2004 – April 30, 2004
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
April 1, 2004 – June 30, 2004
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
April 1, 2004 – June 30, 2004
ResolvedMonitoring, Regular
—Carbon tetrachloride
April 1, 2004 – June 30, 2004
ResolvedMonitoring, Regular
—Trichloroethylene
April 1, 2004 – June 30, 2004
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
April 1, 2004 – June 30, 2004
ResolvedMonitoring, Regular
—Ethylbenzene
April 1, 2004 – June 30, 2004
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
February 1, 2004 – February 29, 2004
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
January 1, 2004 – January 31, 2004
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
December 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Nitrate
October 1, 2001 – December 31, 2001
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2000 – August 5, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1999 – June 30, 1999
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1999 – April 30, 1999
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
June 1, 1993 – August 4, 2016
Resolved
Archived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yetResolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| February 1, 2026 – February 28, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2026 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| January 1, 2026 – January 31, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2025 – December 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2025 – December 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| November 1, 2025 – November 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| November 1, 2025 – November 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | LASSO | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Simazine | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Endothall | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Diquat | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | LASSO | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Picloram | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Simazine | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Endothall | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Diquat | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Endrin | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Chlordane | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | LASSO | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Picloram | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Simazine | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Endothall | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Diquat | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Gross Beta Particle Activity | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Gross Beta Particle Activity | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Gross Beta Particle Activity | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| October 1, 2025 – December 31, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| September 1, 2025 – September 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2025 – September 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| August 1, 2025 – August 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2025 – August 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| July 1, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Picloram | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Simazine | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Endothall | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Endrin | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Chlordane | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | LASSO | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Picloram | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Simazine | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Endothall | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Diquat | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Endrin | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Chlordane | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | LASSO | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Picloram | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Simazine | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Endothall | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Diquat | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Endrin | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Gross Beta Particle Activity | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Gross Beta Particle Activity | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Gross Beta Particle Activity | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2025 – June 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| June 1, 2025 – June 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Chlordane | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | LASSO | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Simazine | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Endothall | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Diquat | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Endrin | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | LASSO | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Picloram | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Simazine | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Endothall | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Diquat | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Endrin | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Chlordane | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | LASSO | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Picloram | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Simazine | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Endothall | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Diquat | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Endrin | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Gross Beta Particle Activity | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Gross Beta Particle Activity | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Gross Beta Particle Activity | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| April 1, 2025 – April 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2025 – March 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2025 – February 28, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | LASSO | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Picloram | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Simazine | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Endothall | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Diquat | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Endrin | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Chlordane | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | LASSO | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Picloram | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Simazine | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Endothall | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Diquat | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Endrin | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Chlordane | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Heptachlor | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | LASSO | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Atrazine | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Carbofuran | — | Archived |
