BOISE, OK · Grady County
SKYVIEW MOBILE HOME PARK Water System
Current status
1 open health-based violation on record as of July 4, 2026, alongside 4 other open item(s). See the violation history below for contaminant and status details.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Oklahoma’s official records. Always confirm current status with Oklahoma before making decisions based on this information.
System facts
- System ID (PWSID)
- OK2002601
- System type
- Community Water System
- Population served
- 24
- Service connections
- 20
- Ownership
- privately owned
- Water source
- groundwater (wells)
Violation history
Monitoring and Reporting (DBP)
—Chlorine
November 1, 2025 – November 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2025 – November 30, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2025 – October 31, 2025
ArchivedMonitoring, Source Water (GWR)
—E. COLI
September 10, 2025
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2025 – September 30, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
September 1, 2025 – September 30, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
August 1, 2025 – August 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2025 – July 31, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025
UnaddressedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2025
UnaddressedMonitoring, Regular
—Glyphosate
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Regular
—2,4-D
July 1, 2025 – September 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2025 – June 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
June 1, 2025 – June 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2025 – May 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
May 1, 2025 – May 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2025 – April 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2025 – March 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
March 1, 2025 – March 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2025 – February 28, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
February 1, 2025 – February 28, 2025
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2025 – March 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2025 – January 31, 2025
ResolvedMonitoring, Regular
—2,4-D
January 1, 2025 – March 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2025 – January 31, 2025
ResolvedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024
UnaddressedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2024 – October 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2024 – October 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2024 – September 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
September 1, 2024 – September 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
August 1, 2024 – August 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2024 – August 31, 2024
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – July 24, 2024
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2024 – January 29, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2024 – June 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
June 1, 2024 – June 30, 2024
ResolvedMonitoring, Regular
—Diquat
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Chlordane
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Benzo(a)pyrene
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Heptachlor epoxide
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Heptachlor
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Carbofuran
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—OXAMYL
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Glyphosate
April 1, 2024 – June 30, 2024
ResolvedMonitoring, Regular
—Endothall
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Toxaphene
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Methoxychlor
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—BHC-GAMMA
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Regular
—Endrin
April 1, 2024 – June 30, 2024
ArchivedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Chlordane
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Pentachlorophenol
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—2,4,5-TP
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—2,4-D
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Heptachlor epoxide
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Heptachlor
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—LASSO
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Atrazine
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Carbofuran
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Dinoseb
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Picloram
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Glyphosate
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Methoxychlor
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—BHC-GAMMA
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Regular
—Endrin
January 1, 2024 – March 31, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2024 – January 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2023 – August 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2023 – July 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2023 – September 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2023 – September 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2023 – September 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2023 – May 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – June 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – June 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – March 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2023 – February 28, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2023 – January 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2023 – December 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – November 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2022 – December 31, 2022
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2022 – January 29, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2022 – September 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2022 – September 30, 2022
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2022 – December 31, 2024
ArchivedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2022 – December 31, 2024
ArchivedMonitoring, Source Water (GWR)
—E. COLI
April 2, 2021 – December 20, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2020 – March 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2019 – December 19, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2019 – September 30, 2019
ResolvedMonitoring, Source Water (GWR)
—E. COLI
April 13, 2019 – September 28, 2020
ResolvedMonitoring, Source Water (GWR)
—E. COLI
August 15, 2018 – November 21, 2018
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Styrene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Ethylbenzene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Toluene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Benzene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—CHLOROBENZENE
