HASTINGS, NE · Adams County
PROSSER, VILLAGE OF Water System
Consumer Confidence Report status
PROSSER, VILLAGE OF must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for PROSSER, VILLAGE OF.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Nebraska’s official records. Always confirm current status with Nebraska before making decisions based on this information.
System facts
- System ID (PWSID)
- NE3120372
- System type
- Community Water System
- Population served
- 76
- Service connections
- 52
- Ownership
- local government
- Water source
- groundwater (wells)
PROSSER, VILLAGE OF is one of 568 community water systems in Nebraska in the 500 or fewer people size category, serving 76 people from groundwater.
As of August 1, 2026, its federal record holds 37 entries between 1991 and 2025, all of which EPA lists as closed.
Of the 37, 3 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves inorganic chemicals, the Total Coliform Rules, and the Groundwater Rule.
Violation history
Maximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2025 – June 9, 2025
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
October 1, 2024 – November 25, 2024
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2024 – June 30, 2024
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
January 1, 2024 – February 25, 2024
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
October 1, 2023 – December 20, 2023
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
July 1, 2023 – September 30, 2023
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
July 1, 2023 – September 30, 2023
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2023 – June 30, 2023
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2023 – June 30, 2023
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2023 – June 30, 2023
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2023 – June 30, 2023
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2023 – March 31, 2023
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2021 – May 18, 2021
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2021 – June 30, 2021
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
October 1, 2020 – December 31, 2020
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2020 – June 30, 2020
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2020 – June 30, 2020
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2020 – June 30, 2020
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 5, 2019 – June 15, 2019
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2019 – June 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2017 – April 30, 2017
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
September 23, 2016 – November 2, 2016
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
July 1, 2016 – September 30, 2016
ResolvedFailure to Consult with State
—Groundwater Rule
June 25, 2016 – November 2, 2016
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2016 – June 30, 2016
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
October 1, 2015 – December 31, 2015
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2015 – June 30, 2015
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
October 1, 2014 – December 31, 2014
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
July 1, 2014 – September 30, 2014
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
April 1, 2014 – June 30, 2014
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
January 1, 2014 – March 31, 2014
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
October 1, 2013 – December 31, 2013
ResolvedMaximum Contaminant Level Violation, Single Sample
Health-basedNitrate-Nitrite
July 1, 2013 – September 30, 2013
ResolvedMaximum Contaminant Level Violation, Average
Health-basedNitrate-Nitrite
January 1, 2013 – March 31, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2012 – December 31, 2012
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
January 1, 1992 – January 31, 1992
ArchivedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 1991 – July 31, 1991
Archived
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| April 1, 2025 – June 9, 2025 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| October 1, 2024 – November 25, 2024 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2024 – June 30, 2024 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| January 1, 2024 – February 25, 2024 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| October 1, 2023 – December 20, 2023 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| July 1, 2023 – September 30, 2023 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| July 1, 2023 – September 30, 2023 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2023 – June 30, 2023 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2023 – June 30, 2023 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2023 – June 30, 2023 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2023 – June 30, 2023 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| April 1, 2021 – May 18, 2021 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2021 – June 30, 2021 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| October 1, 2020 – December 31, 2020 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2020 – June 30, 2020 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2020 – June 30, 2020 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2020 – June 30, 2020 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| June 5, 2019 – June 15, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2019 – June 30, 2019 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2017 – April 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 23, 2016 – November 2, 2016 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| July 1, 2016 – September 30, 2016 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| June 25, 2016 – November 2, 2016 | Failure to Consult with State | Groundwater Rule | — | Resolved |
| April 1, 2016 – June 30, 2016 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| October 1, 2015 – December 31, 2015 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2015 – June 30, 2015 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| October 1, 2014 – December 31, 2014 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| July 1, 2014 – September 30, 2014 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| April 1, 2014 – June 30, 2014 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| January 1, 2014 – March 31, 2014 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| October 1, 2013 – December 31, 2013 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| July 1, 2013 – September 30, 2013 | Maximum Contaminant Level Violation, Single Sample | Nitrate-Nitrite | Health-based | Resolved |
| January 1, 2013 – March 31, 2013 | Maximum Contaminant Level Violation, Average | Nitrate-Nitrite | Health-based | Resolved |
| December 1, 2012 – December 31, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1992 – January 31, 1992 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
| July 1, 1991 – July 31, 1991 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- June 9, 2025State Compliance achieved1 linked violation
- May 13, 2025State Public Notification received1 linked violation
- May 8, 2025State Violation/Reminder Notice1 linked violation
- May 8, 2025State Public Notification requested1 linked violation