| January 1, 2025 – December 31, 2025 | Monitoring, Regular | Nitrate-Nitrite | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Dinoseb | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Picloram | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Simazine | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | OXAMYL | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Endothall | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Diquat | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Dalapon | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Toxaphene | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Methoxychlor | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Endrin | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Combined Uranium | — | Archived |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| January 1, 2025 – December 31, 2025 | Monitoring, Regular | Nitrate-Nitrite | — | Archived |
| January 1, 2025 – January 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2025 – January 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| December 1, 2024 – December 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| November 1, 2024 – November 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| November 1, 2024 – November 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Atrazine | — | Archived |
| October 1, 2024 – October 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Methoxychlor | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Toxaphene | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Dalapon | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Endothall | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Glyphosate | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | OXAMYL | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Picloram | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Dinoseb | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Carbofuran | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | LASSO | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4-D | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Chlordane | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Endrin | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Methoxychlor | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Toxaphene | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Dalapon | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Diquat | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Endothall | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Glyphosate | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | OXAMYL | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Simazine | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Picloram | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Dinoseb | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Carbofuran | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Atrazine | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | LASSO | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4-D | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Chlordane | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Endrin | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Methoxychlor | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Toxaphene | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Dalapon | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Diquat | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Endothall | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Glyphosate | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | OXAMYL | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Simazine | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Picloram | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Dinoseb | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Carbofuran | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Atrazine | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | LASSO | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4-D | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| October 1, 2024 – December 31, 2024 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| September 26, 2024 | Monitoring, Source Water (GWR) | E. COLI | — | Unaddressed |
| September 1, 2024 – September 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| August 1, 2024 – August 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Endothall | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Chlordane | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 2,4-D | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Heptachlor | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | LASSO | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Atrazine | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Carbofuran | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Dinoseb | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Picloram | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Simazine | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | OXAMYL | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Glyphosate | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Endothall | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Diquat | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Dalapon | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Toxaphene | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Glyphosate | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Endrin | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Chlordane | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 2,4-D | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Heptachlor | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | LASSO | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Atrazine | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Carbofuran | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Dinoseb | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Picloram | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Simazine | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | OXAMYL | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| July 1, 2024 – September 30, 2024 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2024 – September 30, 2024 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Toxaphene | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Methoxychlor | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Endrin | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Chlordane | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 2,4-D | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Heptachlor | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | LASSO | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Atrazine | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Carbofuran | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Dinoseb | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Glyphosate | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Endothall | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Methoxychlor | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Dalapon | — | Archived |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Diquat | — | Archived |
