WELCH, OK · Craig County
CRAIG CO RWS & SWMD #3 Water System
Current status
No open violations on record as of July 4, 2026.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Oklahoma’s official records. Always confirm current status with Oklahoma before making decisions based on this information.
System facts
- System ID (PWSID)
- OK2001807
- System type
- Community Water System
- Population served
- 1,100
- Service connections
- 613
- Ownership
- local government
- Water source
- groundwater (wells)
Violation history
Maximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
December 1, 2024 – December 31, 2024
ResolvedMaximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
November 1, 2024 – November 30, 2024
ResolvedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024 – July 15, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – July 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2024 – March 31, 2024
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2022 – March 31, 2022
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2022 – March 31, 2022
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2022 – March 31, 2022
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2022 – March 31, 2022
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2021 – September 30, 2021
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2021 – September 30, 2021
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2021 – September 30, 2021
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2021 – September 30, 2021
ResolvedMonitoring, Regular
—Trichloroethylene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Xylenes, Total
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—DICHLOROMETHANE
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—o-Dichlorobenzene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—p-Dichlorobenzene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Vinyl chloride
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—1,2-Dichloroethane
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Carbon tetrachloride
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—1,2-Dichloropropane
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Tetrachloroethylene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—CHLOROBENZENE
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Benzene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Toluene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Ethylbenzene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Styrene
April 1, 2016 – June 30, 2016
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2016 – March 31, 2016
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2016 – March 31, 2016
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2016 – March 31, 2016
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2016 – March 31, 2016
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2014 – April 13, 2015
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 2013 – November 30, 2013
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
November 1, 2013 – November 30, 2013
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2013 – April 13, 2015
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
February 1, 2013 – February 28, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2013 – February 28, 2013
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
January 1, 2013 – January 31, 2013
ResolvedMonitoring, Source Water (GWR)
—E. COLI
January 1, 2013 – January 31, 2013
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
January 1, 2013 – January 31, 2013
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2013 – December 31, 2013
ResolvedMonitoring, Source Water (GWR)
—E. COLI
November 1, 2012 – November 30, 2012
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
November 1, 2012 – November 30, 2012
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2012 – April 13, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2001 – September 30, 2001
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2000 – January 30, 2002
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2000 – January 30, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1998 – July 31, 1998
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1996 – December 31, 2001
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1996 – December 31, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1995 – December 31, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1995 – January 31, 1995
Resolved
Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| December 1, 2024 – December 31, 2024 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| November 1, 2024 – November 30, 2024 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| October 17, 2024 – July 15, 2025 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Resolved |
| July 1, 2024 – July 30, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| March 1, 2024 – March 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2022 – March 31, 2022 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2022 – March 31, 2022 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2022 – March 31, 2022 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2022 – March 31, 2022 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2021 – September 30, 2021 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2021 – September 30, 2021 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2021 – September 30, 2021 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2021 – September 30, 2021 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Benzene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Toluene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| April 1, 2016 – June 30, 2016 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2016 – March 31, 2016 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2016 – March 31, 2016 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2016 – March 31, 2016 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2016 – March 31, 2016 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2014 – April 13, 2015 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| November 1, 2013 – November 30, 2013 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2013 – November 30, 2013 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2013 – April 13, 2015 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| February 1, 2013 – February 28, 2013 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2013 – February 28, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2013 – January 31, 2013 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 2013 – January 31, 2013 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| January 1, 2013 – January 31, 2013 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2013 – December 31, 2013 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| November 1, 2012 – November 30, 2012 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| November 1, 2012 – November 30, 2012 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2012 – April 13, 2015 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| September 1, 2001 – September 30, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2000 – January 30, 2002 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2000 – January 30, 2002 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 1998 – July 31, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1996 – December 31, 2001 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1996 – December 31, 2001 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| December 1, 1995 – December 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1995 – January 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Resolved addressed and confirmed by the state
Enforcement actions
- July 11, 2025State Violation/Reminder Notice5 linked violations
- December 4, 2024State Boil Water Order3 linked violations
- December 4, 2024State Public Notification received3 linked violations
- July 30, 2024State Compliance achieved1 linked violation
- May 31, 2024State Compliance achieved2 linked violations
- July 31, 2023State Compliance achieved4 linked violations
- May 24, 2023State Public Notification requested4 linked violations
- August 30, 2022State Public Notification received4 linked violations
- August 30, 2022State Public Notification received4 linked violations
- May 25, 2022State Violation/Reminder Notice4 linked violations
- May 25, 2022State Public Notification requested5 linked violations
- July 3, 2018State Compliance achieved2 linked violations
- November 2, 2017State Compliance achieved4 linked violations
- September 30, 2016State Public Notification received4 linked violations
- September 30, 2016State Public Notification received5 linked violations
- September 30, 2016State Public Notification received21 linked violations
- September 15, 2016State Public Notification requested22 linked violations
- September 15, 2016State Public Notification requested5 linked violations
- September 15, 2016State Violation/Reminder Notice4 linked violations
- September 15, 2016State Public Notification requested5 linked violations
- August 4, 2016State Compliance achieved2 linked violations
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved3 linked violations
- August 4, 2016State Compliance achieved3 linked violations
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved2 linked violations
- August 4, 2016State Compliance achieved2 linked violations
- August 4, 2016State Compliance achieved4 linked violations
- August 4, 2016State Compliance achieved3 linked violations
- August 4, 2016State Compliance achieved1 linked violation
- August 4, 2016State Compliance achieved3 linked violations
- August 4, 2016State Compliance achieved2 linked violations
- April 13, 2015State Compliance achieved3 linked violations
- January 14, 2015State Violation/Reminder Notice2 linked violations
- April 21, 2014State Compliance achieved1 linked violation
- January 10, 2014State Public Notification requested2 linked violations
- January 10, 2014State Violation/Reminder Notice4 linked violations
- November 26, 2013Federal Compliance achieved2 linked violations
- August 14, 2002State Compliance achieved21 linked violations
- July 18, 2002State Compliance achieved6 linked violations
- February 4, 2002State Administrative/Compliance Order with penalty issued20 linked violations
- January 30, 2002State Compliance achieved5 linked violations
- January 16, 2002State Public Notification requested7 linked violations
- January 16, 2002State Violation/Reminder Notice6 linked violations
- November 30, 2001State Administrative/Compliance Order with penalty issued1 linked violation
- July 1, 2001State Compliance achieved3 linked violations
- November 7, 1997State Formal Notice of Violation issued1 linked violation
- November 7, 1997State Administrative/Compliance Order without penalty issued5 linked violations
- January 24, 1996State Administrative/Compliance Order without penalty issued2 linked violations
Contact
CRAIG CO RWS & SWMD #3
918-961-1295
WELCH, OK 74369