SCHLATER, MS · Leflore County
MINTER CITY WATER & SEWER Water System
Current status
No open violations on record as of July 4, 2026.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Mississippi’s official records. Always confirm current status with Mississippi before making decisions based on this information.
System facts
- System ID (PWSID)
- MS0420035
- System type
- Community Water System
- Population served
- 357
- Service connections
- 198
- Ownership
- local government
- Water source
- groundwater (wells)
Violation history
Monitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2025 – March 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2025 – March 31, 2025
ArchivedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024 – October 23, 2024
ResolvedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024 – October 23, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
February 19, 2023 – June 14, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Regular
—CYANIDE
January 1, 2020 – December 31, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2018 – December 31, 2018
ResolvedMonitoring, Regular
—Radium-228
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Radium-226
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Radium-226
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Radium-228
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Radium-228
April 1, 2012 – June 30, 2012
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-226
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-226
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-228
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-228
January 1, 2012 – March 31, 2012
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-226
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-226
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-228
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-228
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-226
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Radium-228
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Radium-226
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Radium-228
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Radium-226
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Radium-226
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-228
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-226
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-228
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-226
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-228
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-226
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-228
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-228
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-226
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-228
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-226
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-228
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-226
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-228
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-226
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-226
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-228
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-226
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-228
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-228
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-226
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-228
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-226
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-228
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-228
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-228
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-226
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-228
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-226
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-228
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-228
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-226
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-226
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Radium-226
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Radium-228
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Radium-228
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2008 – December 31, 2008
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2008 – May 1, 2012
ResolvedMonitoring, Regular
—Radium-228
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Radium-226
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Radium-228
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Radium-226
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2007 – June 30, 2007
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2007 – March 31, 2007
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
July 1, 2005 – September 30, 2005
ResolvedMonitoring, Regular
—p-Dichlorobenzene
July 1, 2005 – September 30, 2005
ResolvedMonitoring, Regular
—1,2-Dichloroethane
July 1, 2005 – September 30, 2005
Resolved
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| March 1, 2025 – March 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2025 – March 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 17, 2024 – October 23, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Resolved |
| October 17, 2024 – October 23, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Resolved |
| February 19, 2023 – June 14, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | CYANIDE | — | Resolved |
| October 1, 2018 – December 31, 2018 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2008 – May 1, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2007 – June 30, 2007 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2007 – March 31, 2007 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2005 – September 30, 2005 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| July 1, 2005 – September 30, 2005 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| July 1, 2005 – September 30, 2005 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- April 22, 2025State Compliance achieved1 linked violation
- April 15, 2025State Formal Notice of Violation issued1 linked violation
- April 15, 2025State Formal Notice of Violation issued1 linked violation
- April 15, 2025State Public Notification requested1 linked violation
- April 15, 2025State Public Notification requested1 linked violation
- April 15, 2025State Formal Notice of Violation issued1 linked violation
- April 15, 2025State Public Notification requested1 linked violation
- April 10, 2025State Formal Notice of Violation issued1 linked violation
- April 10, 2025State Public Notification requested1 linked violation
- February 26, 2025State Violation/Reminder Notice1 linked violation
- February 26, 2025State Violation/Reminder Notice1 linked violation
- January 23, 2025State no additional Formal Action needed1 linked violation
- October 29, 2024State Compliance achieved1 linked violation
- October 23, 2024State Compliance achieved2 linked violations
- June 14, 2023State Compliance achieved1 linked violation
- June 14, 2023State Public Notification received1 linked violation
- February 8, 2023State Formal Notice of Violation issued1 linked violation
- February 8, 2023State Public Notification requested1 linked violation
- September 10, 2021State Public Notification received1 linked violation
- December 31, 2020State Compliance achieved1 linked violation
- September 22, 2020State Formal Notice of Violation issued1 linked violation
- September 22, 2020State Public Notification requested1 linked violation
- September 30, 2019State Public Notification received1 linked violation
- March 31, 2019State Compliance achieved1 linked violation
- November 6, 2018State Formal Notice of Violation issued1 linked violation
- November 6, 2018State Public Notification requested1 linked violation
- June 24, 2013State Public Notification received12 linked violations
- October 25, 2012State Administrative/Compliance Order without penalty issued1 linked violation
- October 2, 2012State Public Notification received1 linked violation
- September 30, 2012State Compliance achieved132 linked violations
- August 31, 2012State Formal Notice of Violation issued1 linked violation
- August 31, 2012State Public Notification requested1 linked violation
- August 22, 2012State Compliance achieved2 linked violations
- May 1, 2012State Compliance achieved1 linked violation
- May 1, 2012State Public Notification received78 linked violations
- March 20, 2012State Formal Notice of Violation issued80 linked violations
- March 20, 2012State Public Notification requested78 linked violations
- June 19, 2007State Violation/Reminder Notice75 linked violations
- April 18, 1988State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 13, 1987State Public Notification requested1 linked violation
- July 17, 1987State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- March 26, 1981State Violation/Reminder Notice1 linked violation
Contact
SANDERS, DEBBIE
662-299-0315
SCHLATER, MS 38952