MT. PLEASANT, NC · Cabarrus County
GREEN OAKS S/D Water System
Consumer Confidence Report status
GREEN OAKS S/D must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 item for GREEN OAKS S/D that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace North Carolina’s official records. Always confirm current status with North Carolina before making decisions based on this information.
System facts
- System ID (PWSID)
- NC0113158
- System type
- Community Water System
- Population served
- 46
- Service connections
- 15
- Ownership
- privately owned
- Water source
- groundwater (wells)
GREEN OAKS S/D is one of 4,942 community water systems in North Carolina in the 500 or fewer people size category, serving 46 people from groundwater.
As of August 1, 2026, its federal record holds 81 entries between 1991 and 2025, of which 1 remains open; none are health-based.
Of the 81, 64 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, volatile organic chemicals, and inorganic chemicals.
Violation history
Monitoring, Source Water (GWR)
—E. COLI
August 12, 2025
AddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025 – September 4, 2025
ResolvedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024 – November 3, 2024
ResolvedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024 – November 3, 2024
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – December 6, 2024
ResolvedLead Consumer Notice
—Lead and Copper Rule
January 1, 2023 – March 15, 2023
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2020 – October 27, 2020
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2014 – July 25, 2014
ResolvedMonitoring, Regular
—Atrazine
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Cadmium
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Chromium
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—CYANIDE
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Fluoride
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Mercury
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Nickel
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Selenium
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Endrin
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Dalapon
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Simazine
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Picloram
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—LASSO
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—2,4-D
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Chlordane
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Arsenic
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Barium
January 1, 2014 – December 31, 2016
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2012 – September 10, 2012
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2011 – September 4, 2011
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2008 – March 26, 2009
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2007 – March 26, 2009
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2007 – March 26, 2009
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 12, 2007 – September 16, 2010
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Benzene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Toluene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Styrene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2006 – December 31, 2006
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2005 – March 26, 2009
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2005 – December 31, 2005
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
August 21, 2005 – April 17, 2010
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
July 10, 2005 – April 17, 2010
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
April 2, 2005 – April 17, 2010
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
January 1, 2005 – October 6, 2008
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
July 12, 2004 – April 17, 2010
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 1993 – November 21, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1991 – March 31, 1991
Archived
Addressed corrective action reported, pending final confirmationResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| August 12, 2025 | Monitoring, Source Water (GWR) | E. COLI | — | Addressed |
| July 1, 2025 – September 4, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| October 17, 2024 – November 3, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Resolved |
| October 17, 2024 – November 3, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Resolved |
| July 1, 2024 – December 6, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2023 – March 15, 2023 | Lead Consumer Notice | Lead and Copper Rule | — | Resolved |
| July 1, 2020 – October 27, 2020 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2014 – July 25, 2014 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | CYANIDE | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Nickel | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Barium | — | Resolved |
| July 1, 2012 – September 10, 2012 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2011 – September 4, 2011 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2008 – March 26, 2009 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| October 1, 2007 – March 26, 2009 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2007 – March 26, 2009 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| May 12, 2007 – September 16, 2010 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| October 1, 2005 – March 26, 2009 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| October 1, 2005 – December 31, 2005 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 21, 2005 – April 17, 2010 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| July 10, 2005 – April 17, 2010 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| April 2, 2005 – April 17, 2010 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2005 – October 6, 2008 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 12, 2004 – April 17, 2010 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| July 1, 1993 – November 21, 1995 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| March 1, 1991 – March 31, 1991 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
Addressed corrective action reported, pending final confirmationResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- October 29, 2025State Public Notification requested1 linked violation
- October 29, 2025State Administrative/Compliance Order without penalty issued1 linked violation
- October 29, 2025State Formal Notice of Violation issued1 linked violation
- September 4, 2025State Compliance achieved1 linked violation
- December 6, 2024State Compliance achieved1 linked violation
- November 14, 2024State Formal Notice of Violation issued1 linked violation
- November 14, 2024State Administrative/Compliance Order without penalty issued1 linked violation
- November 12, 2024State Violation/Reminder Notice2 linked violations
- November 3, 2024State Compliance achieved1 linked violation
- November 3, 2024State Compliance achieved1 linked violation
- March 15, 2023State Compliance achieved1 linked violation
- March 2, 2023State Administrative/Compliance Order without penalty issued1 linked violation
- March 2, 2023State Formal Notice of Violation issued1 linked violation
- October 27, 2020State Compliance achieved1 linked violation
- November 19, 2019State Compliance achieved26 linked violations
- October 20, 2019State Compliance achieved12 linked violations
- May 31, 2017State Administrative/Compliance Order with penalty issued12 linked violations
- April 4, 2017State Administrative/Compliance Order with penalty issued26 linked violations
- February 25, 2017State Public Notification received12 linked violations
- February 25, 2017State Public Notification received26 linked violations
- February 10, 2017State Public Notification requested26 linked violations
- February 10, 2017State Formal Notice of Violation issued26 linked violations
- February 10, 2017State Administrative/Compliance Order without penalty issued26 linked violations
- February 8, 2017State Administrative/Compliance Order without penalty issued12 linked violations
- February 8, 2017State Formal Notice of Violation issued12 linked violations
- February 8, 2017State Public Notification requested12 linked violations
- March 21, 2016State Case dropped1 linked violation
- July 25, 2014State Compliance achieved1 linked violation
- September 10, 2012State Compliance achieved1 linked violation
- September 4, 2011State Compliance achieved1 linked violation
- September 16, 2010State Compliance achieved1 linked violation
- April 17, 2010State Intentional no-action6 linked violations
- April 17, 2010State Compliance achieved6 linked violations
- March 26, 2009State Compliance achieved4 linked violations
- February 18, 2009State Formal Notice of Violation issued1 linked violation
- February 5, 2009State Other1 linked violation
- October 6, 2008State Compliance achieved1 linked violation
- July 9, 2008State Administrative/Compliance Order with penalty issued1 linked violation
- April 9, 2008State Administrative/Compliance Order without penalty issued2 linked violations
- November 30, 2007State Formal Notice of Violation issued1 linked violation
- November 30, 2007State Formal Notice of Violation issued1 linked violation
- March 6, 2007State Formal Notice of Violation issued21 linked violations
- March 6, 2007State Public Notification requested21 linked violations
- January 1, 2007State Compliance achieved21 linked violations
- September 25, 2006State Compliance achieved1 linked violation
- September 25, 2006State Compliance achieved1 linked violation
- September 25, 2006State Compliance achieved1 linked violation
- September 25, 2006State Compliance achieved1 linked violation
- September 21, 2006State Compliance achieved3 linked violations
- August 1, 2006State Compliance achieved1 linked violation
- June 30, 2006State Compliance achieved1 linked violation
- January 31, 2005State Compliance achieved475 linked violations
- December 31, 2004State Compliance achieved1 linked violation
- February 11, 2003State Administrative/Compliance Order with penalty issued3 linked violations
- July 3, 2002State Compliance achieved2 linked violations
- September 28, 2001Federal Complaint for Penalty issued2 linked violations
- February 29, 2000State Compliance achieved1 linked violation
Common questions
Is GREEN OAKS S/D required to publish a Consumer Confidence Report?
- Yes. GREEN OAKS S/D is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is GREEN OAKS S/D’s next Consumer Confidence Report due?
- GREEN OAKS S/D’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does GREEN OAKS S/D have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 item for GREEN OAKS S/D that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
COOK, JR, WILLIAM E
Phone not on record
MT. PLEASANT, NC 28124