ARDMORE, OK · Carter County
GOLDEN OAKS HOME OWNERS ASSN Water System
Current status
1 item on record is open and awaiting resolution as of July 4, 2026. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings. Full details are in the violation history below.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Oklahoma’s official records. Always confirm current status with Oklahoma before making decisions based on this information.
System facts
- System ID (PWSID)
- OK2001032
- System type
- Community Water System
- Population served
- 135
- Service connections
- 63
- Ownership
- privately owned
- Water source
- groundwater (wells)
Violation history
Monitoring and Reporting (DBP)
—Chlorine
November 1, 2025 – November 30, 2025
ArchivedMonitoring and Reporting (DBP)
—Chlorine
September 1, 2025 – September 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2025 – July 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
May 1, 2025 – May 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2025 – May 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
March 1, 2025 – March 31, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – July 15, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2024 – June 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
June 1, 2024 – June 30, 2024
ResolvedMonitoring, Source Water (GWR)
—E. COLI
May 16, 2024 – April 25, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2024 – June 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2024 – April 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2024 – February 29, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2024 – March 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2023 – November 30, 2023
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 2, 2023 – July 15, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2023 – December 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2023 – December 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2023 – October 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2023 – August 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2023 – July 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2023 – September 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2023 – September 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2023 – May 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – June 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – June 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – April 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – March 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2023 – February 28, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2023 – January 31, 2023
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2023 – December 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2022 – December 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – November 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2022 – December 31, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2022 – December 31, 2022
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2022 – December 6, 2023
ResolvedMonitoring, Source Water (GWR)
—E. COLI
September 3, 2022
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2022 – September 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2022 – September 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – June 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2022 – May 31, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2022 – June 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2022 – June 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2022 – April 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2022 – March 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2022 – February 28, 2022
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2022 – December 31, 2024
ArchivedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2022 – March 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2021 – August 31, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2021 – September 30, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2021 – September 30, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2020 – December 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2020 – October 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2020 – December 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2018 – August 31, 2018
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2017 – March 31, 2017
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2015 – January 29, 2019
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2012 – January 29, 2019
ResolvedMonitoring, Source Water (GWR)
—E. COLI
May 1, 2011 – May 31, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2010 – March 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2010 – January 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2009 – December 31, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2009 – November 30, 2009
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
October 1, 2009 – January 19, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2009 – October 31, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2009 – July 31, 2009
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Styrene
January 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2009 – December 31, 2009
ResolvedMonitoring, Routine (IDSE)
—Total Haloacetic Acids (HAA5)
August 1, 2008 – July 31, 2009
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2008 – February 27, 2012
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2007 – February 27, 2012
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2007 – December 31, 2007
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Benzene
January 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2007 – December 31, 2007
