LOS LUNAS, NM · Valencia County
EL SHADDAI WATER CO OP Water System
Consumer Confidence Report status
EL SHADDAI WATER CO OP must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 7 open health-based violations for EL SHADDAI WATER CO OP, alongside 77 other open items.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace New Mexico’s official records. Always confirm current status with New Mexico before making decisions based on this information.
System facts
- System ID (PWSID)
- NM3522532
- System type
- Community Water System
- Population served
- 87
- Service connections
- 31
- Ownership
- privately owned
- Water source
- groundwater (wells)
EL SHADDAI WATER CO OP is one of 667 community water systems in New Mexico in the 500 or fewer people size category, serving 87 people from groundwater.
As of August 1, 2026, its federal record holds 354 entries between 1993 and 2026, of which 7 health-based items remain open, alongside 77 other open entries.
Of the 354, 223 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, the Total Coliform Rules, and the Public Notice Rule and Revised PN Rule.
Violation history
Monitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2026 – March 31, 2026
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2026 – February 28, 2026
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2026
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2026 – January 31, 2026
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2025 – December 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2025 – November 30, 2025
ArchivedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2025
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2025 – October 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2025 – September 30, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
August 28, 2025
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2025 – August 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025
AddressedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2025
UnaddressedPublic Notification Violation for NPDWR Violation
—Public Notice
June 6, 2025
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
June 6, 2025
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2025 – June 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2025 – May 31, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 26, 2025
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – April 30, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
March 21, 2025
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2025 – March 31, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
February 21, 2025
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2025 – February 28, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2025 – January 31, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
December 22, 2024
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
December 20, 2024
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
November 8, 2024
AddressedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024
AddressedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024
AddressedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2024
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
September 20, 2024
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2024 – September 30, 2024
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
August 23, 2024
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
July 19, 2024
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2024 – July 31, 2024
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
June 23, 2024
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
June 6, 2024
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2024 – June 30, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2024 – May 31, 2024
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 21, 2024
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2024 – April 30, 2024
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
March 21, 2024
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
March 3, 2024
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2024 – March 31, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2024 – February 29, 2024
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
January 21, 2024
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2024 – January 31, 2024
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
December 31, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2023 – December 31, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
November 5, 2023
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
November 5, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2023 – November 30, 2023
ArchivedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2023 – October 31, 2023
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 30, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
August 27, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2023 – August 31, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
July 30, 2023
AddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2023 – July 31, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
June 23, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2023 – June 30, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
May 21, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2023 – May 31, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 16, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – April 30, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
March 19, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – March 31, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
February 26, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2023 – February 28, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
January 29, 2023
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
January 8, 2023
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2023 – January 31, 2023
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2022 – December 31, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
November 20, 2022
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – November 30, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
October 23, 2022
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
October 23, 2022
AddressedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2022
AddressedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2022
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2022 – October 31, 2022
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2022 – September 30, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
August 27, 2022
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
August 7, 2022
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2022 – August 31, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
July 10, 2022
AddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2022
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2022 – July 31, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
June 12, 2022
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – June 30, 2022
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2022 – May 31, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 24, 2022
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2022 – April 30, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
March 27, 2022
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
March 13, 2022
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2022 – March 31, 2022
ArchivedPublic Notification Violation without NPDWR Violation
—Public Notice
February 11, 2022
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2022 – February 28, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
January 23, 2022
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2022 – January 31, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
December 19, 2021
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
December 19, 2021
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2021 – December 31, 2021
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2021 – November 30, 2021
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
October 24, 2021
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2021 – October 31, 2021
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
September 24, 2021
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2021 – September 30, 2021
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
August 29, 2021
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2021 – August 31, 2021
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
July 25, 2021
AddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2021 – July 31, 2021
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
June 26, 2021
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2021 – June 30, 2021
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
May 21, 2021
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2021 – May 31, 2021
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 25, 2021
