Drinking Water Compliance OS

PERRY, OK · Noble County

PERRY WATER & LIGHT DEPT Water System

Current status

1 open health-based violation on record as of July 4, 2026, alongside 11 other open item(s). See the violation history below for contaminant and status details.

This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.

Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Oklahoma’s official records. Always confirm current status with Oklahoma before making decisions based on this information.

System facts

System ID (PWSID)
OK1021206
System type
Community Water System
Population served
5,230
Service connections
2,669
Ownership
local government
Water source
surface water (rivers, lakes, or reservoirs)

Violation history

  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    July 1, 2025 – September 30, 2025

    Archived
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    April 1, 2025 – June 30, 2025

    Archived
  • Failure Submit IDSE/Subpart V Plan Rpt

    TTHM

    December 30, 2024 – March 17, 2025

    Resolved
  • LSL Inventory

    Health-based

    LEAD AND COPPER RULE REVISIONS

    October 17, 2024

    Unaddressed
  • LSL Reporting

    LEAD AND COPPER RULE REVISIONS

    October 17, 2024

    Unaddressed
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    October 1, 2024 – December 31, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    October 1, 2024 – October 31, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2024 – July 31, 2024

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    July 1, 2024 – July 31, 2024

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    July 1, 2024 – September 30, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    May 1, 2024 – May 31, 2024

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    April 1, 2024 – June 30, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    February 1, 2024 – February 29, 2024

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    January 1, 2024 – March 31, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    November 1, 2023 – November 30, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    November 1, 2023 – November 30, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    October 1, 2023 – October 31, 2023

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    October 1, 2023 – December 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2023 – October 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    October 1, 2023 – December 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    October 1, 2023 – December 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    October 1, 2023 – October 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    September 1, 2023 – September 30, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    September 1, 2023 – November 30, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    September 1, 2023 – November 30, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    August 1, 2023 – August 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    July 1, 2023 – July 31, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    July 1, 2023 – July 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2023 – September 30, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    June 1, 2023 – June 30, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2023 – June 30, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    April 1, 2023 – April 30, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    April 1, 2023 – June 30, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2023 – June 30, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    March 1, 2023 – March 31, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    February 1, 2023 – February 28, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    January 1, 2023 – March 31, 2023

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    January 1, 2023 – March 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    January 1, 2023 – March 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    January 1, 2023 – January 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    January 1, 2023 – January 31, 2023

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    January 1, 2023 – January 31, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    December 1, 2022 – December 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    December 1, 2022 – December 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    November 1, 2022 – November 30, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    November 1, 2022 – November 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    November 1, 2022 – November 30, 2022

    Resolved
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    October 2, 2022 – September 25, 2023

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2022 – October 31, 2022

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    October 1, 2022 – December 31, 2022

    Resolved
  • Follow-up Or Routine LCR Tap M/R

    Lead and Copper Rule

    October 1, 2022 – March 22, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    October 1, 2022 – October 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    October 1, 2022 – October 31, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    September 1, 2022 – September 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    September 1, 2022 – September 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    September 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    September 1, 2022 – September 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    August 1, 2022 – August 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    August 1, 2022 – August 31, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    August 1, 2022 – August 31, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    August 1, 2022 – August 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    July 1, 2022 – July 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    July 1, 2022 – July 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    July 1, 2022 – September 30, 2022

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    June 1, 2022 – June 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    June 1, 2022 – August 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    June 1, 2022 – August 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    June 1, 2022 – June 30, 2022

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    March 1, 2022 – May 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    March 1, 2022 – May 31, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    March 1, 2022 – March 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    March 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    March 1, 2022 – March 31, 2022

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    December 1, 2021 – December 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    November 1, 2021 – November 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    November 1, 2021 – November 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    October 1, 2021 – December 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    October 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2021 – October 31, 2021

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    October 1, 2021 – December 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    October 1, 2021 – December 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    CARBON, TOTAL

    October 1, 2021 – December 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2021 – December 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    October 1, 2021 – October 31, 2021

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    October 1, 2021 – October 31, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    September 29, 2021 – March 22, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    September 29, 2021 – March 22, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    September 29, 2021 – March 22, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    September 29, 2021 – March 22, 2024

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    September 1, 2021 – September 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    September 1, 2021 – September 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    September 1, 2021 – September 30, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    August 1, 2021 – August 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    August 1, 2021 – August 31, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    July 1, 2021 – July 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    July 1, 2021 – July 31, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    June 28, 2021 – March 22, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    June 28, 2021 – March 22, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    June 28, 2021 – March 22, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    June 28, 2021 – March 22, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    June 28, 2021 – March 22, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    June 28, 2021 – March 22, 2024

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    June 28, 2021 – March 22, 2024

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    June 1, 2021 – June 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    June 1, 2021 – June 30, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    May 1, 2021 – May 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    May 1, 2021 – May 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    April 1, 2021 – April 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    April 1, 2021 – April 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2021 – June 30, 2021

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    April 1, 2021 – April 30, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    April 1, 2021 – April 30, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    March 17, 2021

    Addressed
  • Public Notification Violation for NPDWR Violation

    Public Notice

    March 17, 2021

    Addressed
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    March 1, 2021 – March 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    March 1, 2021 – March 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    March 1, 2021 – March 31, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    January 26, 2021

    Addressed
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    January 1, 2021 – January 31, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    January 1, 2021 – January 31, 2021

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    December 27, 2020

    Addressed
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2020 – December 31, 2020