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2005 – September 30, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2005 – June 30, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2005 – January 31, 2005
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2004 – December 31, 2007
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2004 – December 31, 2007
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2004 – December 31, 2007
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2002 – December 31, 2002
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2002 – December 31, 2002
Resolved
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| November 1, 2025 – November 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| September 1, 2025 – September 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2024 – July 15, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2024 – June 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2024 – June 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 16, 2024 – April 25, 2025 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| April 1, 2024 – June 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2024 – April 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2024 – February 29, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| November 1, 2023 – November 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 2, 2023 – July 15, 2024 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2023 – October 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2023 – September 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2023 – August 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2023 – July 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| June 1, 2023 – June 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2023 – May 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2023 – April 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2023 – February 28, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – January 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – December 31, 2023 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2022 – December 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2022 – November 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2022 – December 6, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 3, 2022 | Monitoring, Source Water (GWR) | E. COLI | — | Unaddressed |
| September 1, 2022 – September 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2022 – September 30, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| June 1, 2022 – June 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2022 – May 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2022 – April 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2022 – March 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2022 – February 28, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2022 – December 31, 2024 | Monitoring and Reporting (DBP) | TTHM | — | Archived |
| January 1, 2022 – March 31, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 2021 – August 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2021 – September 30, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2021 – September 30, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2020 – December 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2020 – October 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2020 – December 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 2018 – August 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2017 – March 31, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2015 – January 29, 2019 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2012 – January 29, 2019 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| May 1, 2011 – May 31, 2011 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| September 1, 2010 – September 30, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| March 1, 2010 – March 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2010 – January 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2009 – December 31, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2009 – November 30, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2009 – January 19, 2011 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| October 1, 2009 – October 31, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2009 – July 31, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| August 1, 2008 – July 31, 2009 | Monitoring, Routine (IDSE) | Total Haloacetic Acids (HAA5) | — | Resolved |
| July 1, 2008 – February 27, 2012 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2007 – February 27, 2012 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| September 1, 2005 – September 30, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2005 – June 30, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2005 – January 31, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2004 – December 31, 2007 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2004 – December 31, 2007 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2004 – December 31, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2002 – December 31, 2002 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2002 – December 31, 2002 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
Enforcement actions
- December 8, 2025State Compliance achieved3 linked violations
- November 21, 2025State Public Notification requested4 linked violations
- October 28, 2025State Compliance achieved2 linked violations
- September 19, 2025State Violation/Reminder Notice3 linked violations
- September 17, 2025State Compliance achieved1 linked violation
- September 17, 2025State Compliance achieved1 linked violation
- September 17, 2025State Compliance achieved1 linked violation
- August 13, 2025State Public Notification requested4 linked violations