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2021 – April 30, 2021
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2021 – March 31, 2021
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – February 28, 2021
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2021 – January 31, 2021
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2020 – December 31, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
November 19, 2020 – February 10, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2020 – November 30, 2020
ArchivedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2020
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2020 – October 31, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
August 19, 2020 – February 10, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2020 – August 31, 2020
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2020 – July 31, 2020
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2020
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2020 – June 30, 2020
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2020 – May 31, 2020
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2020 – April 30, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
March 18, 2020
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – March 31, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
December 20, 2019 – February 10, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – October 31, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 12, 2019
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
July 12, 2019
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
July 12, 2019
AddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2019 – July 25, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2019 – July 31, 2019
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
May 15, 2019
AddressedFailure To Address Deficiency
Health-basedGroundwater Rule
May 15, 2019
AddressedFailure To Address Deficiency
Health-basedGroundwater Rule
May 15, 2019
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
April 26, 2019 – February 10, 2021
ResolvedFailure to Consult with State
—Groundwater Rule
February 17, 2019
AddressedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2018 – August 15, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2018 – September 30, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 27, 2018 – March 28, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 3, 2018 – March 28, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2018 – March 31, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 27, 2018 – September 25, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 3, 2017
AddressedTreatment Technique, Level 2 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
November 26, 2017
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
September 21, 2017 – March 27, 2018
ResolvedTreatment Technique, Level 1 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
September 10, 2017
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
June 25, 2017 – March 27, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2017 – June 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2017 – March 31, 2017
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 16, 2016 – February 10, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2016 – December 31, 2016
ResolvedTreatment Technique, Level 2 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
September 25, 2016
AddressedMonitoring, Source Water (GWR)
—E. COLI
August 28, 2016 – January 4, 2019
ResolvedMonitoring, Source Water (GWR)
—E. COLI
April 30, 2016 – July 5, 2016
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 27, 2016 – February 10, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 3, 2016 – June 20, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 27, 2016 – February 10, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 27, 2016 – February 10, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 27, 2016 – February 10, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 23, 2015 – March 27, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 23, 2015 – March 27, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 23, 2015 – March 27, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 23, 2015 – March 27, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 23, 2015 – March 27, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 18, 2015 – February 10, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 15, 2015 – February 10, 2021
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2015 – November 30, 2015
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 15, 2015 – March 27, 2018
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
October 15, 2015 – March 9, 2018
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
October 15, 2015 – October 3, 2017
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
October 15, 2015 – October 25, 2017
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
October 15, 2015 – October 3, 2017
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
October 15, 2015 – April 10, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 15, 2015 – March 27, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 15, 2015 – March 27, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 15, 2015 – March 27, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 15, 2015 – March 27, 2018
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
July 20, 2015 – August 9, 2017
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
July 20, 2015 – August 9, 2017
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
July 20, 2015 – August 9, 2017
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
July 20, 2015 – August 9, 2017
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
July 20, 2015 – April 10, 2018
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2015 – April 30, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2015 – March 31, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2014 – December 31, 2014
ResolvedMonitoring, Source Water (GWR)
—E. COLI
November 23, 2014 – February 23, 2015
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
November 1, 2014 – November 30, 2014
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 2014 – November 30, 2014
ResolvedMonitoring, Source Water (GWR)
—E. COLI
October 31, 2014 – June 11, 2015
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 2014 – October 31, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2014 – September 30, 2014
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2014 – June 8, 2014
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 12, 2013
UnaddressedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2013 – December 31, 2013
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2013 – June 8, 2014
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 26, 2013
UnaddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2013 – June 8, 2014
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 20, 2013
UnaddressedPublic Notification Violation for NPDWR Violation
—Public Notice
January 18, 2013
UnaddressedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2012 – December 31, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2012 – November 30, 2012
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 28, 2012
UnaddressedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2012 – June 30, 2012
ResolvedMonitoring, Source Water (GWR)
—E. COLI
May 31, 2012 – July 10, 2012
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
May 1, 2012 – May 31, 2012
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 21, 2012 – March 21, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2011 – December 31, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2011 – November 30, 2011
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 23, 2011 – February 27, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2011 – October 31, 2011
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 18, 2011 – February 27, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2011 – September 30, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2011 – August 31, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2011 – July 31, 2011
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 19, 2011 – February 27, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2011 – February 28, 2011
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 6, 2011 – February 27, 2012
ResolvedMonitoring, Regular
—Asbestos
January 1, 2011 – December 31, 2013
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2010 – August 6, 2013
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2010 – September 4, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2010 – September 30, 2010
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
August 1, 2010 – August 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2010 – May 31, 2010
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
November 1, 2009 – November 30, 2009
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
November 1, 2009 – November 30, 2009
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
July 1, 2002 – August 13, 2002
ArchivedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
August 1, 2000 – August 31, 2000
ResolvedNotification, State
—Coliform (TCR)
August 1, 2000 – August 31, 2000
ResolvedMonitoring, Regular
—Toxaphene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—2,4-D
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—LASSO
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Atrazine
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—OXAMYL
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Heptachlor
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Dinoseb
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Chlordane
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Simazine
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Glyphosate
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Dalapon
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Endrin
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Atrazine
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Endothall
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Simazine
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Carbofuran
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—2,4,5-TP
October 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Chlordane
October 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Dalapon
October 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Diquat
October 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Carbofuran
October 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
October 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Atrazine
October 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
October 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Pentachlorophenol
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Chlordane
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Endothall
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—2,4,5-TP
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Dinoseb
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Heptachlor
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—OXAMYL
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Atrazine
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Benzo(a)pyrene
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—LASSO
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Carbofuran
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Picloram
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—2,4-D
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Heptachlor epoxide
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Endrin
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—BHC-GAMMA
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Dalapon
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Glyphosate
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Simazine
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Methoxychlor
July 1, 1993 – September 30, 1993
ResolvedMonitoring, Regular
—Toxaphene
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Heptachlor epoxide
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—LASSO
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Carbofuran
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Picloram
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Atrazine
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Heptachlor
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Dinoseb
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—2,4,5-TP
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Endothall
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Chlordane
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Pentachlorophenol
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Methoxychlor
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Simazine
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Glyphosate
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—2,4-D
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—BHC-GAMMA
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Endrin
April 1, 1993 – June 30, 1993
ResolvedMonitoring, Regular
—Endrin
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Toxaphene
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Dalapon
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Diquat
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Simazine
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Endothall
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Dinoseb
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Heptachlor
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—OXAMYL
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Atrazine
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Picloram
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Carbofuran
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—LASSO
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 1993 – March 31, 1993
ResolvedMonitoring, Regular
—2,4-D
January 1, 1993 – March 31, 1993
Resolved
Archived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yetAddressed corrective action reported, pending final confirmationResolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| March 1, 2026 – March 31, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2026 – February 28, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2026 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| January 1, 2026 – January 31, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2025 – December 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2025 – November 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2025 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Addressed |
| October 1, 2025 – October 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2025 – September 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 28, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| August 1, 2025 – August 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Addressed |
| July 1, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| June 6, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| June 6, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| June 1, 2025 – June 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2025 – May 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 26, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| April 1, 2025 – April 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 21, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 1, 2025 – March 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 21, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| February 1, 2025 – February 28, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2025 – January 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 22, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| December 20, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| November 8, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| October 17, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Addressed |
| October 17, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Addressed |
| October 1, 2024 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Addressed |
| September 20, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| September 1, 2024 – September 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 23, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 19, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 1, 2024 – July 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Addressed |
| June 23, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| June 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| June 1, 2024 – June 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2024 – May 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 21, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| April 1, 2024 – April 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 21, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 3, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 1, 2024 – March 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2024 – February 29, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 21, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| January 1, 2024 – January 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 31, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| December 1, 2023 – December 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 5, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| November 5, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| November 1, 2023 – November 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2023 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Addressed |
| October 1, 2023 – October 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2023 – September 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 27, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| August 1, 2023 – August 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 30, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 1, 2023 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Addressed |
