RALEIGH, MS · Smith County
TRAXLER WATER ASSOCIATION Water System
Consumer Confidence Report status
TRAXLER WATER ASSOCIATION must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for TRAXLER WATER ASSOCIATION.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Mississippi’s official records. Always confirm current status with Mississippi before making decisions based on this information.
System facts
- System ID (PWSID)
- MS0650012
- System type
- Community Water System
- Population served
- 855
- Service connections
- 327
- Ownership
- public/private mix
- Water source
- groundwater (wells)
TRAXLER WATER ASSOCIATION is one of 794 community water systems in Mississippi in the 501 to 3,300 people size category, serving 855 people from groundwater.
As of August 1, 2026, its federal record holds 72 entries between 2005 and 2025, all of which EPA lists as closed.
Of the 72, 55 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Radionuclides and Revised Rad Rule, the Stage 2 Disinfectants and Disinfection Byproducts Rule, and the Public Notice Rule and Revised PN Rule.
Violation history
Maximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2025 – December 31, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
December 7, 2024 – December 7, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 15, 2024 – July 15, 2024
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
July 1, 2024 – September 6, 2024
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – July 10, 2024
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2024 – June 14, 2024
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
January 1, 2024 – March 31, 2024
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2023 – December 31, 2023
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2022 – December 31, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 20, 2022 – May 6, 2022
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2022 – June 30, 2022
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
January 1, 2022 – March 31, 2022
ArchivedMaximum Contaminant Level Violation, Average
Health-basedTTHM
January 1, 2017 – March 31, 2017
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2015 – June 30, 2015
ResolvedMonitoring, Regular
—Radium-228
July 1, 2012 – September 30, 2012
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Radium-226
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Radium-226
April 1, 2012 – June 30, 2012
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-228
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-226
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-228
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-226
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-228
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-226
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-228
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-226
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-226
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Radium-228
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-226
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-228
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-228
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-226
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-228
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-226
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-226
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-228
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-226
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-228
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-228
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-226
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-228
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-226
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-228
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-226
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-228
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Radium-226
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Radium-226
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Radium-226
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2007 – September 30, 2007
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2005 – June 30, 2005
Resolved
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| October 1, 2025 – December 31, 2025 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| December 7, 2024 – December 7, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 15, 2024 – July 15, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2024 – September 6, 2024 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| July 1, 2024 – July 10, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| April 1, 2024 – June 14, 2024 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| January 1, 2024 – March 31, 2024 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| October 1, 2023 – December 31, 2023 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| October 1, 2022 – December 31, 2022 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| May 20, 2022 – May 6, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2022 – June 30, 2022 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| January 1, 2022 – March 31, 2022 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| January 1, 2017 – March 31, 2017 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| April 1, 2015 – June 30, 2015 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2012 – September 30, 2012 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2005 – June 30, 2005 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
Enforcement actions
- November 5, 2012State Public Notification requested1 linked violation
- November 5, 2012State Formal Notice of Violation issued1 linked violation
- September 4, 2012State Public Notification received1 linked violation
- August 31, 2012State Formal Notice of Violation issued1 linked violation
- August 31, 2012State Public Notification requested1 linked violation
- May 15, 2012State Public Notification received56 linked violations
- May 15, 2012State Compliance achieved4 linked violations
- March 20, 2012State Public Notification requested56 linked violations
- March 20, 2012State Formal Notice of Violation issued58 linked violations
- June 26, 2009State Public Notification received4 linked violations
- June 26, 2009State Public Notification received3 linked violations
- June 26, 2009State Public Notification received8 linked violations
- June 26, 2009State Public Notification received4 linked violations
- June 26, 2009State Public Notification received4 linked violations
- June 26, 2009State Public Notification received3 linked violations
- June 26, 2009State Public Notification received3 linked violations
- June 26, 2009State Public Notification received3 linked violations
- November 17, 2008State Formal Notice of Violation issued7 linked violations
- November 17, 2008State Public Notification requested3 linked violations
- November 17, 2008State Public Notification requested3 linked violations
- November 17, 2008State Formal Notice of Violation issued3 linked violations
- November 17, 2008State Formal Notice of Violation issued3 linked violations
- November 17, 2008State Formal Notice of Violation issued7 linked violations
- May 9, 2008State Public Notification received2 linked violations
- April 25, 2008State Public Notification requested1 linked violation
- April 25, 2008State Violation/Reminder Notice1 linked violation
- October 16, 2007State Compliance achieved11 linked violations
- October 3, 2007State Public Notification requested3 linked violations
- August 30, 2007State Compliance Meeting conducted10 linked violations
- July 27, 2006State Violation/Reminder Notice24 linked violations
Common questions
Is TRAXLER WATER ASSOCIATION required to publish a Consumer Confidence Report?
- Yes. TRAXLER WATER ASSOCIATION is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is TRAXLER WATER ASSOCIATION’s next Consumer Confidence Report due?
- TRAXLER WATER ASSOCIATION’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does TRAXLER WATER ASSOCIATION have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for TRAXLER WATER ASSOCIATION.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
HESTER, DALE
601-269-3605
RALEIGH, MS 39153