- August 13, 2025State Violation/Reminder Notice4 linked violations
- July 23, 2025State Public Notification requested4 linked violations
- July 23, 2025State Violation/Reminder Notice4 linked violations
- July 11, 2025State Violation/Reminder Notice1 linked violation
- July 11, 2025State Violation/Reminder Notice1 linked violation
- June 17, 2025State Compliance achieved1 linked violation
- June 17, 2025State Compliance achieved2 linked violations
- June 3, 2025State Public Notification requested3 linked violations
- June 3, 2025State Violation/Reminder Notice3 linked violations
- April 25, 2025State Compliance achieved4 linked violations
- October 3, 2024State Compliance achieved2 linked violations
- September 26, 2024State Violation/Reminder Notice4 linked violations
- September 26, 2024State Public Notification requested3 linked violations
- September 6, 2024State Compliance achieved1 linked violation
- August 21, 2024State Public Notification requested3 linked violations
- July 17, 2024State Violation/Reminder Notice1 linked violation
- July 17, 2024State Violation/Reminder Notice2 linked violations
- July 17, 2024State Public Notification requested1 linked violation
- July 15, 2024State Public Notification received4 linked violations
- July 15, 2024State Public Notification received2 linked violations
- July 15, 2024State Public Notification received2 linked violations
- July 15, 2024State Public Notification received2 linked violations
- July 15, 2024State Public Notification received1 linked violation
- July 15, 2024State Public Notification received2 linked violations
- July 15, 2024State Public Notification received5 linked violations
- July 15, 2024State Public Notification received3 linked violations
- July 15, 2024State Public Notification received26 linked violations
- July 12, 2024State Violation/Reminder Notice5 linked violations
- July 11, 2024State Compliance achieved1 linked violation
- July 11, 2024State Compliance achieved1 linked violation
- June 18, 2024State Public Notification requested2 linked violations
- June 18, 2024State Violation/Reminder Notice7 linked violations
- May 10, 2024State Compliance achieved1 linked violation
- May 10, 2024State Compliance achieved2 linked violations
- April 18, 2024State Violation/Reminder Notice2 linked violations
- February 28, 2024State Violation/Reminder Notice2 linked violations
- January 23, 2024State Public Notification requested4 linked violations
- January 23, 2024State Violation/Reminder Notice4 linked violations
- December 15, 2023State Public Notification requested2 linked violations
- December 15, 2023State Public Notification requested1 linked violation
- December 15, 2023State Violation/Reminder Notice1 linked violation
- December 6, 2023State Compliance achieved1 linked violation
- November 30, 2023State Public Notification requested2 linked violations
- November 30, 2023State Public Notification requested1 linked violation
- November 30, 2023State Violation/Reminder Notice2 linked violations
- October 19, 2023State Public Notification requested3 linked violations
- October 19, 2023State Public Notification requested1 linked violation
- October 19, 2023State Violation/Reminder Notice1 linked violation
- October 19, 2023State Violation/Reminder Notice1 linked violation
- September 22, 2023State Public Notification requested5 linked violations
- September 22, 2023State Public Notification requested3 linked violations
- August 30, 2023State Public Notification requested1 linked violation
- August 30, 2023State Public Notification requested2 linked violations
- August 30, 2023State Violation/Reminder Notice3 linked violations
- July 21, 2023State Violation/Reminder Notice1 linked violation
- July 21, 2023State Public Notification requested2 linked violations
- July 21, 2023State Public Notification requested3 linked violations
- June 21, 2023State Public Notification requested2 linked violations
- June 21, 2023State Public Notification requested2 linked violations
- June 21, 2023State Violation/Reminder Notice2 linked violations
- May 24, 2023State Violation/Reminder Notice2 linked violations
- May 24, 2023State Public Notification requested2 linked violations
- May 24, 2023State Violation/Reminder Notice3 linked violations
- April 26, 2023State Violation/Reminder Notice1 linked violation
- April 26, 2023State Violation/Reminder Notice2 linked violations
- April 4, 2023State Public Notification received2 linked violations
- April 4, 2023State Public Notification received2 linked violations
- April 4, 2023State Public Notification received2 linked violations
- April 4, 2023State Public Notification received1 linked violation
- April 4, 2023State Public Notification received2 linked violations
- April 4, 2023State Public Notification received1 linked violation
- April 4, 2023State Public Notification received1 linked violation
- April 4, 2023State Public Notification received2 linked violations
- April 4, 2023State Public Notification received2 linked violations
- April 4, 2023State Public Notification requested2 linked violations
- April 4, 2023State Violation/Reminder Notice2 linked violations
- April 4, 2023State Public Notification received3 linked violations
- April 4, 2023State Public Notification received2 linked violations
- March 14, 2023State Violation/Reminder Notice2 linked violations
- March 14, 2023State Violation/Reminder Notice2 linked violations
- February 3, 2023State Compliance achieved1 linked violation
- February 1, 2023State Public Notification requested3 linked violations
- February 1, 2023State Violation/Reminder Notice3 linked violations
- December 2, 2022State Public Notification requested5 linked violations
- September 6, 2022State Compliance achieved13 linked violations
- August 30, 2022State Public Notification requested6 linked violations
- August 30, 2022State Violation/Reminder Notice2 linked violations
