COPAN, OK · Washington County
COPAN PWA Water System
Current status
1 open health-based violation on record as of July 4, 2026, alongside 7 other open item(s). See the violation history below for contaminant and status details.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Oklahoma’s official records. Always confirm current status with Oklahoma before making decisions based on this information.
System facts
- System ID (PWSID)
- OK1021417
- System type
- Community Water System
- Population served
- 733
- Service connections
- 357
- Ownership
- local government
- Water source
- surface water (rivers, lakes, or reservoirs)
Violation history
Maximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
July 1, 2025 – September 30, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTTHM
July 1, 2025 – September 30, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
July 1, 2025 – September 30, 2025
ArchivedFailure Submit IDSE/Subpart V Plan Rpt
—TTHM
June 30, 2025 – September 18, 2025
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—Total Haloacetic Acids (HAA5)
June 30, 2025 – September 18, 2025
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
May 1, 2025 – May 31, 2025
ArchivedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
May 1, 2025 – May 31, 2025
ArchivedSingle Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
May 1, 2025 – May 31, 2025
ArchivedFailure Submit IDSE/Subpart V Plan Rpt
—Total Haloacetic Acids (HAA5)
April 1, 2025 – July 10, 2025
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
April 1, 2025 – April 30, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2025 – June 30, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
April 1, 2025 – June 30, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
April 1, 2025 – June 30, 2025
ArchivedSingle Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
April 1, 2025 – April 30, 2025
ArchivedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
April 1, 2025 – April 30, 2025
ArchivedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
April 1, 2025 – April 30, 2025
ArchivedFailure Submit IDSE/Subpart V Plan Rpt
—TTHM
April 1, 2025 – September 18, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 29, 2025
AddressedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
March 1, 2025 – March 31, 2025
ArchivedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
March 1, 2025 – March 31, 2025
ArchivedSingle Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
March 1, 2025 – March 31, 2025
ArchivedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
February 1, 2025 – February 28, 2025
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
January 1, 2025 – March 31, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
January 1, 2025 – March 31, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
January 1, 2025 – January 31, 2025
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—TTHM
December 30, 2024 – September 18, 2025
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—Total Haloacetic Acids (HAA5)
December 30, 2024 – September 18, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 21, 2024
AddressedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
December 1, 2024 – December 31, 2024
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
November 1, 2024 – November 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2024 – November 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
November 1, 2024 – November 30, 2024
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
November 1, 2024 – November 30, 2024
ResolvedMonitoring and Reporting (DBP)
—CARBON, TOTAL
November 1, 2024 – November 30, 2024
ResolvedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024
AddressedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024
AddressedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
October 1, 2024 – December 31, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2024 – December 31, 2024
ArchivedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
October 1, 2024 – October 31, 2024
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2024 – September 18, 2025
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
October 1, 2024 – December 31, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2024 – December 31, 2024
ArchivedFailure Submit IDSE/Subpart V Plan Rpt
—Total Haloacetic Acids (HAA5)
September 29, 2024 – September 18, 2025
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—TTHM
September 29, 2024 – September 18, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 5, 2024
AddressedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
September 1, 2024 – September 30, 2024
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
August 1, 2024 – August 31, 2024
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
July 1, 2024 – July 31, 2024
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
July 1, 2024 – September 30, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
July 1, 2024 – September 30, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTotal Haloacetic Acids (HAA5)
July 1, 2024 – September 30, 2024
ArchivedFailure Submit IDSE/Subpart V Plan Rpt
—TTHM
June 30, 2024 – September 18, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 3, 2024
AddressedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
May 1, 2024 – May 31, 2024
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2024 – June 30, 2024
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2024 – June 30, 2024
ArchivedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
April 1, 2024 – April 30, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 10, 2024
AddressedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
March 1, 2024 – March 31, 2024
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—TTHM
December 30, 2023 – September 18, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 18, 2023
AddressedMaximum Contaminant Level Violation, Average
Health-basedTTHM
July 1, 2023 – September 30, 2023
ArchivedSingle Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
June 1, 2023 – June 30, 2023
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
June 1, 2023 – June 30, 2023
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
February 1, 2022 – February 28, 2022
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2006 – January 31, 2006
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2004 – December 31, 2004
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2004 – March 31, 2004
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
August 1, 1998 – August 31, 1998
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1995 – July 31, 1995
Resolved
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateAddressed corrective action reported, pending final confirmation
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| July 1, 2025 – September 30, 2025 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| July 1, 2025 – September 30, 2025 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| July 1, 2025 – September 30, 2025 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| June 30, 2025 – September 18, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | TTHM | — | Resolved |
| June 30, 2025 – September 18, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | Total Haloacetic Acids (HAA5) | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Archived |
| May 1, 2025 – May 31, 2025 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Archived |
| May 1, 2025 – May 31, 2025 | Single Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Archived |
| April 1, 2025 – July 10, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | Total Haloacetic Acids (HAA5) | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Archived |
| April 1, 2025 – June 30, 2025 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| April 1, 2025 – June 30, 2025 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| April 1, 2025 – June 30, 2025 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| April 1, 2025 – April 30, 2025 | Single Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Archived |
| April 1, 2025 – April 30, 2025 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Archived |
| April 1, 2025 – April 30, 2025 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Archived |
| April 1, 2025 – September 18, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | TTHM | — | Resolved |
