UTICA, MS · Hinds County
REEDTOWN WATER ASSN Water System
Consumer Confidence Report status
REEDTOWN WATER ASSN must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for REEDTOWN WATER ASSN.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Mississippi’s official records. Always confirm current status with Mississippi before making decisions based on this information.
System facts
- System ID (PWSID)
- MS0250021
- System type
- Community Water System
- Population served
- 3,260
- Service connections
- 1,275
- Ownership
- public/private mix
- Water source
- groundwater (wells)
REEDTOWN WATER ASSN is one of 794 community water systems in Mississippi in the 501 to 3,300 people size category, serving 3,260 people from groundwater.
As of August 1, 2026, its federal record holds 96 entries between 2003 and 2025, all of which EPA lists as closed.
Of the 96, 94 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Radionuclides and Revised Rad Rule, inorganic chemicals, and the Total Coliform Rules.
Violation history
Monitoring and Reporting (DBP)
—Chlorine
January 1, 2025 – March 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2025 – January 31, 2025
ResolvedTreatment Technique, Level 1 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
July 31, 2024 – January 16, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – July 26, 2024
ResolvedMonitoring, Regular
—Nitrite
January 1, 2020 – December 31, 2020
ResolvedMonitoring, Regular
—Nitrite
January 1, 2020 – December 31, 2020
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2020 – December 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2019 – February 28, 2019
ResolvedMonitoring, Regular
—Radium-228
October 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Radium-226
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Radium-226
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-226
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-228
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-228
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-226
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-226
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-228
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-228
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-228
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-228
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Radium-226
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Radium-226
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-228
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-226
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-228
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-226
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-228
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-226
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-228
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-226
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-228
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-226
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-228
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-226
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-226
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-226
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-228
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-226
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-226
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-226
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-226
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-226
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-228
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-228
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-226
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-226
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-228
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-226
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-226
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-228
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-228
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-228
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-228
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-228
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-226
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-226
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-228
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-228
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-226
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-226
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Radium-226
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Radium-226
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Radium-226
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Radium-228
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Radium-228
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2007 – September 30, 2007
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2007 – September 30, 2007
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2007 – September 30, 2007
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2007 – June 30, 2007
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2007 – June 30, 2007
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2007 – June 30, 2007
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2006 – September 30, 2006
ResolvedMonitoring, Regular
—Xylenes, Total
July 1, 2005 – September 30, 2005
ResolvedMonitoring, Regular
—Chromium
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Mercury
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Barium
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2003 – December 31, 2003
Resolved
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2025 – March 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| January 1, 2025 – January 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 31, 2024 – January 16, 2025 | Treatment Technique, Level 1 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| July 1, 2024 – July 26, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2020 – December 31, 2020 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 2020 – December 31, 2020 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 2020 – December 31, 2020 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| February 1, 2019 – February 28, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2012 – December 31, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2007 – June 30, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2007 – June 30, 2007 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2007 – June 30, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2006 – September 30, 2006 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2005 – September 30, 2005 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Beryllium, Total | — | Resolved |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
Enforcement actions
- October 1, 2025State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- April 17, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- April 17, 2025State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- April 16, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- April 15, 2025State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- April 15, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- April 10, 2025State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- April 10, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- February 26, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 26, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 26, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- February 13, 2025State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- February 13, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 28, 2025State no additional Formal Action neededgeneral compliance action — not tied to a specific violation on record
- January 22, 2025State no additional Formal Action neededgeneral compliance action — not tied to a specific violation on record
- January 22, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- January 16, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- November 19, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 19, 2024State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- November 18, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 18, 2024State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- July 26, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 22, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- July 22, 2024State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- February 1, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- February 1, 2024State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- February 1, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- November 1, 2023State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- October 26, 2023State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- October 13, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 13, 2023State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- September 30, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- July 23, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- July 23, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- July 23, 2021State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- March 30, 2021State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 11, 2021State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- March 11, 2021State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- March 11, 2021State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- March 11, 2021State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- March 11, 2021State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- March 11, 2021State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- January 30, 2020State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- January 30, 2020State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 11, 2019State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 24, 2019State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- June 30, 2019State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 25, 2019State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 7, 2019State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- March 7, 2019State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 24, 2019State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 24, 2019State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- June 22, 2013State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 31, 2012State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 13, 2012State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- May 15, 2012State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 20, 2012State Formal Notice of Violation issued119 linked violations
- March 20, 2012State Public Notification requested224 linked violations
- December 31, 2009State Intentional no-action1 linked violation
- July 1, 2009State Public Notification received50 linked violations
- July 1, 2009State Public Notification received57 linked violations
- July 1, 2009State Public Notification received56 linked violations
- July 1, 2009State Public Notification received51 linked violations
- July 1, 2009State Public Notification received42 linked violations
- November 17, 2008State Public Notification requested318 linked violations
- December 31, 2007State Compliance achieved1 linked violation
- December 31, 2007State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- June 19, 2007State Violation/Reminder Notice78 linked violations
- June 30, 2005State Compliance achieved3 linked violations
- January 26, 2004State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- October 22, 1984State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- November 16, 1982State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
Common questions
Is REEDTOWN WATER ASSN required to publish a Consumer Confidence Report?
- Yes. REEDTOWN WATER ASSN is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is REEDTOWN WATER ASSN’s next Consumer Confidence Report due?
- REEDTOWN WATER ASSN’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does REEDTOWN WATER ASSN have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for REEDTOWN WATER ASSN.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
SMITH, KEN L
985-212-9119
UTICA, MS 39175