- July 28, 2022State Violation/Reminder Notice3 linked violations
- June 29, 2022State Public Notification requested3 linked violations
- May 25, 2022State Violation/Reminder Notice4 linked violations
- April 20, 2022State Public Notification requested4 linked violations
- April 20, 2022State Violation/Reminder Notice3 linked violations
- March 24, 2022State Violation/Reminder Notice3 linked violations
- March 24, 2022State Public Notification requested2 linked violations
- January 15, 2022State Public Notification received1 linked violation
- January 15, 2022State Public Notification received1 linked violation
- January 15, 2022State Public Notification received1 linked violation
- December 11, 2021State Public Notification received3 linked violations
- December 11, 2021State Public Notification received1 linked violation
- December 11, 2021State Public Notification received2 linked violations
- November 18, 2021State Public Notification requested3 linked violations
- October 20, 2021State Public Notification requested5 linked violations
- September 18, 2021State Public Notification received2 linked violations
- September 18, 2021State Public Notification received1 linked violation
- September 17, 2021State Violation/Reminder Notice4 linked violations
- September 17, 2021State Public Notification requested3 linked violations
- June 17, 2021State Public Notification received2 linked violations
- February 1, 2021State Compliance achieved9 linked violations
- January 15, 2021State Public Notification requested6 linked violations
- January 15, 2021State Violation/Reminder Notice2 linked violations
- December 11, 2020State Public Notification requested5 linked violations
- December 11, 2020State Public Notification requested3 linked violations
- December 11, 2020State Violation/Reminder Notice4 linked violations
- December 11, 2020State Public Notification requested6 linked violations
- September 18, 2020State Public Notification requested5 linked violations
- September 18, 2020State Public Notification requested7 linked violations
- July 7, 2020State Compliance achieved3 linked violations
- June 17, 2020State Public Notification requested3 linked violations
- June 17, 2020State Public Notification requested4 linked violations
- June 17, 2020State Violation/Reminder Notice3 linked violations
- October 7, 2019State Public Notification received10 linked violations
- January 29, 2019State Compliance achieved4 linked violations
- November 21, 2018State Compliance achieved4 linked violations
- October 18, 2017State Compliance achieved12 linked violations
- September 21, 2017State Violation/Reminder Notice4 linked violations
- September 21, 2017State Public Notification requested3 linked violations
- July 17, 2017State Public Notification requested4 linked violations
- August 4, 2016State Compliance achieved4 linked violations
- August 4, 2016State Compliance achieved3 linked violations
- August 4, 2016State Compliance achieved3 linked violations
- August 4, 2016State Compliance achieved4 linked violations
- August 4, 2016State Compliance achieved3 linked violations
- January 14, 2015State Violation/Reminder Notice3 linked violations
- November 7, 2014State Compliance achieved2 linked violations
- April 8, 2010State Public Notification requested4 linked violations
- April 8, 2010State Violation/Reminder Notice3 linked violations
- April 8, 2010State Violation/Reminder Notice4 linked violations
- April 8, 2010State Violation/Reminder Notice3 linked violations
- February 12, 2010State Public Notification requested9 linked violations
- January 19, 2010State Public Notification requested4 linked violations
- January 13, 2010State Public Notification requested24 linked violations
- November 23, 2009State Public Notification requested3 linked violations
- January 30, 2009State Compliance achieved23 linked violations
- August 25, 2008State Violation/Reminder Notice3 linked violations
- August 7, 2008State Public Notification received5 linked violations
- August 7, 2008State Public Notification received7 linked violations
- July 25, 2008State Administrative/Compliance Order with penalty issued10 linked violations
- March 5, 2008State Administrative/Compliance Order with penalty issued25 linked violations
- July 26, 2007State Public Notification requested5 linked violations
- April 5, 2006State Compliance achieved33 linked violations
- January 1, 2006State Compliance achieved6 linked violations
- October 3, 2005State Public Notification requested4 linked violations
- October 3, 2005State Violation/Reminder Notice4 linked violations
- August 23, 2005State Public Notification requested10 linked violations
- March 15, 2005State Public Notification requested4 linked violations
- February 9, 2005State Public Notification requested2 linked violations
- November 12, 2004State Public Notification requested3 linked violations
- November 2, 2004State Public Notification requested5 linked violations
- June 8, 2004State Violation/Reminder Notice2 linked violations
- June 8, 2004State Public Notification requested3 linked violations
- May 14, 2004State Violation/Reminder Notice2 linked violations
- February 23, 2004State Violation/Reminder Notice7 linked violations
- December 29, 2003State Compliance achieved14 linked violations
- December 4, 2003State Public Notification received18 linked violations
- October 6, 2003State Public Notification requested87 linked violations
- September 25, 2003State Violation/Reminder Notice8 linked violations
- September 5, 2003State Violation/Reminder Notice2 linked violations
- August 8, 2003State Public Notification requested2 linked violations
- August 8, 2003State Violation/Reminder Notice1 linked violation
- March 3, 2003State Administrative/Compliance Order with penalty issued4 linked violations
- July 26, 2002State Administrative/Compliance Order with penalty issued3 linked violations
Contact
GOLDEN OAKS HOME OWNERS ASSN
580-630-0220
ARDMORE, OK 73401