COOKSON, OK · Cherokee County
CHEROKEE CO. RWD # 16 (CHICKEN CREEK) Water System
Consumer Confidence Report status
CHEROKEE CO. RWD # 16 (CHICKEN CREEK) must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for CHEROKEE CO. RWD # 16 (CHICKEN CREEK).
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Oklahoma’s official records. Always confirm current status with Oklahoma before making decisions based on this information.
System facts
- System ID (PWSID)
- OK1021707
- System type
- Community Water System
- Population served
- 272
- Service connections
- 546
- Ownership
- privately owned
- Water source
- surface water (rivers, lakes, or reservoirs)
CHEROKEE CO. RWD # 16 (CHICKEN CREEK) is one of 1,277 community water systems in Oklahoma in the 500 or fewer people size category, serving 272 people from surface water.
As of August 1, 2026, its federal record holds 59 entries between 1998 and 2025, all of which EPA lists as closed.
Of the 59, 52 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Stage 1 Disinfectants and Disinfection Byproducts Rule, the Total Coliform Rules, and synthetic organic chemicals.
Violation history
Monitoring and Reporting (DBP)
—CARBON, TOTAL
July 1, 2025 – July 31, 2025
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
July 1, 2025 – July 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2025 – July 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
June 1, 2025 – June 30, 2025
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
June 1, 2025 – June 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2025 – June 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
June 1, 2025 – June 30, 2025
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
May 1, 2025 – May 31, 2025
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
May 1, 2025 – May 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – April 30, 2025
ResolvedTreatment Technique Precursor Removal
Health-basedCARBON, TOTAL
April 1, 2025 – June 30, 2025
ArchivedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
April 1, 2025 – June 30, 2025
ResolvedMonitoring, Regular
—2,4-D
April 1, 2025 – June 30, 2025
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
April 1, 2025 – April 30, 2025
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
February 1, 2025 – February 28, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2025 – February 28, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
February 1, 2025 – February 28, 2025
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
December 1, 2024 – December 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2024 – December 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
December 1, 2024 – December 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2024 – November 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
November 1, 2024 – November 30, 2024
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
November 1, 2024 – November 30, 2024
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
November 1, 2024 – November 30, 2024
ResolvedMonitoring, Regular
—Glyphosate
October 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
October 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—2,4-D
October 1, 2024 – December 31, 2024
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
September 1, 2024 – September 30, 2024
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
September 1, 2024 – September 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
September 1, 2024 – September 30, 2024
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
July 1, 2024 – September 30, 2024
ResolvedMonitoring, Regular
—Glyphosate
July 1, 2024 – September 30, 2024
ResolvedMonitoring, Regular
—2,4-D
July 1, 2024 – September 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2024 – December 31, 2024
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2024 – December 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
December 1, 2022 – November 30, 2023
ResolvedMonitoring and Reporting (DBP)
—TTHM
December 1, 2022 – November 30, 2023
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
February 1, 2020 – February 29, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2020 – March 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2019 – December 31, 2019
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
October 1, 2019 – December 31, 2019
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
October 1, 2019 – December 31, 2019
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
October 1, 2018 – December 31, 2018
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
October 1, 2017 – December 31, 2017
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2013 – November 19, 2013
ResolvedMonitoring, Routine (IDSE)
—Total Haloacetic Acids (HAA5)
October 1, 2010 – October 31, 2010
ResolvedMonitoring, Routine (IDSE)
—TTHM
October 1, 2010 – December 31, 2010
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—Stage 2 Disinfectants and Disinfection Byproducts Rule
October 1, 2010 – April 25, 2014
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
February 1, 2009 – February 28, 2009
ResolvedMonitoring, Regular
—Arsenic
January 1, 2007 – December 31, 2007
ResolvedTreatment Technique Precursor Removal
Health-basedCARBON, TOTAL
January 1, 2007 – March 31, 2007
ResolvedTreatment Technique Precursor Removal
Health-basedCARBON, TOTAL
October 1, 2006 – December 31, 2006
ResolvedTreatment Technique Precursor Removal
Health-basedCARBON, TOTAL
July 1, 2006 – September 30, 2006
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
July 1, 1998 – July 31, 1998
ArchivedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
June 1, 1998 – June 30, 1998
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
April 1, 1998 – April 30, 1998
Archived
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2025 – June 30, 2025 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| June 1, 2025 – June 30, 2025 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| June 1, 2025 – June 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2025 – June 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2025 – June 30, 2025 | Treatment Technique Precursor Removal | CARBON, TOTAL | Health-based | Archived |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| April 1, 2025 – June 30, 2025 | Monitoring, Regular | 2,4-D | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2024 – December 31, 2024 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| December 1, 2024 – December 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2024 – December 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | Glyphosate | — | Resolved |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| October 1, 2024 – December 31, 2024 | Monitoring, Regular | 2,4-D | — | Resolved |
| September 1, 2024 – September 30, 2024 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| September 1, 2024 – September 30, 2024 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| September 1, 2024 – September 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | Glyphosate | — | Resolved |
| July 1, 2024 – September 30, 2024 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| December 1, 2022 – November 30, 2023 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| December 1, 2022 – November 30, 2023 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| February 1, 2020 – February 29, 2020 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| October 1, 2018 – December 31, 2018 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| October 1, 2017 – December 31, 2017 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| October 1, 2013 – November 19, 2013 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2010 – October 31, 2010 | Monitoring, Routine (IDSE) | Total Haloacetic Acids (HAA5) | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Routine (IDSE) | TTHM | — | Resolved |
| October 1, 2010 – April 25, 2014 | Failure Submit IDSE/Subpart V Plan Rpt | Stage 2 Disinfectants and Disinfection Byproducts Rule | — | Resolved |
| February 1, 2009 – February 28, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2007 – March 31, 2007 | Treatment Technique Precursor Removal | CARBON, TOTAL | Health-based | Resolved |
| October 1, 2006 – December 31, 2006 | Treatment Technique Precursor Removal | CARBON, TOTAL | Health-based | Resolved |
| July 1, 2006 – September 30, 2006 | Treatment Technique Precursor Removal | CARBON, TOTAL | Health-based | Resolved |
| July 1, 1998 – July 31, 1998 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Archived |
| June 1, 1998 – June 30, 1998 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1998 – April 30, 1998 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Archived |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- November 12, 2025State Administrative/Compliance Order without penalty issued3 linked violations
- October 1, 2025State Compliance achieved2 linked violations
- October 1, 2025State Compliance achieved2 linked violations
- September 19, 2025State Public Notification requested6 linked violations
- September 3, 2025State Compliance achieved2 linked violations
- September 3, 2025State Compliance achieved2 linked violations
- September 3, 2025State Compliance achieved2 linked violations
- September 3, 2025State Compliance achieved1 linked violation
- September 3, 2025State Compliance achieved1 linked violation
- September 3, 2025State Compliance achieved2 linked violations
- August 13, 2025State Public Notification requested8 linked violations
- August 13, 2025State Violation/Reminder Notice7 linked violations
- August 4, 2025State Compliance achieved1 linked violation
- August 4, 2025State Compliance achieved1 linked violation
- August 4, 2025State Compliance achieved4 linked violations
- July 23, 2025State Public Notification requested4 linked violations
- July 23, 2025State Violation/Reminder Notice4 linked violations
- July 15, 2025State Compliance achieved1 linked violation
- July 15, 2025State Compliance achieved1 linked violation
- July 11, 2025State Violation/Reminder Notice1 linked violation
- July 11, 2025State Public Notification received6 linked violations
- July 11, 2025State Public Notification received8 linked violations
- July 11, 2025State Public Notification received7 linked violations
- July 11, 2025State Violation/Reminder Notice1 linked violation
- June 27, 2025State Public Notification requested4 linked violations
- June 27, 2025State Violation/Reminder Notice4 linked violations
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achieved1 linked violation
- June 3, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- May 6, 2025State Violation/Reminder Notice4 linked violations
- May 6, 2025State Public Notification requested4 linked violations
- April 1, 2025State Compliance achieved1 linked violation
- April 1, 2025State Compliance achieved1 linked violation
- April 1, 2025State Compliance achieved1 linked violation
- April 1, 2025State Compliance achieved1 linked violation
- April 1, 2025State Compliance achieved1 linked violation
- April 1, 2025State Compliance achieved1 linked violation
- March 6, 2025State Public Notification requested8 linked violations
- March 6, 2025State Violation/Reminder Notice8 linked violations
- March 4, 2025State Compliance achieved1 linked violation
