MISSOULA, MT · Missoula County
TAMARACK COURT Water System
Consumer Confidence Report status
TAMARACK COURT must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for TAMARACK COURT.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Montana’s official records. Always confirm current status with Montana before making decisions based on this information.
System facts
- System ID (PWSID)
- MT0000368
- System type
- Community Water System
- Population served
- 75
- Service connections
- 26
- Ownership
- privately owned
- Water source
- groundwater (wells)
TAMARACK COURT is one of 1,084 community water systems in Montana in the 500 or fewer people size category, serving 75 people from groundwater.
As of August 1, 2026, its federal record holds 46 entries between 1997 and 2024, all of which EPA lists as closed.
Of the 46, 39 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, the Groundwater Rule, and the Stage 1 Disinfectants and Disinfection Byproducts Rule.
Violation history
Treatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
October 1, 2024 – October 31, 2024
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
July 1, 2024 – July 31, 2024
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
March 1, 2024 – March 31, 2024
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2023 – December 31, 2023
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2023 – June 30, 2023
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2022 – August 31, 2022
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2022 – June 30, 2022
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
July 1, 2020 – July 31, 2020
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2020 – June 30, 2020
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2018 – August 31, 2018
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2014 – August 31, 2014
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
May 1, 2014 – May 31, 2014
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2014 – March 31, 2014
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2013 – December 31, 2013
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2013 – December 31, 2013
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2013 – December 31, 2013
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2013 – December 31, 2013
ResolvedMonitoring, Regular
—Atrazine
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—LASSO
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—2,4-D
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Endrin
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Dalapon
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Simazine
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Picloram
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Aldicarb sulfone
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Aldicarb
January 1, 2011 – December 31, 2013
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
June 1, 2007 – June 30, 2007
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2006 – December 31, 2006
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
June 1, 1997 – June 30, 1997
Resolved
Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| October 1, 2024 – October 31, 2024 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| July 1, 2024 – July 31, 2024 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| March 1, 2024 – March 31, 2024 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| December 1, 2023 – December 31, 2023 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| June 1, 2023 – June 30, 2023 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| August 1, 2022 – August 31, 2022 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| June 1, 2022 – June 30, 2022 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 1, 2020 – July 31, 2020 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| June 1, 2020 – June 30, 2020 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| August 1, 2018 – August 31, 2018 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| August 1, 2014 – August 31, 2014 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| May 1, 2014 – May 31, 2014 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| January 1, 2014 – March 31, 2014 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2013 – December 31, 2013 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2013 – December 31, 2013 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2013 – December 31, 2013 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2013 – December 31, 2013 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Aldicarb | — | Resolved |
| June 1, 2007 – June 30, 2007 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| June 1, 1997 – June 30, 1997 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
Resolved addressed and confirmed by the state
Enforcement actions
- December 14, 2024State Public Notification requested1 linked violation
- December 14, 2024State Violation/Reminder Notice1 linked violation
- December 10, 2024State Compliance achieved1 linked violation
- September 9, 2024State Compliance achieved1 linked violation
- August 21, 2024State Violation/Reminder Notice1 linked violation
- August 21, 2024State Public Notification requested1 linked violation
- May 10, 2024State Compliance achieved1 linked violation
- April 24, 2024State Public Notification requested1 linked violation
- April 24, 2024State Violation/Reminder Notice1 linked violation
- February 8, 2024State Compliance achieved3 linked violations
- February 2, 2024State Public Notification requested1 linked violation
- February 2, 2024State Violation/Reminder Notice1 linked violation
- August 15, 2023State Public Notification received1 linked violation
- August 3, 2023State Compliance achieved9 linked violations
- July 28, 2023State Public Notification requested2 linked violations
- July 28, 2023State Violation/Reminder Notice2 linked violations
- November 9, 2022State Public Notification received1 linked violation
- October 10, 2022State Compliance achieved1 linked violation
