Thoreau, NN
Thoreau High School Water System
Consumer Confidence Report status
Thoreau High School must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 5 items for Thoreau High School that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Navajo Nation’s official records. Always confirm current status with Navajo Nation before making decisions based on this information.
System facts
- System ID (PWSID)
- NN3510007
- System type
- Community Water System
- Population served
- 746
- Service connections
- 82
- Ownership
- local government
- Water source
- groundwater (wells)
Thoreau High School is one of 77 community water systems in Navajo Nation in the 501 to 3,300 people size category, serving 746 people from groundwater.
As of August 1, 2026, its federal record holds 44 entries between 2013 and 2024, of which 5 remain open; none are health-based.
Of the 44, 31 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Total Coliform Rules, the Public Notice Rule and Revised PN Rule, and the Radionuclides and Revised Rad Rule.
Violation history
Public Notification Violation for NPDWR Violation
—Public Notice
August 1, 2024
UnaddressedTreatment Technique, Level 2 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
August 1, 2024 – September 6, 2024
ResolvedTreatment Technique, Level 2 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
July 1, 2024 – September 6, 2024
ResolvedMaximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
July 1, 2024 – July 31, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2024
UnaddressedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2024
UnaddressedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2024 – August 6, 2024
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
May 1, 2024 – June 17, 2024
ResolvedMonitoring, Regular
—Nitrite
January 1, 2024 – December 31, 2024
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2024 – August 6, 2024
ResolvedTreatment Technique, Level 2 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
October 1, 2022 – April 25, 2023
ResolvedMaximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
August 1, 2022 – August 31, 2022
ResolvedTreatment Technique, Level 2 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
August 1, 2022 – April 25, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 1, 2022
UnaddressedPublic Notification Violation for NPDWR Violation
—Public Notice
August 1, 2022
UnaddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2022 – December 21, 2022
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – July 27, 2022
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
May 1, 2022 – July 27, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2021 – December 31, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2021 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2021 – September 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2021 – August 31, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – December 21, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2021 – July 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2021 – June 15, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2021 – March 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – February 28, 2021
ResolvedMonitoring, Regular
—Nitrate
January 1, 2021 – December 31, 2021
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2021 – April 18, 2022
ResolvedMonitoring, Regular
—Nitrite
January 1, 2021 – December 31, 2021
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2018 – July 10, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2017 – January 31, 2017
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2016 – February 29, 2016
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2016 – December 31, 2016
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2014 – September 30, 2014
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
April 1, 2014 – June 30, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2014 – April 30, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2014 – January 31, 2014
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2014 – March 31, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2013 – November 30, 2013
ResolvedFailure Submit IDSE/Subpart V Plan Rpt
—Stage 2 Disinfectants and Disinfection Byproducts Rule
October 1, 2013 – January 1, 2015
Resolved
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| August 1, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| August 1, 2024 – September 6, 2024 | Treatment Technique, Level 2 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| July 1, 2024 – September 6, 2024 | Treatment Technique, Level 2 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| July 1, 2024 – July 31, 2024 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| July 1, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| July 1, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| July 1, 2024 – August 6, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2024 – June 17, 2024 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Nitrite | — | Archived |
| January 1, 2024 – August 6, 2024 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2022 – April 25, 2023 | Treatment Technique, Level 2 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| August 1, 2022 – August 31, 2022 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| August 1, 2022 – April 25, 2023 | Treatment Technique, Level 2 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| August 1, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| August 1, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| July 1, 2022 – December 21, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2022 – July 27, 2022 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2022 – July 27, 2022 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2021 – December 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2021 – December 31, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| September 1, 2021 – September 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2021 – August 