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Tetrachloroethylene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Trichloroethylene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Carbon tetrachloride
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Vinyl chloride
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Xylenes, Total
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2017 – December 31, 2022
ArchivedMonitoring, Regular
—Styrene
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Toluene
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Benzene
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Arsenic
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2013 – December 31, 2013
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2012 – October 9, 2015
ResolvedMonitoring, Source Water (GWR)
—E. COLI
August 1, 2011 – August 31, 2011
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
January 1, 2011 – January 31, 2011
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
December 1, 2010 – December 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2010 – August 31, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2010 – August 11, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2009 – September 30, 2009
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
July 1, 2009 – July 31, 2009
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
June 1, 2009 – June 30, 2009
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 2008 – November 30, 2008
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 2008 – October 31, 2008
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
September 1, 2008 – September 30, 2008
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
August 1, 2008 – August 31, 2008
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
August 1, 2008 – August 31, 2008
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2007 – September 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2007 – January 31, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2006 – May 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2003 – April 30, 2003
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1994 – February 28, 1994
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
May 1, 1993 – May 31, 1993
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
September 1, 1991 – September 30, 1991
Resolved
Archived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yetResolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| November 1, 2025 – November 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| November 1, 2025 – November 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2025 – October 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| September 10, 2025 | Monitoring, Source Water (GWR) | E. COLI | — | Unaddressed |
| September 1, 2025 – September 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2025 – September 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| August 1, 2025 – August 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Unaddressed |
| July 1, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | Glyphosate | — | Archived |
| July 1, 2025 – September 30, 2025 | Monitoring, Regular | 2,4-D | — | Archived |
| June 1, 2025 – June 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2025 – June 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2025 – January 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2025 – January 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 17, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Unaddressed |
| October 17, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Unaddressed |
| October 1, 2024 – October 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2024 – October 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| September 1, 2024 – September 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2024 – September 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2024 – July 24, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2024 – January 29, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| June 1, 2024 – June 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2024 – June 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Diquat | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Chlordane | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Heptachlor | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Carbofuran | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | OXAMYL | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Glyphosate | — | Resolved |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Endothall | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Toxaphene | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Methoxychlor | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| April 1, 2024 – June 30, 2024 | Monitoring, Regular | Endrin | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Chlordane | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Pentachlorophenol | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Benzo(a)pyrene | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | HEXACHLOROBENZENE | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | 2,4,5-TP | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | 2,4-D | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Heptachlor epoxide | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Heptachlor | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | LASSO | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Atrazine | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Carbofuran | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Dinoseb | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Picloram | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Glyphosate | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Methoxychlor | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | BHC-GAMMA | — | Archived |
| January 1, 2024 – March 31, 2024 | Monitoring, Regular | Endrin | — | Archived |
| January 1, 2024 – January 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| September 1, 2023 – September 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2023 – August 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2023 – July 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| June 1, 2023 – June 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2023 – May 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2023 – February 28, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2023 – January 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2023 – December 31, 2023 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| November 1, 2022 – November 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2022 – January 29, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2022 – September 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2022 – December 31, 2024 | Monitoring and Reporting (DBP) | TTHM | — | Archived |