- October 7, 2022State Violation/Reminder Notice1 linked violation
- October 7, 2022State Public Notification requested1 linked violation
- August 10, 2022State Public Notification requested1 linked violation
- August 10, 2022State Compliance achieved1 linked violation
- August 10, 2022State Violation/Reminder Notice1 linked violation
- September 11, 2020State Compliance achieved1 linked violation
- September 3, 2020State Compliance achieved1 linked violation
- September 3, 2020State Compliance achieved1 linked violation
- August 19, 2020State Public Notification requested1 linked violation
- August 19, 2020State Violation/Reminder Notice1 linked violation
- July 31, 2020State Public Notification requested1 linked violation
- July 31, 2020State Violation/Reminder Notice1 linked violation
- May 11, 2020State Compliance achieved1 linked violation
- March 13, 2020State Public Notification requested1 linked violation
- March 13, 2020State Violation/Reminder Notice1 linked violation
- October 23, 2019State Violation/Reminder Notice1 linked violation
- October 23, 2019State Public Notification requested1 linked violation
- October 4, 2018State Public Notification received1 linked violation
- September 24, 2018State Compliance achieved1 linked violation
- September 16, 2018State Violation/Reminder Notice1 linked violation
- September 16, 2018State Public Notification requested1 linked violation
- July 26, 2018State Compliance achieved1 linked violation
- July 17, 2018State Violation/Reminder Notice1 linked violation
- June 27, 2018State Compliance achieved1 linked violation
- June 14, 2018State Public Notification requested1 linked violation
- June 14, 2018State Violation/Reminder Notice1 linked violation
- February 8, 2016State Compliance achieved1 linked violation
- January 11, 2016State Public Notification received1 linked violation
- December 18, 2015State Public Notification requested1 linked violation
- December 18, 2015State Violation/Reminder Notice1 linked violation
- November 20, 2015State Public Notification received1 linked violation
- November 9, 2015State Compliance achieved1 linked violation
- October 22, 2015State Public Notification requested1 linked violation
- October 22, 2015State Violation/Reminder Notice1 linked violation
- October 7, 2014State Compliance achieved3 linked violations
- September 22, 2014State Compliance achieved1 linked violation
- September 17, 2014State Public Notification requested1 linked violation
- September 17, 2014State Violation/Reminder Notice1 linked violation
- August 15, 2014State Violation/Reminder Notice1 linked violation
- August 15, 2014State Public Notification requested1 linked violation
- July 15, 2014State Public Notification requested1 linked violation
- July 15, 2014State Public Notification requested1 linked violation
- July 15, 2014State Violation/Reminder Notice1 linked violation
- July 15, 2014State Violation/Reminder Notice1 linked violation
- June 13, 2014State Public Notification requested1 linked violation
- June 13, 2014State Violation/Reminder Notice1 linked violation
- May 16, 2014State Compliance achieved26 linked violations
- May 8, 2014State Public Notification received1 linked violation
- May 6, 2014State Compliance achieved1 linked violation
- April 18, 2014State Violation/Reminder Notice1 linked violation
- April 18, 2014State Public Notification requested1 linked violation
- April 17, 2014State Violation/Reminder Notice1 linked violation
- April 17, 2014State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- April 17, 2014State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- April 17, 2014State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- April 17, 2014State Compliance achieved1 linked violation
- April 17, 2014State Public Notification requested1 linked violation
- February 10, 2014State Compliance achieved1 linked violation
- January 24, 2014State Public Notification requested26 linked violations
- January 24, 2014State Violation/Reminder Notice26 linked violations
- January 16, 2014State Violation/Reminder Notice1 linked violation
- January 16, 2014State Compliance achieved1 linked violation
- January 16, 2014State Public Notification requested1 linked violation
- January 16, 2014State Violation/Reminder Notice1 linked violation
- January 16, 2014State Compliance achieved1 linked violation
- January 16, 2014State Public Notification requested1 linked violation
- January 16, 2014State Violation/Reminder Notice1 linked violation
- January 16, 2014State Compliance achieved1 linked violation
- January 16, 2014State Public Notification requested1 linked violation
- January 15, 2014State Public Notification requested1 linked violation
- January 15, 2014State Violation/Reminder Notice1 linked violation
- May 15, 2009State Compliance achieved1 linked violation
- February 4, 2008State Violation/Reminder Notice1 linked violation
- February 4, 2008State Public Notification requested1 linked violation
- February 4, 2008State Violation/Reminder Notice1 linked violation
- September 26, 2007State Compliance achieved1 linked violation
- June 28, 2007State Violation/Reminder Notice1 linked violation
- February 2, 2007State Compliance achieved3 linked violations
- January 14, 2007State Public Notification requested2 linked violations
- January 14, 2007State Violation/Reminder Notice1 linked violation
- January 4, 2005State Public Notification requested2 linked violations
- March 4, 1999State Violation/Reminder Notice1 linked violation
- March 4, 1999State Public Notification requested1 linked violation
Common questions
Is TAMARACK COURT required to publish a Consumer Confidence Report?
- Yes. TAMARACK COURT is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is TAMARACK COURT’s next Consumer Confidence Report due?
- TAMARACK COURT’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does TAMARACK COURT have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for TAMARACK COURT.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
FULTZ, DANIEL D
406-532-0246
MISSOULA, MT 59801