| July 1, 2024 – July 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2024 – July 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| July 1, 2024 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| June 1, 2024 – June 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| May 1, 2024 – May 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2024 – April 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2024 – June 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| April 1, 2024 – June 30, 2024 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| April 1, 2024 – June 30, 2024 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| February 1, 2024 – February 29, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Nitrate-Nitrite | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| January 1, 2024 – January 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Nitrate-Nitrite | — | Archived |
| November 15, 2023 | Monitoring, Source Water (GWR) | E. COLI | — | Unaddressed |
| October 2, 2023 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Unaddressed |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 1, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2023 – July 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2023 – April 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2023 – December 31, 2025 | Monitoring and Reporting (DBP) | TTHM | — | Archived |
| January 1, 2023 – December 31, 2025 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Archived |
| October 2, 2022 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Unaddressed |
| October 1, 2022 – December 31, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2021 – December 31, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2021 – March 31, 2021 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| October 1, 2020 – June 21, 2021 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2020 – July 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| June 1, 2020 – June 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2020 – May 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2020 – April 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2020 – June 30, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2020 – June 30, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2020 – June 30, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2020 – February 29, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| December 1, 2019 – December 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| September 1, 2019 – September 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2019 – August 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2019 – July 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2019 – June 30, 2019 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| March 1, 2019 – March 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| January 1, 2019 – March 31, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2019 – January 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2019 – March 31, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2019 – March 31, 2019 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2019 – March 31, 2019 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2019 – March 31, 2019 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| December 1, 2018 – December 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2018 – November 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2018 – December 31, 2018 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| September 1, 2018 – September 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2018 – August 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2018 – July 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2018 – September 30, 2018 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2018 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2018 – June 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2018 – February 28, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2018 – March 31, 2018 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2017 – December 31, 2017 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Archived |
| October 1, 2017 – December 31, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2017 – January 18, 2019 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 29, 2017 – February 27, 2018 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| July 1, 2017 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| June 1, 2017 – June 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2017 – March 31, 2017 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| January 1, 2017 – March 31, 2017 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2017 – March 31, 2017 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2017 – March 31, 2017 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2017 – March 31, 2017 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2017 – March 31, 2017 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2017 – March 31, 2017 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2016 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2016 – March 31, 2016 | Non-Acute MRDL | Chlorine | Health-based | Resolved |
| January 1, 2016 – March 31, 2016 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2015 – December 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2015 – December 31, 2015 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2015 – October 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2015 – September 30, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2015 – September 30, 2015 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2015 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| April 7, 2015 – February 27, 2018 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| October 1, 2014 – December 31, 2014 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2014 – September 30, 2014 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2014 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2014 – September 30, 2014 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| April 1, 2014 – June 30, 2014 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| April 1, 2014 – June 30, 2014 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2014 – March 31, 2014 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2014 – March 31, 2014 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2014 – March 31, 2014 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2014 – December 31, 2019 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| October 1, 2013 – December 31, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| October 1, 2013 – December 31, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| October 1, 2013 – October 31, 2013 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2013 – December 31, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2013 – September 30, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2013 – September 30, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2013 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2013 – July 31, 2013 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2013 – September 30, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| June 1, 2013 – June 30, 2013 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| April 