SOCORRO, NM · Sierra County
DESERTAIRE WATER COMPANY Water System
Consumer Confidence Report status
DESERTAIRE WATER COMPANY must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 2 items for DESERTAIRE WATER COMPANY that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace New Mexico’s official records. Always confirm current status with New Mexico before making decisions based on this information.
System facts
- System ID (PWSID)
- NM3520027
- System type
- Community Water System
- Population served
- 45
- Service connections
- 21
- Ownership
- privately owned
- Water source
- groundwater (wells)
DESERTAIRE WATER COMPANY is one of 667 community water systems in New Mexico in the 500 or fewer people size category, serving 45 people from groundwater.
As of August 1, 2026, its federal record holds 105 entries between 1992 and 2026, of which 2 remain open; none are health-based.
Of the 105, 53 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Total Coliform Rules, the Public Notice Rule and Revised PN Rule, and the Groundwater Rule.
Violation history
Failure to Consult with State
—Groundwater Rule
January 11, 2026 – February 20, 2026
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 28, 2025 – November 14, 2025
ResolvedMaximum Contaminant Level Violation, Average
Health-basedFluoride
January 1, 2025 – March 31, 2025
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2024 – September 3, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 9, 2024 – June 6, 2025
ResolvedLead Consumer Notice
—Lead and Copper Rule
September 29, 2023 – December 8, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 6, 2022 – August 26, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 23, 2022 – July 26, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 2, 2022 – August 11, 2025
ResolvedMaximum Contaminant Level Violation, Average
Health-basedFluoride
January 1, 2022 – March 31, 2022
ArchivedMaximum Contaminant Level Violation, Average
Health-basedFluoride
October 1, 2021 – December 31, 2021
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – January 28, 2022
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
May 16, 2021 – May 11, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 7, 2021 – November 1, 2021
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2021 – December 31, 2021
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2021 – December 31, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2020 – May 26, 2020
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 9, 2020 – March 9, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 9, 2020 – March 9, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 9, 2020 – March 9, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 9, 2020 – March 9, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 9, 2020 – March 9, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – March 31, 2020
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 24, 2020 – March 8, 2022
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 24, 2020 – March 8, 2023
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 24, 2020 – March 8, 2022
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 24, 2020 – March 8, 2022
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 24, 2020 – June 9, 2023
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 24, 2020 – April 14, 2023
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 24, 2020 – March 8, 2022
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 24, 2020 – March 8, 2022
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2020 – December 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2020 – March 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2020 – March 31, 2020
ResolvedMonitoring, Regular
—Asbestos
January 1, 2020 – December 31, 2022
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2019 – November 30, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2019 – December 31, 2019
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – October 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2019 – December 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2019 – December 31, 2019
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2019 – September 30, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 5, 2019 – August 5, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2019 – February 28, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2019 – January 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2018 – November 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2018 – October 31, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 30, 2018 – August 2, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 19, 2018 – August 2, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2018 – June 30, 2018
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 3, 2018 – August 2, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 3, 2018 – August 2, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 3, 2018 – August 2, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 3, 2018 – August 2, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2018 – April 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2018 – March 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2018 – January 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2017 – December 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2017 – November 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2017 – October 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2017 – September 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2017 – August 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2017 – July 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2017 – June 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2017 – May 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2017 – April 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2017 – March 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2017 – February 28, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2016 – December 31, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2016 – November 30, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2016 – October 31, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2016 – September 30, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2016 – August 31, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2016 – July 31, 2016
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
June 2, 2016 – March 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2016 – June 30, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2016 – May 31, 2016
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 30, 2015 – January 30, 2020
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2015 – June 30, 2015
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 24, 2014 – October 28, 2021
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2014 – September 30, 2014
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 20, 2013
UnaddressedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2013 – June 30, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2012 – June 30, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2012 – June 30, 2012
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 10, 2010
UnaddressedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2010 – September 30, 2010
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
September 1, 2009 – September 30, 2009
ResolvedMaximum Contaminant Level Violation, Average
Health-basedFluoride
January 1, 2005 – March 31, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1994 – November 30, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1992 – August 31, 1992
Resolved