| July 1, 2023 – July 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 23, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| June 1, 2023 – June 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 21, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| May 1, 2023 – May 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 16, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| April 1, 2023 – April 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 19, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 26, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| February 1, 2023 – February 28, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 29, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| January 8, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| January 1, 2023 – January 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2022 – December 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 20, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| November 1, 2022 – November 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 23, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| October 23, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| October 1, 2022 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Addressed |
| October 1, 2022 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| October 1, 2022 – October 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2022 – September 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 27, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| August 7, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| August 1, 2022 – August 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 10, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 1, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Addressed |
| July 1, 2022 – July 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 12, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| June 1, 2022 – June 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2022 – May 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 24, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| April 1, 2022 – April 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 27, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 13, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 1, 2022 – March 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 11, 2022 | Public Notification Violation without NPDWR Violation | Public Notice | — | Addressed |
| February 1, 2022 – February 28, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 23, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| January 1, 2022 – January 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 19, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| December 19, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| December 1, 2021 – December 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2021 – November 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| October 1, 2021 – October 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| September 1, 2021 – September 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 29, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| August 1, 2021 – August 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 25, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 1, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Addressed |
| July 1, 2021 – July 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 26, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| June 1, 2021 – June 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 21, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| May 1, 2021 – May 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 25, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| April 1, 2021 – April 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2021 – March 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2021 – February 28, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2021 – January 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2020 – December 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 19, 2020 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2020 – November 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2020 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Addressed |
| October 1, 2020 – October 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 19, 2020 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2020 – August 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2020 – July 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2020 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Addressed |
| June 1, 2020 – June 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2020 – May 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2020 – April 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 18, 2020 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 20, 2019 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2019 – October 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 12, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 12, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 12, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 1, 2019 – July 25, 2019 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2019 – July 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 15, 2019 | Failure To Address Deficiency | Groundwater Rule | Health-based | Addressed |
| May 15, 2019 | Failure To Address Deficiency | Groundwater Rule | Health-based | Addressed |
| May 15, 2019 | Failure To Address Deficiency | Groundwater Rule | Health-based | Addressed |
| April 26, 2019 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| February 17, 2019 | Failure to Consult with State | Groundwater Rule | — | Addressed |
| October 1, 2018 – August 15, 2019 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2018 – September 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 27, 2018 – March 28, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 3, 2018 – March 28, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 1, 2018 – March 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 27, 2018 – September 25, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| December 3, 2017 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| November 26, 2017 | Treatment Technique, Level 2 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Addressed |
| September 21, 2017 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 10, 2017 | Treatment Technique, Level 1 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Addressed |
| June 25, 2017 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| June 1, 2017 – June 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2017 – March 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 16, 2016 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| December 1, 2016 – December 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 25, 2016 | Treatment Technique, Level 2 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Addressed |
| August 28, 2016 – January 4, 2019 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| April 30, 2016 – July 5, 2016 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| April 27, 2016 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 3, 2016 – June 20, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 27, 2016 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 27, 2016 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 27, 2016 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 23, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 23, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 23, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 23, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 23, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 18, 2015 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 15, 2015 – February 10, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2015 – November 30, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 15, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 15, 2015 – March 9, 2018 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| October 15, 2015 – October 3, 2017 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| October 15, 2015 – October 25, 2017 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| October 15, 2015 – October 3, 2017 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| October 15, 2015 – April 10, 2018 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| October 15, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 15, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 15, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 15, 2015 – March 27, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 20, 2015 – August 9, 2017 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| July 20, 2015 – August 9, 2017 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| July 20, 2015 – August 9, 2017 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| July 20, 2015 – August 9, 2017 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| July 20, 2015 – April 10, 2018 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| April 1, 2015 – April 30, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 2015 – March 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2014 – December 31, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 23, 2014 – February 23, 2015 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| November 1, 2014 – November 30, 2014 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2014 – November 30, 2014 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| October 31, 2014 – June 11, 2015 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| October 1, 2014 – October 31, 2014 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2014 – September 30, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2014 – June 8, 2014 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| December 12, 2013 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| December 1, 2013 – December 31, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2013 – June 8, 2014 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 26, 2013 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| July 1, 2013 – June 8, 2014 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 20, 2013 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| January 18, 2013 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| December 1, 2012 – December 31, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2012 – November 30, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 28, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| June 1, 2012 – June 30, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 31, 2012 – July 10, 2012 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| May 1, 2012 – May 31, 2012 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| March 21, 2012 – March 21, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| December 1, 2011 – December 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2011 – November 30, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 23, 2011 – February 27, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2011 – October 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 18, 2011 – February 27, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 1, 2011 – September 30, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2011 – August 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2011 – July 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 19, 2011 – February 27, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| February 1, 2011 – February 28, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 6, 2011 – February 27, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Asbestos | — | Resolved |
| October 1, 2010 – August 6, 2013 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| October 1, 2010 – September 4, 2012 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2010 – September 30, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2010 – August 31, 2010 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2010 – May 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2009 – November 30, 2009 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| November 1, 2009 – November 30, 2009 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2002 – August 13, 2002 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Archived |
| August 1, 2000 – August 31, 2000 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| August 1, 2000 – August 31, 2000 | Notification, State | Coliform (TCR) | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| October 1, 1993 – December 31, 1993 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| October 1, 1993 – December 31, 1993 | Monitoring, Regular | Chlordane | — | Resolved |
| October 1, 1993 – December 31, 1993 | Monitoring, Regular | Dalapon | — | Resolved |
| October 1, 1993 – December 31, 1993 | Monitoring, Regular | Diquat | — | Resolved |
| October 1, 1993 – December 31, 1993 | Monitoring, Regular | Carbofuran | — | Resolved |
| October 1, 1993 – December 31, 1993 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| October 1, 1993 – December 31, 1993 | Monitoring, Regular | Atrazine | — | Resolved |
| October 1, 1993 – December 31, 1993 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Chlordane | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Endothall | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Dinoseb | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Heptachlor | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | OXAMYL | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Atrazine | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | LASSO | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Carbofuran | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Picloram | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | 2,4-D | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Endrin | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Dalapon | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Glyphosate | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Simazine | — | Resolved |
| July 1, 1993 – September 30, 1993 | Monitoring, Regular | Methoxychlor | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Toxaphene | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | LASSO | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Carbofuran | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Picloram | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Atrazine | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Heptachlor | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Dinoseb | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Endothall | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Chlordane | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Methoxychlor | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Simazine | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Glyphosate | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | 2,4-D | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| April 1, 1993 – June 30, 1993 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 1993 – March 31, 1993 | Monitoring, Regular | 2,4-D | — | Resolved |
Archived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yetAddressed corrective action reported, pending final confirmationResolved addressed and confirmed by the state
Enforcement actions
- May 9, 2013State Compliance achieved1 linked violation
- June 18, 2010State Violation/Reminder Notice2 linked violations
- June 18, 2010State Public Notification requested1 linked violation
- January 31, 2010State Compliance achieved1 linked violation
- January 13, 2010State Public Notification received5 linked violations
- January 5, 2010State Public Notification requested1 linked violation
- January 5, 2010State Violation/Reminder Notice2 linked violations
- December 31, 2009State Compliance achieved1 linked violation
- December 29, 2009State Public Notification requested1 linked violation
- December 29, 2009State Violation/Reminder Notice1 linked violation
- September 24, 2007State Violation/Reminder Notice1 linked violation
- September 24, 2007State Public Notification requested2 linked violations
- September 12, 2002State Compliance achieved4 linked violations
- July 25, 2000State Public Notification requested11 linked violations
- June 30, 2000Federal Compliance achieved2 linked violations
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved2 linked violations
- March 31, 1999State Compliance achieved2 linked violations
- March 31, 1999State Compliance achieved2 linked violations
- March 31, 1999State Compliance achieved2 linked violations
- March 31, 1999State Compliance achieved2 linked violations
- March 31, 1999State Compliance achieved3 linked violations
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved2 linked violations
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved2 linked violations
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved2 linked violations
- March 31, 1999State Compliance achieved3 linked violations
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved23 linked violations
- March 31, 1999State Compliance achieved23 linked violations
- March 31, 1999State Compliance achieved86 linked violations
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- March 31, 1999State Compliance achieved1 linked violation
- August 10, 1990State Violation/Reminder Notice5 linked violations
Common questions
Is EL SHADDAI WATER CO OP required to publish a Consumer Confidence Report?
- Yes. EL SHADDAI WATER CO OP is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is EL SHADDAI WATER CO OP’s next Consumer Confidence Report due?
- EL SHADDAI WATER CO OP’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does EL SHADDAI WATER CO OP have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 7 open health-based violations for EL SHADDAI WATER CO OP, alongside 77 other open items.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
MIERA, WALLY
505-865-4565
LOS LUNAS, NM 87031