1, 2013 – June 30, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| April 1, 2013 – June 30, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| April 1, 2013 – June 30, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2013 – March 31, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2013 – March 31, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2013 – March 31, 2013 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| December 1, 2012 – December 31, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2012 – December 31, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| October 1, 2012 – December 31, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| October 1, 2012 – December 31, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| August 1, 2012 – August 31, 2012 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| August 1, 2012 – August 31, 2012 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2012 – September 30, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2012 – September 30, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2012 – September 30, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2012 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2012 – June 30, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2012 – June 30, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| April 1, 2012 – June 30, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| April 1, 2012 – June 30, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2012 – March 31, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2012 – March 31, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2012 – March 31, 2012 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| October 1, 2011 – December 31, 2011 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| October 1, 2011 – December 31, 2011 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| October 1, 2011 – December 31, 2011 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2011 – September 30, 2011 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| July 1, 2011 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2011 – September 30, 2011 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Archived |
| January 1, 2011 – December 31, 2019 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2011 – December 31, 2019 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2011 – December 31, 2019 | Monitoring, Regular | Arsenic | — | Resolved |
| July 1, 2010 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2010 – January 19, 2011 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| June 1, 2010 – June 30, 2010 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2010 – May 21, 2010 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| May 1, 2010 – May 31, 2010 | Monitoring, Repeat Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2010 – January 19, 2011 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| November 1, 2009 – November 30, 2009 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2009 – August 31, 2009 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2009 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2009 – July 31, 2009 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 2009 – March 31, 2009 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2008 – September 30, 2008 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Resolved |
| July 1, 2008 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2008 – July 31, 2008 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| April 1, 2008 – June 30, 2008 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Resolved |
| January 1, 2008 – March 31, 2008 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Resolved |
| October 1, 2007 – October 31, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2007 – December 31, 2007 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Resolved |
| July 1, 2007 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2007 – January 31, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2006 – September 30, 2006 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2006 – December 16, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2005 – July 31, 2005 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2004 – September 30, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2004 – April 30, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| February 1, 2004 – February 29, 2004 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2004 – January 31, 2004 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| December 1, 2003 – December 31, 2003 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 2001 – December 31, 2001 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2000 – August 5, 2002 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| June 1, 1999 – June 30, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 1999 – April 30, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| June 1, 1993 – August 4, 2016 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
Archived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yetResolved addressed and confirmed by the state
Enforcement actions
- March 23, 2026State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- February 19, 2026State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 19, 2026State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 27, 2026State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- December 31, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 31, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 21, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 21, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- October 15, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 19, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- August 13, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- August 13, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 13, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 3, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- May 6, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- April 9, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- March 25, 2025State Administrative/Compliance Order without penalty issuedgeneral compliance action — not tied to a specific violation on record