| January 1, 2022 – December 31, 2024 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Archived |
| April 2, 2021 – December 20, 2021 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2019 – December 19, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 13, 2019 – September 28, 2020 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| August 15, 2018 – November 21, 2018 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | o-Dichlorobenzene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | Styrene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | Ethylbenzene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | Toluene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | Benzene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | CHLOROBENZENE | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | Tetrachloroethylene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | Trichloroethylene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloropropane | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | Carbon tetrachloride | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloroethane | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | 1,1-Dichloroethylene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | Vinyl chloride | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | p-Dichlorobenzene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | DICHLOROMETHANE | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | Xylenes, Total | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Archived |
| January 1, 2017 – December 31, 2022 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Archived |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2013 – December 31, 2013 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| July 1, 2012 – October 9, 2015 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| August 1, 2011 – August 31, 2011 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| January 1, 2011 – January 31, 2011 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2010 – December 31, 2010 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2010 – August 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2010 – August 11, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2009 – September 30, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2009 – July 31, 2009 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2009 – June 30, 2009 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| November 1, 2008 – November 30, 2008 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2008 – October 31, 2008 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2008 – September 30, 2008 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2008 – August 31, 2008 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| August 1, 2008 – August 31, 2008 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2007 – September 30, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2007 – January 31, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2006 – May 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2003 – April 30, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 1994 – February 28, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 1993 – May 31, 1993 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 1991 – September 30, 1991 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
Archived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yetResolved addressed and confirmed by the state
Enforcement actions
- December 31, 2025State Public Notification requested4 linked violations
- November 21, 2025State Public Notification requested5 linked violations
- November 21, 2025State Violation/Reminder Notice26 linked violations
- October 15, 2025State Violation/Reminder Notice4 linked violations
- October 15, 2025State Public Notification requested4 linked violations
- October 8, 2025State Compliance achieved2 linked violations
- October 8, 2025State Compliance achieved2 linked violations
- October 8, 2025State Compliance achieved1 linked violation
- August 13, 2025State Public Notification requested5 linked violations
- July 23, 2025State Public Notification requested4 linked violations
- July 11, 2025State Violation/Reminder Notice4 linked violations
- June 27, 2025State Public Notification requested4 linked violations
- June 9, 2025State Compliance achieved4 linked violations
- June 3, 2025State Violation/Reminder Notice7 linked violations
- June 3, 2025State Public Notification requested7 linked violations
- May 6, 2025State Public Notification requested5 linked violations
- April 9, 2025State Public Notification requested5 linked violations
- April 9, 2025State Public Notification requested5 linked violations
- December 23, 2024State Compliance achieved4 linked violations
- December 23, 2024State Compliance achieved3 linked violations
- November 22, 2024State Violation/Reminder Notice7 linked violations
- October 21, 2024State Violation/Reminder Notice5 linked violations
- August 21, 2024State Public Notification requested21 linked violations
- August 21, 2024State Violation/Reminder Notice21 linked violations
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- August 9, 2024State Public Notification received1 linked violation
- July 24, 2024State Compliance achieved1 linked violation
- July 12, 2024State Violation/Reminder Notice1 linked violation
- May 15, 2024State Violation/Reminder Notice29 linked violations
- May 15, 2024State Public Notification requested29 linked violations
- April 3, 2024State Compliance achieved1 linked violation
- April 3, 2024State Compliance achieved1 linked violation
- March 28, 2024State Public Notification requested2 linked violations
- March 28, 2024State Violation/Reminder Notice2 linked violations
- February 28, 2024State Public Notification requested1 linked violation
- February 28, 2024State Violation/Reminder Notice1 linked violation
- February 23, 2024State Compliance achieved1 linked violation
- February 23, 2024State Compliance achieved1 linked violation
- January 23, 2024State Public Notification requested1 linked violation
- January 23, 2024State Violation/Reminder Notice1 linked violation
- January 23, 2024State Violation/Reminder Notice2 linked violations
- January 12, 2024State Compliance achieved2 linked violations
- January 12, 2024State Compliance achieved2 linked violations
- January 12, 2024State Compliance achieved1 linked violation
- January 12, 2024State Compliance achieved1 linked violation
- January 12, 2024State Compliance achieved3 linked violations
- January 12, 2024State Compliance achieved3 linked violations
- January 12, 2024State Compliance achieved3 linked violations
- January 12, 2024State Compliance achieved3 linked violations
- January 12, 2024State Compliance achieved3 linked violations
- January 12, 2024State Compliance achieved2 linked violations
- December 15, 2023State Public Notification requested2 linked violations
- December 15, 2023State Public Notification requested2 linked violations
- November 30, 2023State Public Notification requested2 linked violations
- November 30, 2023State Public Notification requested2 linked violations