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 11, 2026 – February 20, 2026 | Failure to Consult with State | Groundwater Rule | — | Resolved |
| June 28, 2025 – November 14, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2025 – March 31, 2025 | Maximum Contaminant Level Violation, Average | Fluoride | Health-based | Archived |
| July 1, 2024 – September 3, 2024 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| May 9, 2024 – June 6, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 29, 2023 – December 8, 2025 | Lead Consumer Notice | Lead and Copper Rule | — | Resolved |
| August 6, 2022 – August 26, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 23, 2022 – July 26, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 2, 2022 – August 11, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2022 – March 31, 2022 | Maximum Contaminant Level Violation, Average | Fluoride | Health-based | Archived |
| October 1, 2021 – December 31, 2021 | Maximum Contaminant Level Violation, Average | Fluoride | Health-based | Archived |
| July 1, 2021 – January 28, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| May 16, 2021 – May 11, 2023 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 7, 2021 – November 1, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2021 – December 31, 2021 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| January 1, 2021 – December 31, 2021 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| April 1, 2020 – May 26, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 9, 2020 – March 9, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 9, 2020 – March 9, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 9, 2020 – March 9, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 9, 2020 – March 9, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 9, 2020 – March 9, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 24, 2020 – March 8, 2022 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 24, 2020 – March 8, 2023 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 24, 2020 – March 8, 2022 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 24, 2020 – March 8, 2022 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 24, 2020 – June 9, 2023 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 24, 2020 – April 14, 2023 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 24, 2020 – March 8, 2022 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 24, 2020 – March 8, 2022 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 1, 2020 – December 31, 2020 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Asbestos | — | Archived |
| November 1, 2019 – November 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 1, 2019 – October 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2019 – December 31, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| September 1, 2019 – September 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 5, 2019 – August 5, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| February 1, 2019 – February 28, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2019 – January 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2018 – November 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2018 – October 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 30, 2018 – August 2, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 19, 2018 – August 2, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| June 1, 2018 – June 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 3, 2018 – August 2, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 3, 2018 – August 2, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 3, 2018 – August 2, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 3, 2018 – August 2, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2018 – April 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2018 – March 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2018 – January 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2017 – December 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2017 – November 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2017 – October 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2017 – September 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2017 – August 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2017 – July 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2017 – June 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2017 – May 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2017 – April 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2017 – March 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2017 – February 28, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2016 – December 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2016 – November 30, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2016 – October 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2016 – September 30, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2016 – August 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2016 – July 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 2, 2016 – March 31, 2018 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2016 – June 30, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2016 – May 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 30, 2015 – January 30, 2020 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2015 – June 30, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 24, 2014 – October 28, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2014 – September 30, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 20, 2013 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| April 1, 2013 – June 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2012 – June 30, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2012 – June 30, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 10, 2010 | Public Notification Violation for NPDWR Violation | Public Notice | — | Unaddressed |
| September 1, 2010 – September 30, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2009 – September 30, 2009 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2005 – March 31, 2005 | Maximum Contaminant Level Violation, Average | Fluoride | Health-based | Resolved |
| November 1, 1994 – November 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 1992 – August 31, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yet
Enforcement actions
- November 14, 2025State Compliance achieved417 linked violations
- September 15, 2004State Public Notification received4 linked violations
- March 19, 2004State Public Notification received5 linked violations
- July 29, 2003State Public Notification requested12 linked violations
- May 16, 2003State Public Notification requested5 linked violations
- January 14, 2003State Public Notification requested5 linked violations
- February 27, 1996State Public Notification received32 linked violations
- October 29, 1992State Violation/Reminder Notice3 linked violations
- September 11, 1992State Violation/Reminder Notice2 linked violations
- December 27, 1991State Public Notification requested3 linked violations
- December 27, 1991State Violation/Reminder Notice2 linked violations
Common questions
Is DESERTAIRE WATER COMPANY required to publish a Consumer Confidence Report?
- Yes. DESERTAIRE WATER COMPANY is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is DESERTAIRE WATER COMPANY’s next Consumer Confidence Report due?
- DESERTAIRE WATER COMPANY’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does DESERTAIRE WATER COMPANY have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 2 items for DESERTAIRE WATER COMPANY that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
SAGER, SALEM
Phone not on record
SOCORRO, NM 87801