- March 6, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- November 22, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 27, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- October 27, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- October 27, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- October 21, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- September 26, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- August 21, 2024State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- August 21, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- August 6, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 17, 2024State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 17, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 3, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 3, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- June 18, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- May 15, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- May 15, 2024State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 15, 2024State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 15, 2024State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- April 18, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- March 28, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- March 6, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 6, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- February 28, 2024State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 23, 2024State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 23, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 5, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- January 5, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- December 15, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- November 30, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 19, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- October 19, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- September 22, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- August 30, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 12, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 6, 2023State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 6, 2023State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- June 21, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 21, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 8, 2023State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- June 8, 2023State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- May 24, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 24, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- May 8, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 8, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- April 26, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- April 26, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- April 4, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 14, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 1, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 18, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 6, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 14, 2022State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 2, 2022State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- January 19, 2022State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 16, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- June 30, 2021State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 30, 2021State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 11, 2020State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 9, 2020State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- September 18, 2020State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- September 18, 2020State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 18, 2020State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 28, 2020State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 28, 2020State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 28, 2020State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 28, 2020State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 28, 2020State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 28, 2020State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 28, 2020State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 28, 2020State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 17, 2020State Violation/Reminder Notice4 linked violations
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- June 17, 2020State Public Notification requested4 linked violations
- June 17, 2020State Violation/Reminder Notice4 linked violations
- June 17, 2020State Public Notification requested4 linked violations
- June 17, 2020State Public Notification requested4 linked violations
- June 17, 2020State Violation/Reminder Notice4 linked violations
- May 8, 2020State Administrative/Compliance Order without penalty issued17 linked violations
- March 6, 2020State Public Notification requested4 linked violations
- March 6, 2020State Public Notification requested1 linked violation
- March 6, 2020State Public Notification requested1 linked violation
- March 6, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Public Notification requested1 linked violation
- March 6, 2020State Public Notification requested21 linked violations
- March 6, 2020State Violation/Reminder Notice21 linked violations
- March 6, 2020State Public Notification requested4 linked violations
- March 6, 2020State Violation/Reminder Notice4 linked violations
- March 6, 2020State Violation/Reminder Notice4 linked violations
- March 6, 2020State Public Notification requested1 linked violation
- March 6, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Public Notification requested1 linked violation
- March 6, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Public Notification requested21 linked violations
- March 6, 2020State Violation/Reminder Notice21 linked violations
- March 6, 2020State Public Notification requested1 linked violation
- March 6, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Public Notification requested1 linked violation
- March 6, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Public Notification requested1 linked violation
- March 6, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Public Notification requested4 linked violations
- March 6, 2020State Violation/Reminder Notice4 linked violations
- January 16, 2020State Public Notification requested1 linked violation
- January 16, 2020State Public Notification requested1 linked violation
- January 16, 2020State Violation/Reminder Notice1 linked violation
- January 16, 2020State Violation/Reminder Notice1 linked violation
- December 17, 2019State Violation/Reminder Notice1 linked violation
- December 17, 2019State Public Notification requested1 linked violation
- December 17, 2019State Public Notification requested1 linked violation
- November 21, 2019State Violation/Reminder Notice2 linked violations
- November 21, 2019State Violation/Reminder Notice1 linked violation
- November 21, 2019State Public Notification requested8 linked violations
- November 21, 2019State Violation/Reminder Notice5 linked violations
- November 21, 2019State Public Notification requested5 linked violations
- November 21, 2019State Violation/Reminder Notice4 linked violations
- November 21, 2019State Public Notification requested4 linked violations
- November 21, 2019State Violation/Reminder Notice4 linked violations
- November 21, 2019State Public Notification requested1 linked violation
- November 21, 2019State Public Notification requested1 linked violation
- November 21, 2019State Violation/Reminder Notice1 linked violation
- November 21, 2019State Public Notification requested1 linked violation
- November 21, 2019State Violation/Reminder Notice1 linked violation
- November 21, 2019State Public Notification requested1 linked violation
- September 26, 2019State Violation/Reminder Notice1 linked violation
- September 26, 2019State Public Notification requested1 linked violation
- September 26, 2019State Violation/Reminder Notice1 linked violation
- September 26, 2019State Public Notification requested1 linked violation
- August 26, 2019State Violation/Reminder Notice1 linked violation
- August 26, 2019State Public Notification requested1 linked violation
- August 26, 2019State Violation/Reminder Notice1 linked violation