- November 25, 2024State Compliance achieved1 linked violation
- October 27, 2024State Public Notification received1 linked violation
- October 24, 2024State Public Notification requested1 linked violation
- October 24, 2024State Violation/Reminder Notice1 linked violation
- August 12, 2024State Compliance achieved1 linked violation
- April 25, 2024State Public Notification requested1 linked violation
- April 25, 2024State Violation/Reminder Notice1 linked violation
- April 22, 2024State Public Notification received1 linked violation
- February 25, 2024State Compliance achieved1 linked violation
- February 12, 2024State Public Notification received1 linked violation
- February 6, 2024State Public Notification requested1 linked violation
- February 6, 2024State Violation/Reminder Notice1 linked violation
- December 20, 2023State Compliance achieved3 linked violations
- November 30, 2023State Compliance achieved5 linked violations
- November 30, 2023State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- November 30, 2023State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- November 9, 2023State Public Notification received1 linked violation
- November 6, 2023State Public Notification requested2 linked violations
- November 6, 2023State Violation/Reminder Notice1 linked violation
- August 7, 2023State Public Notification received1 linked violation
- August 3, 2023State Violation/Reminder Notice1 linked violation
- August 3, 2023State Violation/Reminder Notice2 linked violations
- August 3, 2023State Public Notification requested1 linked violation
- July 5, 2023State Public Notification received1 linked violation
- June 20, 2023State Public Notification received1 linked violation
- June 8, 2023State Violation/Reminder Notice1 linked violation
- June 8, 2023State Public Notification requested1 linked violation
- May 26, 2023State Public Notification requested1 linked violation
- May 26, 2023State Violation/Reminder Notice1 linked violation
- May 15, 2023State Public Notification received1 linked violation
- May 15, 2023State Public Notification received1 linked violation
- May 15, 2023State Violation/Reminder Notice1 linked violation
- May 15, 2023State Public Notification requested1 linked violation
- May 13, 2023State Public Notification received1 linked violation
- May 12, 2023State Public Notification requested1 linked violation
- May 12, 2023State Violation/Reminder Notice1 linked violation
- May 12, 2023State Violation/Reminder Notice2 linked violations
- May 12, 2023State Public Notification requested1 linked violation
- March 4, 2022State Public Notification received4 linked violations
- March 3, 2022State Public Notification requested5 linked violations
- February 27, 2022State Compliance achieved36 linked violations
- February 23, 2022State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- February 23, 2022State Violation/Reminder Notice10 linked violations
- August 2, 2021State Compliance achieved3 linked violations
- May 10, 2021State Public Notification received2 linked violations
- November 18, 2020State Public Notification received6 linked violations
- July 13, 2020State Compliance achieved4 linked violations
- June 25, 2020State Violation/Reminder Notice1 linked violation
- May 26, 2020State Public Notification received1 linked violation
- May 26, 2020State Public Notification received1 linked violation
- May 14, 2020State Public Notification requested1 linked violation
- May 14, 2020State Violation/Reminder Notice1 linked violation
- May 14, 2020State Public Notification requested1 linked violation
- May 14, 2020State Violation/Reminder Notice1 linked violation
- September 18, 2019State Compliance achieved1 linked violation
- August 13, 2019State Violation/Reminder Notice1 linked violation
- June 15, 2019State Compliance achieved1 linked violation
- June 3, 2019State Violation/Reminder Notice1 linked violation
- June 3, 2019State Public Notification requested1 linked violation
- December 6, 2017State Compliance achieved15 linked violations
- June 29, 2017State Compliance achieved1 linked violation
- May 25, 2017State Public Notification received1 linked violation
- May 8, 2017State Public Notification requested1 linked violation
- May 8, 2017State Violation/Reminder Notice1 linked violation
- November 21, 2016State Public Notification received1 linked violation
- November 2, 2016State Compliance achieved1 linked violation
- November 2, 2016State Compliance achieved1 linked violation
- October 27, 2016State Violation/Reminder Notice1 linked violation
- October 27, 2016State Violation/Reminder Notice1 linked violation
- October 27, 2016State Public Notification requested1 linked violation
- October 27, 2016State Public Notification requested1 linked violation
- August 17, 2016State Violation/Reminder Notice1 linked violation
- August 17, 2016State Public Notification requested1 linked violation
- July 15, 2016State Public Notification received1 linked violation
- June 22, 2016State Administrative/Compliance Order without penalty issued10 linked violations
- May 12, 2016State Public Notification requested2 linked violations
- February 29, 2016State Public Notification received2 linked violations
- January 21, 2016State Public Notification requested1 linked violation
- November 30, 2015State Public Notification received1 linked violation
- November 7, 2015State Public Notification requested1 linked violation
- August 10, 2015State Violation/Reminder Notice2 linked violations
- August 3, 2015State Public Notification received2 linked violations
- May 20, 2015State Violation/Reminder Notice2 linked violations
- January 21, 2015State Violation/Reminder Notice3 linked violations
- November 12, 2014State Public Notification received3 linked violations
- September 23, 2014State Public Notification received2 linked violations
- April 30, 2014State Public Notification requested8 linked violations
- January 31, 2014State Public Notification received2 linked violations
- November 21, 2013State Public Notification requested1 linked violation
- November 21, 2013State Violation/Reminder Notice1 linked violation
- August 19, 2013State Public Notification received1 linked violation
- August 13, 2013State Public Notification requested2 linked violations
- May 10, 2013State Violation/Reminder Notice2 linked violations
- May 10, 2013State Public Notification requested2 linked violations
- February 27, 2013State Public Notification requested4 linked violations
- February 27, 2013State Violation/Reminder Notice1 linked violation
- February 4, 2013State Public Notification received11 linked violations
- January 11, 2013State Violation/Reminder Notice6 linked violations
- January 31, 2006State Compliance achieved2 linked violations
- April 10, 1992State Formal Notice of Violation issued4 linked violations
- August 23, 1991State Violation/Reminder Notice2 linked violations
Common questions
Is PROSSER, VILLAGE OF required to publish a Consumer Confidence Report?
- Yes. PROSSER, VILLAGE OF is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is PROSSER, VILLAGE OF’s next Consumer Confidence Report due?
- PROSSER, VILLAGE OF’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does PROSSER, VILLAGE OF have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for PROSSER, VILLAGE OF.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
FOX, STEVE
402-984-3464
HASTINGS, NE 68901