- November 30, 2023State Violation/Reminder Notice2 linked violations
- October 19, 2023State Violation/Reminder Notice2 linked violations
- October 19, 2023State Violation/Reminder Notice2 linked violations
- September 27, 2023State Public Notification received2 linked violations
- September 27, 2023State Public Notification received4 linked violations
- September 27, 2023State Public Notification received22 linked violations
- September 27, 2023State Public Notification received1 linked violation
- September 27, 2023State Public Notification received2 linked violations
- September 22, 2023State Public Notification requested1 linked violation
- July 21, 2023State Public Notification requested3 linked violations
- June 21, 2023State Violation/Reminder Notice4 linked violations
- June 21, 2023State Public Notification requested2 linked violations
- May 24, 2023State Public Notification requested3 linked violations
- May 24, 2023State Public Notification requested4 linked violations
- April 26, 2023State Violation/Reminder Notice2 linked violations
- April 26, 2023State Violation/Reminder Notice3 linked violations
- April 4, 2023State Violation/Reminder Notice2 linked violations
- April 4, 2023State Violation/Reminder Notice2 linked violations
- March 14, 2023State Violation/Reminder Notice21 linked violations
- March 14, 2023State Public Notification requested22 linked violations
- February 8, 2023State Compliance achieved4 linked violations
- February 1, 2023State Public Notification requested1 linked violation
- February 1, 2023State Violation/Reminder Notice3 linked violations
- May 14, 2022State Public Notification received1 linked violation
- June 17, 2021State Public Notification received2 linked violations
- May 14, 2021State Public Notification requested3 linked violations
- November 20, 2020State Public Notification received11 linked violations
- September 28, 2020State Compliance achieved2 linked violations
- July 7, 2020State Compliance achieved2 linked violations
- June 17, 2020State Public Notification requested2 linked violations
- December 19, 2019State Compliance achieved2 linked violations
- December 3, 2019State Compliance achieved3 linked violations
- November 21, 2019State Violation/Reminder Notice2 linked violations
- May 31, 2019State Violation/Reminder Notice2 linked violations
- November 21, 2018State Compliance achieved2 linked violations
- October 15, 2018State Public Notification requested2 linked violations
- April 20, 2017State Public Notification requested2 linked violations
- April 20, 2017State Violation/Reminder Notice1 linked violation
- August 4, 2016State Compliance achieved2 linked violations
- August 4, 2016State Compliance achieved3 linked violations
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved2 linked violations
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved6 linked violations
- August 4, 2016State Compliance achieved2 linked violations
- August 4, 2016State Compliance achieved5 linked violations
- August 4, 2016State Compliance achieved5 linked violations
- August 4, 2016State Compliance achieved2 linked violations
- August 4, 2016State Compliance achieved3 linked violations
- October 9, 2015State Compliance achieved2 linked violations
- October 6, 2015State Violation/Reminder Notice1 linked violation
- September 21, 2015State Public Notification received21 linked violations
- August 11, 2015State Compliance achieved21 linked violations
- August 11, 2015State Compliance achieved1 linked violation
- July 7, 2015State Violation/Reminder Notice21 linked violations
- July 7, 2015State Public Notification requested21 linked violations
- March 24, 2014State Public Notification received1 linked violation
- February 14, 2014State Violation/Reminder Notice1 linked violation
- February 14, 2014State Public Notification requested1 linked violation
- October 6, 2011Federal Compliance achieved1 linked violation
- August 11, 2010State Compliance achieved1 linked violation
- February 9, 2010State Public Notification received1 linked violation
- January 27, 2010State Violation/Reminder Notice1 linked violation
- January 27, 2010State Public Notification requested1 linked violation
- December 14, 2009State Public Notification requested1 linked violation
- December 14, 2009State Violation/Reminder Notice1 linked violation
- November 23, 2009State Violation/Reminder Notice1 linked violation
- November 23, 2009State Public Notification requested1 linked violation
- September 24, 2009State Violation/Reminder Notice1 linked violation
- September 24, 2009State Public Notification requested1 linked violation
- September 24, 2009State Violation/Reminder Notice1 linked violation
- September 24, 2009State Violation/Reminder Notice1 linked violation
- September 24, 2009State Public Notification requested1 linked violation
- September 24, 2009State Public Notification requested1 linked violation
- May 26, 2009State Public Notification received1 linked violation
- May 26, 2009State Public Notification received1 linked violation
- May 26, 2009State Public Notification received1 linked violation
- May 26, 2009State Public Notification received1 linked violation
- May 26, 2009State Public Notification received1 linked violation
- May 26, 2009State Public Notification received1 linked violation
- May 26, 2009State Public Notification received1 linked violation
- January 20, 2009State Violation/Reminder Notice1 linked violation
- January 20, 2009State Public Notification requested1 linked violation
- December 1, 2008State Compliance achieved5 linked violations
- November 21, 2008State Violation/Reminder Notice1 linked violation
- November 21, 2008State Public Notification requested1 linked violation
- October 27, 2008State Public Notification requested1 linked violation
- October 27, 2008State Violation/Reminder Notice1 linked violation
- October 8, 2008State Violation/Reminder Notice2 linked violations
- October 8, 2008State Public Notification requested1 linked violation
- May 26, 2008State Public Notification received1 linked violation
- March 18, 2008State Compliance achieved2 linked violations
- October 22, 2007State Public Notification requested3 linked violations
- October 22, 2007State Violation/Reminder Notice3 linked violations
- April 16, 2007State Compliance achieved2 linked violations
- April 16, 2007State Public Notification received1 linked violation
- February 21, 2007State Public Notification requested1 linked violation
- February 5, 2007State Public Notification requested3 linked violations
- February 5, 2007State Violation/Reminder Notice2 linked violations
- June 20, 2006State Violation/Reminder Notice3 linked violations
- August 28, 2003State Public Notification requested2 linked violations
- August 28, 2003State Violation/Reminder Notice1 linked violation
- August 20, 2003State Public Notification received5 linked violations
- August 20, 2003State Compliance achieved2 linked violations
- August 27, 1991State Administrative/Compliance Order without penalty issuedgeneral compliance action — not tied to a specific violation on record
Contact
SKYVIEW TP
240-419-8782
BOISE, ID 83701