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2021 – December 21, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2021 – July 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2021 – June 15, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2021 – March 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2021 – February 28, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2021 – December 31, 2021 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2021 – April 18, 2022 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2021 – December 31, 2021 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 2018 – July 10, 2019 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2017 – January 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2016 – February 29, 2016 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| October 1, 2014 – December 31, 2014 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2014 – September 30, 2014 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2014 – June 30, 2014 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| April 1, 2014 – April 30, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2014 – January 31, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2014 – March 31, 2014 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| November 1, 2013 – November 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2013 – January 1, 2015 | Failure Submit IDSE/Subpart V Plan Rpt | Stage 2 Disinfectants and Disinfection Byproducts Rule | — | Resolved |
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- April 21, 2025State Formal Notice of Violation issued1 linked violation
- April 21, 2025State Formal Notice of Violation issued1 linked violation
- April 21, 2025State Formal Notice of Violation issued1 linked violation
- April 21, 2025State Formal Notice of Violation issued1 linked violation
- April 21, 2025State Formal Notice of Violation issued1 linked violation
- September 11, 2024State Compliance achieved1 linked violation
- September 6, 2024State Compliance achieved1 linked violation
- September 6, 2024State Compliance achieved1 linked violation
- August 6, 2024State Compliance achieved1 linked violation
- August 6, 2024State Compliance achieved1 linked violation
- June 17, 2024State Compliance achieved1 linked violation
- May 8, 2023State Formal Notice of Violation issued1 linked violation
- April 25, 2023State Compliance achieved1 linked violation
- April 25, 2023State Compliance achieved1 linked violation
- January 31, 2023State Formal Notice of Violation issued1 linked violation
- January 31, 2023State Formal Notice of Violation issued1 linked violation
- January 31, 2023State Formal Notice of Violation issued1 linked violation
- January 31, 2023State Formal Notice of Violation issued1 linked violation
- December 21, 2022State Compliance achieved1 linked violation
- December 21, 2022State Compliance achieved1 linked violation
- September 12, 2022State Compliance achieved1 linked violation
- July 27, 2022State Compliance achieved1 linked violation
- July 27, 2022State Compliance achieved1 linked violation
- May 25, 2022State Compliance achieved1 linked violation
- May 25, 2022State Compliance achieved1 linked violation
- April 18, 2022State Compliance achieved1 linked violation
- April 18, 2022State Compliance achieved1 linked violation
- March 29, 2022State Formal Notice of Violation issued1 linked violation
- March 29, 2022State Public Notification issued1 linked violation
- March 29, 2022State Public Notification issued1 linked violation
- March 29, 2022State Public Notification issued1 linked violation
- March 29, 2022State Public Notification issued1 linked violation
- March 29, 2022State Formal Notice of Violation issued1 linked violation
- March 29, 2022State Formal Notice of Violation issued1 linked violation
- March 29, 2022State Formal Notice of Violation issued1 linked violation
- January 11, 2022State Compliance achieved1 linked violation
- October 12, 2021State Compliance achieved1 linked violation
- October 12, 2021State Compliance achieved1 linked violation
- October 12, 2021State Compliance achieved1 linked violation
- July 7, 2021State Formal Notice of Violation issued1 linked violation
- July 7, 2021State Public Notification issued1 linked violation
- July 7, 2021State Public Notification issued1 linked violation
- July 7, 2021State Formal Notice of Violation issued1 linked violation
- June 15, 2021State Compliance achieved1 linked violation
- May 19, 2021State Compliance achieved1 linked violation
- May 19, 2021State Compliance achieved1 linked violation
- May 19, 2021State Compliance achieved1 linked violation
- July 10, 2019State Compliance achieved1 linked violation
- March 5, 2019State Formal Notice of Violation issued1 linked violation
- March 5, 2019State Public Notification issued1 linked violation
- August 21, 2017State Compliance achieved1 linked violation
- August 21, 2017State Compliance achieved1 linked violation
- March 1, 2017State Compliance achieved1 linked violation
- May 20, 2016State Compliance achieved1 linked violation
- May 11, 2015State Compliance achieved1 linked violation
- April 14, 2015State Compliance achieved1 linked violation
- April 14, 2015State Compliance achieved1 linked violation
- April 14, 2015State Compliance achieved1 linked violation
- January 1, 2015State Compliance achieved1 linked violation
- August 14, 2014State Compliance achieved1 linked violation
- August 14, 2014State Compliance achieved1 linked violation
- February 13, 2014State Compliance achieved1 linked violation
Common questions
Is Thoreau High School required to publish a Consumer Confidence Report?
- Yes. Thoreau High School is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is Thoreau High School’s next Consumer Confidence Report due?
- Thoreau High School’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does Thoreau High School have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 5 items for Thoreau High School that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
Thoreau High School
5057214500
Thoreau, NM 87323