| March 29, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 1, 2025 – March 31, 2025 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Archived |
| March 1, 2025 – March 31, 2025 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Archived |
| March 1, 2025 – March 31, 2025 | Single Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Archived |
| February 1, 2025 – February 28, 2025 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| January 1, 2025 – March 31, 2025 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| January 1, 2025 – March 31, 2025 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| January 1, 2025 – March 31, 2025 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| January 1, 2025 – January 31, 2025 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| December 30, 2024 – September 18, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | TTHM | — | Resolved |
| December 30, 2024 – September 18, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | Total Haloacetic Acids (HAA5) | — | Resolved |
| December 21, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| December 1, 2024 – December 31, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring and Reporting (DBP) | CARBON, TOTAL | — | Resolved |
| October 17, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Addressed |
| October 17, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Addressed |
| October 1, 2024 – December 31, 2024 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| October 1, 2024 – December 31, 2024 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| October 1, 2024 – October 31, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| October 1, 2024 – September 18, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2024 – December 31, 2024 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| October 1, 2024 – December 31, 2024 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| September 29, 2024 – September 18, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | Total Haloacetic Acids (HAA5) | — | Resolved |
| September 29, 2024 – September 18, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | TTHM | — | Resolved |
| September 5, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| September 1, 2024 – September 30, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| July 1, 2024 – July 31, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| July 1, 2024 – September 30, 2024 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| July 1, 2024 – September 30, 2024 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| July 1, 2024 – September 30, 2024 | Maximum Contaminant Level Violation, Average | Total Haloacetic Acids (HAA5) | Health-based | Archived |
| June 30, 2024 – September 18, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | TTHM | — | Resolved |
| June 3, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| May 1, 2024 – May 31, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| April 1, 2024 – June 30, 2024 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| April 1, 2024 – June 30, 2024 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| April 1, 2024 – April 30, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| March 10, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 1, 2024 – March 31, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| December 30, 2023 – September 18, 2025 | Failure Submit IDSE/Subpart V Plan Rpt | TTHM | — | Resolved |
| November 18, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 1, 2023 – September 30, 2023 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| June 1, 2023 – June 30, 2023 | Single Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| June 1, 2023 – June 30, 2023 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| February 1, 2022 – February 28, 2022 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| January 1, 2006 – January 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2004 – December 31, 2004 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| January 1, 2004 – March 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 1998 – August 31, 1998 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Archived |
| July 1, 1995 – July 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateAddressed corrective action reported, pending final confirmation
Enforcement actions
- December 6, 2025State Public Notification received4 linked violations
- December 6, 2025State Public Notification received43 linked violations
- December 6, 2025State Public Notification received28 linked violations
- September 18, 2025State Compliance achieved9 linked violations
- August 20, 2025State Public Notification requested94 linked violations
- July 29, 2025State Violation/Reminder Notice4 linked violations
- July 16, 2025State Public Notification requested11 linked violations
- June 26, 2025State Compliance achieved2 linked violations
- June 26, 2025State Compliance achieved4 linked violations
- June 26, 2025State Compliance achieved8 linked violations
- June 26, 2025State Compliance achieved3 linked violations
- May 23, 2025State Public Notification requested8 linked violations
- May 6, 2025State Public Notification requested7 linked violations
- April 9, 2025State Violation/Reminder Notice3 linked violations
- January 29, 2025State Public Notification requested15 linked violations
- January 2, 2025State Public Notification requested6 linked violations
- January 2, 2025State Violation/Reminder Notice2 linked violations
- November 22, 2024State Violation/Reminder Notice3 linked violations
- November 22, 2024State Public Notification requested3 linked violations
- November 20, 2024State Violation/Reminder Notice6 linked violations
- November 20, 2024State Public Notification requested5 linked violations
- October 21, 2024State Violation/Reminder Notice7 linked violations
- September 26, 2024State Violation/Reminder Notice3 linked violations
- August 21, 2024State Public Notification requested7 linked violations
- July 17, 2024State Public Notification requested6 linked violations
- July 17, 2024State Public Notification requested11 linked violations
- June 18, 2024State Public Notification requested3 linked violations
- May 15, 2024State Public Notification requested2 linked violations
- May 3, 2024State Administrative/Compliance Order without penalty issued46 linked violations
- March 15, 2024State Violation/Reminder Notice5 linked violations
- November 15, 2023State Administrative/Compliance Order without penalty issued51 linked violations
- November 15, 2023State Public Notification requested4 linked violations
- October 18, 2023State Public Notification requested4 linked violations
- April 20, 2022State Violation/Reminder Notice3 linked violations
- August 25, 2021State Public Notification requested4 linked violations
- July 28, 2020State Violation/Reminder Notice4 linked violations
- November 14, 2019State Public Notification received4 linked violations
- November 5, 2019State Public Notification requested3 linked violations
- November 3, 2016State Compliance achieved23 linked violations
- July 26, 2016State Compliance achieved6 linked violations
- July 26, 2016State Compliance achieved10 linked violations
- July 26, 2016State Compliance achieved3 linked violations
- July 26, 2016State Compliance achieved2 linked violations
- June 10, 2016State Violation/Reminder Notice6 linked violations
- February 20, 2015State Compliance achieved2 linked violations
- July 20, 2009State Compliance achieved15 linked violations
- November 13, 2008State Public Notification requested4 linked violations
- October 29, 2008State Administrative/Compliance Order with penalty issued14 linked violations
- September 25, 2008State Public Notification requested6 linked violations
- August 5, 2008State Administrative/Compliance Order with penalty issued7 linked violations
- June 23, 2008State Technical Assistance Visit5 linked violations
- April 8, 2008State Public Notification received4 linked violations
- April 15, 2005State Public Notification requested118 linked violations
- April 15, 1999State Administrative/Compliance Order without penalty issued2 linked violations
- September 16, 1998State Administrative/Compliance Order without penalty issued2 linked violations
- June 1, 1998State Administrative/Compliance Order without penalty issued2 linked violations
Contact
COPAN PWA
918-532-4114
COPAN, OK 74022