- March 4, 2025State Compliance achieved1 linked violation
- March 4, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- February 7, 2025State Compliance achieved1 linked violation
- January 29, 2025State Public Notification requested6 linked violations
- January 29, 2025State Violation/Reminder Notice6 linked violations
- January 10, 2025State Compliance achieved1 linked violation
- January 10, 2025State Compliance achieved1 linked violation
- November 22, 2024State Violation/Reminder Notice6 linked violations
- November 22, 2024State Public Notification requested6 linked violations
- June 28, 2024State Public Notification received2 linked violations
- January 23, 2024State Public Notification requested2 linked violations
- January 23, 2024State Violation/Reminder Notice2 linked violations
- November 16, 2021State Compliance achieved2 linked violations
- November 16, 2021State Compliance achieved1 linked violation
- November 16, 2021State Compliance achieved1 linked violation
- November 16, 2021State Compliance achieved1 linked violation
- November 16, 2021State Compliance achieved2 linked violations
- June 17, 2021State Public Notification received1 linked violation
- June 17, 2021State Public Notification received1 linked violation
- June 17, 2021State Public Notification received1 linked violation
- June 17, 2021State Public Notification received1 linked violation
- March 6, 2021State Public Notification received1 linked violation
- December 16, 2020State Public Notification received1 linked violation
- December 16, 2020State Public Notification received1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Public Notification requested1 linked violation
- June 17, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Violation/Reminder Notice1 linked violation
- March 6, 2020State Public Notification requested1 linked violation
- February 7, 2020State Compliance achieved1 linked violation
- February 7, 2020State Compliance achieved1 linked violation
- December 17, 2019State Violation/Reminder Notice1 linked violation
- December 17, 2019State Public Notification requested1 linked violation
- December 17, 2019State Violation/Reminder Notice1 linked violation
- December 17, 2019State Public Notification requested1 linked violation
- October 3, 2019State Public Notification received1 linked violation
- October 3, 2019State Public Notification received1 linked violation
- August 6, 2019State Compliance achieved1 linked violation
- February 25, 2019State Violation/Reminder Notice1 linked violation
- February 25, 2019State Public Notification requested1 linked violation
- March 21, 2018State Compliance achieved1 linked violation
- December 14, 2017State Public Notification requested1 linked violation
- December 14, 2017State Violation/Reminder Notice1 linked violation
- July 26, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achieved1 linked violation
- July 26, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 26, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 26, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 26, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 26, 2016State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- April 25, 2014State Compliance achieved3 linked violations
- April 25, 2014State Compliance achieved2 linked violations
- November 19, 2013State Compliance achieved1 linked violation
- November 1, 2013State Public Notification requested1 linked violation
- November 1, 2013State Violation/Reminder Notice1 linked violation
- May 15, 2009State Compliance achieved1 linked violation
- May 8, 2009State Public Notification received1 linked violation
- April 24, 2009State Public Notification requested1 linked violation
- April 24, 2009State Administrative/Compliance Order with penalty issued1 linked violation
- July 1, 2008State Public Notification received1 linked violation
- June 26, 2008State Public Notification received1 linked violation
- June 26, 2008State Compliance achieved1 linked violation
- June 24, 2008State Public Notification requested1 linked violation
- July 26, 2007State Compliance achieved5 linked violations
- May 31, 2007State Public Notification received1 linked violation
- May 23, 2007State Public Notification requested1 linked violation
- May 23, 2007State Administrative/Compliance Order with penalty issued1 linked violation
- March 28, 2007State Public Notification received1 linked violation
- March 1, 2007State Public Notification requested1 linked violation
- March 1, 2007State Administrative/Compliance Order with penalty issued1 linked violation
- November 9, 2006State Public Notification requested1 linked violation
- November 9, 2006State Administrative/Compliance Order with penalty issued2 linked violations
- October 6, 2006State Public Notification received2 linked violations
- September 22, 2006State Administrative/Compliance Order with penalty issued4 linked violations
- July 24, 1997State Boil Water Order1 linked violation
- September 13, 1995State Administrative/Compliance Order without penalty issued46 linked violations
Common questions
Is CHEROKEE CO. RWD # 16 (CHICKEN CREEK) required to publish a Consumer Confidence Report?
- Yes. CHEROKEE CO. RWD # 16 (CHICKEN CREEK) is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is CHEROKEE CO. RWD # 16 (CHICKEN CREEK)’s next Consumer Confidence Report due?
- CHEROKEE CO. RWD # 16 (CHICKEN CREEK)’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does CHEROKEE CO. RWD # 16 (CHICKEN CREEK) have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for CHEROKEE CO. RWD # 16 (CHICKEN CREEK).
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
CHEROKEE CO. RWD #16 (CHICKEN CREEK)
918-207-9436
COOKSON, OK 74427