- August 26, 2019State Public Notification requested4 linked violations
- August 26, 2019State Violation/Reminder Notice4 linked violations
- August 26, 2019State Public Notification requested4 linked violations
- August 26, 2019State Violation/Reminder Notice4 linked violations
- August 26, 2019State Public Notification requested4 linked violations
- August 26, 2019State Violation/Reminder Notice4 linked violations
- August 26, 2019State Public Notification requested1 linked violation
- July 18, 2019State Violation/Reminder Notice1 linked violation
- July 18, 2019State Public Notification requested1 linked violation
- July 18, 2019State Violation/Reminder Notice1 linked violation
- July 18, 2019State Public Notification requested1 linked violation
- July 18, 2019State Violation/Reminder Notice1 linked violation
- July 18, 2019State Public Notification requested1 linked violation
- July 18, 2019State Violation/Reminder Notice1 linked violation
- July 18, 2019State Public Notification requested1 linked violation
- May 31, 2019State Public Notification requested4 linked violations
- May 31, 2019State Violation/Reminder Notice4 linked violations
- May 31, 2019State Public Notification requested4 linked violations
- May 31, 2019State Violation/Reminder Notice4 linked violations
- May 31, 2019State Public Notification requested4 linked violations
- May 31, 2019State Violation/Reminder Notice4 linked violations
- May 31, 2019State Public Notification requested1 linked violation
- May 31, 2019State Violation/Reminder Notice1 linked violation
- May 31, 2019State Public Notification requested1 linked violation
- May 31, 2019State Violation/Reminder Notice1 linked violation
- April 16, 2019State Public Notification requested1 linked violation
- April 16, 2019State Violation/Reminder Notice1 linked violation
- April 16, 2019State Violation/Reminder Notice1 linked violation
- April 16, 2019State Public Notification requested1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received4 linked violations
- April 11, 2019State Public Notification received4 linked violations
- April 11, 2019State Public Notification received4 linked violations
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received3 linked violations
- April 11, 2019State Public Notification received2 linked violations
- April 11, 2019State Public Notification received2 linked violations
- April 11, 2019State Public Notification received2 linked violations
- April 11, 2019State Public Notification received2 linked violations
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- April 11, 2019State Public Notification received2 linked violations
- April 11, 2019State Public Notification received5 linked violations
- April 11, 2019State Public Notification received5 linked violations
- April 11, 2019State Public Notification received4 linked violations
- April 11, 2019State Public Notification received4 linked violations
- April 11, 2019State Public Notification received5 linked violations
- April 11, 2019State Public Notification received4 linked violations
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received2 linked violations
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received2 linked violations
- April 11, 2019State Public Notification received2 linked violations
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- April 11, 2019State Public Notification received1 linked violation
- March 18, 2019State Public Notification requested1 linked violation
- March 18, 2019State Violation/Reminder Notice1 linked violation
- March 18, 2019State Public Notification requested1 linked violation
- March 18, 2019State Violation/Reminder Notice1 linked violation
- March 5, 2019State Violation/Reminder Notice3 linked violations
- March 5, 2019State Public Notification requested4 linked violations
- February 25, 2019State Public Notification requested1 linked violation
- February 25, 2019State Public Notification requested1 linked violation
- February 25, 2019State Violation/Reminder Notice1 linked violation
- February 25, 2019State Violation/Reminder Notice1 linked violation
- January 18, 2019State Compliance achieved1 linked violation
- January 18, 2019State Public Notification requested1 linked violation
- January 18, 2019State Violation/Reminder Notice1 linked violation
- January 18, 2019State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 18, 2019State Compliance achieved1 linked violation
- January 18, 2019State Compliance achieved1 linked violation
- January 18, 2019State Compliance achieved1 linked violation
- January 18, 2019State Compliance achieved1 linked violation
- December 14, 2018State Public Notification requested1 linked violation
- December 14, 2018State Public Notification requested1 linked violation
- December 14, 2018State Violation/Reminder Notice1 linked violation
- December 14, 2018State Violation/Reminder Notice1 linked violation
- November 15, 2018State Violation/Reminder Notice1 linked violation
- November 15, 2018State Public Notification requested4 linked violations
- November 15, 2018State Violation/Reminder Notice4 linked violations
- November 15, 2018State Public Notification requested4 linked violations
- November 15, 2018State Violation/Reminder Notice4 linked violations
- November 15, 2018State Public Notification requested4 linked violations
- November 15, 2018State Violation/Reminder Notice4 linked violations
- November 15, 2018State Public Notification requested1 linked violation
- November 15, 2018State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 15, 2018State Violation/Reminder Notice1 linked violation
- October 15, 2018State Public Notification requested1 linked violation
- October 15, 2018State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- September 14, 2018State Public Notification requested1 linked violation
- September 14, 2018State Public Notification requested1 linked violation
- September 14, 2018State Violation/Reminder Notice1 linked violation
- September 14, 2018State Violation/Reminder Notice1 linked violation
- August 14, 2018State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- August 14, 2018State Public Notification requested1 linked violation
- August 14, 2018State Violation/Reminder Notice1 linked violation
- July 16, 2018State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 14, 2018State Public Notification requested1 linked violation
- June 14, 2018State Violation/Reminder Notice1 linked violation
- June 14, 2018State Public Notification requested1 linked violation
- June 14, 2018State Violation/Reminder Notice3 linked violations
- June 14, 2018State Violation/Reminder Notice1 linked violation
- June 14, 2018State Public Notification requested1 linked violation
- June 14, 2018State Violation/Reminder Notice1 linked violation
- June 14, 2018State Public Notification requested1 linked violation
- June 14, 2018State Violation/Reminder Notice1 linked violation
- June 14, 2018State Public Notification requested1 linked violation
- March 1, 2018State Compliance achieved5 linked violations
- March 1, 2018State Compliance achieved5 linked violations
- March 1, 2018State Compliance achieved5 linked violations
- February 27, 2018State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- February 27, 2018State Compliance achieved2 linked violations
- February 27, 2018State Compliance achieved2 linked violations
- February 27, 2018State Compliance achieved2 linked violations
- February 13, 2018State Public Notification requested1 linked violation