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    December 1, 2020

    Addressed
  • Public Notification Violation for NPDWR Violation

    Public Notice

    December 1, 2020

    Addressed
  • Public Notification Violation for NPDWR Violation

    Public Notice

    December 1, 2020

    Addressed
  • Public Notification Violation for NPDWR Violation

    Public Notice

    December 1, 2020

    Addressed
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    November 1, 2020 – November 30, 2020

    Resolved
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 6, 2020

    Addressed
  • Public Notification Violation for NPDWR Violation

    Public Notice

    October 6, 2020

    Addressed
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    October 2, 2020 – September 25, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    July 1, 2020 – July 31, 2020

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    March 1, 2020 – March 31, 2020

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    January 1, 2020 – March 31, 2020

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    January 1, 2020 – January 31, 2020

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    January 1, 2020 – January 31, 2020

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    December 1, 2019 – December 31, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2019 – December 31, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    November 1, 2019 – November 30, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    November 1, 2019 – November 30, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2019 – October 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    October 1, 2019 – October 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2019 – December 31, 2019

    Resolved
  • Failure Submit IDSE/Subpart V Plan Rpt

    TTHM

    September 29, 2019 – May 16, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    September 1, 2019 – September 30, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    September 1, 2019 – September 30, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorite

    September 1, 2019 – September 30, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    August 1, 2019 – August 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    August 1, 2019 – August 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    July 1, 2019 – July 31, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    July 1, 2019 – July 31, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    June 1, 2019 – June 30, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    June 1, 2019 – June 30, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    May 1, 2019 – May 31, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    May 1, 2019 – May 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    April 1, 2019 – April 30, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    February 1, 2019 – February 28, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    February 1, 2019 – February 28, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    January 1, 2019 – January 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    January 1, 2019 – January 31, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2018 – December 31, 2018

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    December 1, 2018 – December 31, 2018

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    November 1, 2018 – November 30, 2018

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    November 1, 2018 – November 30, 2018

    Resolved
  • Consumer Confidence Report Complete Failure to Report

    Consumer Confidence Rule

    July 1, 2017 – November 30, 2017

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    December 1, 2016 – December 31, 2016

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    November 1, 2016 – November 30, 2016

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    October 1, 2016 – October 31, 2016

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine dioxide

    July 1, 2016 – July 31, 2016

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Chlorite

    August 1, 2015 – August 31, 2015

    Resolved
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    Styrene

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    Ethylbenzene

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    Toluene

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    1,2-Dichloropropane

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 2014 – December 31, 2016

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    December 1, 2013 – February 28, 2014

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    December 1, 2013 – February 28, 2014

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    September 1, 2013 – November 30, 2013

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    October 1, 2012 – December 31, 2012

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    January 1, 2011 – March 31, 2011

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Routine Minor (TCR)

    Coliform (TCR)

    August 1, 2010 – August 31, 2010

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    July 1, 2010 – September 30, 2010

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    April 1, 2010 – June 30, 2010

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    January 1, 2010 – March 31, 2010

    Resolved
  • Initial Tap Sampling for Pb and Cu

    Lead and Copper Rule

    October 1, 2009 – August 11, 2010

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    October 1, 2009 – December 31, 2009

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    July 1, 2009 – September 30, 2009

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    April 1, 2009 – June 30, 2009

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    April 1, 2009 – June 30, 2009

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    January 1, 2009 – March 31, 2009

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    January 1, 2009 – March 31, 2009

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Total Haloacetic Acids (HAA5)

    January 1, 2009 – March 31, 2009

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Total Haloacetic Acids (HAA5)

    October 1, 2008 – December 31, 2008

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    October 1, 2008 – December 31, 2008

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    October 1, 2008 – December 31, 2008

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Total Haloacetic Acids (HAA5)

    July 1, 2008 – September 30, 2008

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    July 1, 2008 – September 30, 2008

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    July 1, 2008 – September 30, 2008

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Total Haloacetic Acids (HAA5)

    April 1, 2008 – June 30, 2008

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    April 1, 2008 – June 30, 2008

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    January 1, 2008 – March 31, 2008

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Total Haloacetic Acids (HAA5)

    January 1, 2008 – March 31, 2008

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Total Haloacetic Acids (HAA5)

    October 1, 2007 – December 31, 2007

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Total Haloacetic Acids (HAA5)

    July 1, 2007 – September 30, 2007

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    July 1, 2007 – September 30, 2007

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    July 1, 2007 – September 30, 2007

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    October 1, 2006 – December 31, 2006

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    October 1, 2006 – December 31, 2006

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    July 1, 2006 – September 30, 2006

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    July 1, 2006 – September 30, 2006

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    January 1, 2006 – March 31, 2006

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    October 1, 2005 – December 31, 2005

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    July 1, 2005 – September 30, 2005

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    April 1, 2005 – June 30, 2005

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    April 1, 2005 – June 30, 2005

    Resolved
  • Treatment Technique Precursor Removal

    Health-based

    CARBON, TOTAL

    January 1, 2005 – March 31, 2005

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    October 1, 2004 – December 31, 2004

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    TTHM

    April 1, 2004 – June 30, 2004

    Resolved
  • Monitoring, Routine Minor (TCR)

    Coliform (TCR)

    September 1, 1998 – September 30, 1998

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    August 1, 1993 – August 31, 1993

    Archived

Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetAddressed corrective action reported, pending final confirmation

Enforcement actions

Contact

PERRY WATER & LIGHT DEPT

580-336-4241