- January 12, 2018State Violation/Reminder Notice2 linked violations
- December 23, 2017State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- December 23, 2017State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- December 14, 2017State Public Notification requested1 linked violation
- December 14, 2017State Public Notification requested6 linked violations
- November 14, 2017State Compliance achieved2 linked violations
- November 14, 2017State Compliance achieved1 linked violation
- November 14, 2017State Compliance achieved3 linked violations
- November 13, 2017State Violation/Reminder Notice1 linked violation
- November 13, 2017State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 13, 2017State Public Notification requested2 linked violations
- October 17, 2017State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- September 21, 2017State Public Notification requested1 linked violation
- September 21, 2017State Violation/Reminder Notice1 linked violation
- August 18, 2017State Public Notification requested5 linked violations
- August 18, 2017State Violation/Reminder Notice4 linked violations
- August 18, 2017State Public Notification requested4 linked violations
- August 18, 2017State Violation/Reminder Notice4 linked violations
- August 18, 2017State Public Notification requested1 linked violation
- August 18, 2017State Violation/Reminder Notice1 linked violation
- August 18, 2017State Public Notification requested1 linked violation
- August 18, 2017State Violation/Reminder Notice1 linked violation
- August 18, 2017State Public Notification requested5 linked violations
- July 17, 2017State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 17, 2017State Violation/Reminder Notice2 linked violations
- July 17, 2017State Violation/Reminder Notice3 linked violations
- July 17, 2017State Public Notification requested1 linked violation
- July 17, 2017State Violation/Reminder Notice1 linked violation
- July 17, 2017State Public Notification requested1 linked violation
- July 17, 2017State Violation/Reminder Notice1 linked violation
- July 17, 2017State Public Notification requested1 linked violation
- July 17, 2017State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 17, 2017State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 17, 2017State Public Notification requested4 linked violations
- July 17, 2017State Violation/Reminder Notice4 linked violations
- July 17, 2017State Public Notification requested4 linked violations
- July 17, 2017State Violation/Reminder Notice4 linked violations
- July 17, 2017State Public Notification requested4 linked violations
- July 17, 2017State Violation/Reminder Notice4 linked violations
- January 3, 2017State Violation/Reminder Notice2 linked violations
- September 1, 2016State Compliance achieved4 linked violations
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved7 linked violations
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- June 10, 2016State Public Notification requested2 linked violations
- March 18, 2016State Public Notification requested2 linked violations
- March 15, 2016State Public Notification requested2 linked violations
- February 18, 2016State Public Notification requested1 linked violation
- January 6, 2016State Public Notification requested1 linked violation
- December 8, 2015State Violation/Reminder Notice2 linked violations
- December 8, 2015State Public Notification requested71 linked violations
- November 13, 2015State Public Notification requested2 linked violations
- November 6, 2015State Public Notification requested2 linked violations
- September 30, 2015State Violation/Reminder Notice39 linked violations
- March 25, 2015Federal Compliance achieved1 linked violation
- January 14, 2015State Violation/Reminder Notice1 linked violation
- June 26, 2014State Public Notification requested13 linked violations
- June 26, 2014State Violation/Reminder Notice13 linked violations
- December 18, 2013State Violation/Reminder Notice4 linked violations
- November 15, 2013State Administrative/Compliance Order with penalty issued42 linked violations
- October 31, 2013State Compliance achieved4 linked violations
- July 15, 2013State Public Notification requested10 linked violations
- July 15, 2013State Administrative/Compliance Order with penalty issued10 linked violations
- September 12, 2012Federal Compliance achieved1 linked violation
- May 21, 2010Federal Compliance achieved1 linked violation
- March 3, 2010State Violation/Reminder Notice2 linked violations
- January 27, 2010State Public Notification requested3 linked violations
- April 24, 2009State Compliance achieved1 linked violation
- April 24, 2009State Public Notification requested7 linked violations
- February 24, 2009State Public Notification received7 linked violations
- February 12, 2009State Public Notification requested7 linked violations
- August 25, 2008State Violation/Reminder Notice2 linked violations
- August 1, 2008State Compliance achieved7 linked violations
- November 20, 2007State Public Notification requested4 linked violations
- October 18, 2007State Compliance achieved3 linked violations
- February 21, 2007State Violation/Reminder Notice5 linked violations
- October 24, 2006State Public Notification received4 linked violations
- October 12, 2006State Violation/Reminder Notice1 linked violation
- October 12, 2006State Violation/Reminder Notice2 linked violations
- January 10, 2006State Compliance achieved20 linked violations
- October 18, 2005Federal Compliance achieved1 linked violation
- October 1, 2005State Compliance achieved6 linked violations
- September 20, 2005State Public Notification requested2 linked violations
- September 20, 2005State Violation/Reminder Notice3 linked violations
- March 28, 2005State Public Notification received21 linked violations
- March 15, 2005State Public Notification requested2 linked violations
- November 12, 2004State Public Notification requested3 linked violations
- October 13, 2004State Public Notification requested23 linked violations
- February 23, 2004State Violation/Reminder Notice3 linked violations
- January 21, 2004State Violation/Reminder Notice3 linked violations
- January 21, 2004State Violation/Reminder Notice2 linked violations
- October 6, 2003State Violation/Reminder Notice2 linked violations
- September 5, 2003State Violation/Reminder Notice2 linked violations
- August 5, 2002State Compliance achieved26 linked violations
- March 27, 2002State Compliance achieved2 linked violations
- August 28, 1997State Administrative/Compliance Order without penalty issued1 linked violation
- October 19, 1995State Administrative/Compliance Order without penalty issued2 linked violations
- October 10, 1994State Administrative/Compliance Order without penalty issued4 linked violations
- July 18, 1991State Administrative/Compliance Order without penalty issuedgeneral compliance action — not tied to a specific violation on record
- September 30, 1986State Administrative/Compliance Order without penalty issued16 linked violations
Common questions
Is BROOKSVILLE required to publish a Consumer Confidence Report?
- Yes. BROOKSVILLE is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is BROOKSVILLE’s next Consumer Confidence Report due?
- BROOKSVILLE’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does BROOKSVILLE have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 8 items for BROOKSVILLE that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
BROOKSVILLE
405-598-3497
TECUMSEH, OK 74873