TUTWILER, MS · Coahoma County
MOORE BAYOU WATER ASSOCIATION Water System
Consumer Confidence Report status
MOORE BAYOU WATER ASSOCIATION must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 item for MOORE BAYOU WATER ASSOCIATION that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Mississippi’s official records. Always confirm current status with Mississippi before making decisions based on this information.
System facts
- System ID (PWSID)
- MS0140012
- System type
- Community Water System
- Population served
- 438
- Service connections
- 168
- Ownership
- public/private mix
- Water source
- groundwater (wells)
MOORE BAYOU WATER ASSOCIATION is one of 879 community water systems in Mississippi in the 500 or fewer people size category, serving 438 people from groundwater.
As of August 1, 2026, its federal record holds 65 entries between 2005 and 2025, of which 1 remains open; none are health-based.
Of the 65, 54 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Radionuclides and Revised Rad Rule, the Stage 1 Disinfectants and Disinfection Byproducts Rule, and the Stage 2 Disinfectants and Disinfection Byproducts Rule.
Violation history
Maximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2025 – June 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2024 – August 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2024 – September 30, 2024
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
July 1, 2024 – September 30, 2024
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2024
UnaddressedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2021 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2019 – August 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2019 – September 30, 2019
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
January 1, 2016 – March 31, 2016
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2015 – December 31, 2015
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
July 1, 2013 – September 30, 2013
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
April 1, 2013 – June 30, 2013
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
January 1, 2013 – March 31, 2013
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2012 – December 31, 2012
ResolvedMonitoring, Regular
—Radium-226
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Radium-228
July 1, 2012 – September 30, 2012
ResolvedMonitoring, Regular
—Radium-226
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-228
April 1, 2012 – June 30, 2012
ResolvedMonitoring, Regular
—Radium-226
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-228
January 1, 2012 – March 31, 2012
ResolvedMonitoring, Regular
—Radium-226
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-228
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2011 – December 31, 2011
ResolvedMonitoring, Regular
—Radium-226
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Radium-228
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2011 – September 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-226
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Radium-228
April 1, 2011 – June 30, 2011
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-226
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-228
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Regular
—Radium-228
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Radium-226
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-228
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-226
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Radium-226
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-228
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Radium-226
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Radium-228
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-228
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
October 1, 2009 – December 31, 2009
ResolvedMonitoring, Regular
—Radium-226
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-228
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2009 – September 30, 2009
ResolvedMonitoring, Regular
—Radium-226
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Radium-228
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Radium-228
January 1, 2009 – March 31, 2009
ResolvedMonitoring, Regular
—Radium-226
January 1, 2009 – March 31, 2009
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2008 – May 15, 2012
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2008 – June 30, 2008
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2007 – September 30, 2007
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2007 – March 31, 2007
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
July 1, 2006 – September 30, 2006
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
July 1, 2005 – September 30, 2005
Resolved
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| April 1, 2025 – June 30, 2025 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2024 – September 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2024 – September 30, 2024 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| January 1, 2024 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| October 1, 2021 – December 31, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 2019 – August 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2016 – March 31, 2016 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| October 1, 2015 – December 31, 2015 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| July 1, 2013 – September 30, 2013 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| April 1, 2013 – June 30, 2013 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| January 1, 2013 – March 31, 2013 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| October 1, 2012 – December 31, 2012 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2012 – September 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2012 – June 30, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2012 – March 31, 2012 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2011 – June 30, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2011 – March 31, 2011 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-226 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| October 1, 2009 – December 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| July 1, 2009 – September 30, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Radium-228 | — | Resolved |
| January 1, 2009 – March 31, 2009 | Monitoring, Regular | Radium-226 | — | Resolved |
| October 1, 2008 – May 15, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2008 – June 30, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2007 – March 31, 2007 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2006 – September 30, 2006 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
| July 1, 2005 – September 30, 2005 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Resolved |
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
Enforcement actions
- August 14, 2025State Compliance achieved1 linked violation
- May 6, 2025State Public Notification requested1 linked violation
- May 6, 2025State Formal Notice of Violation issued1 linked violation
- January 1, 2025State Compliance achieved1 linked violation
- November 18, 2024State Formal Notice of Violation issued1 linked violation
- November 18, 2024State Public Notification requested1 linked violation
- October 26, 2024State Compliance achieved1 linked violation
- October 18, 2024State Public Notification received1 linked violation
- September 9, 2024State Compliance achieved1 linked violation
- September 6, 2024State Public Notification requested1 linked violation
- September 6, 2024State Formal Notice of Violation issued1 linked violation
- August 26, 2024State Public Notification received1 linked violation
- August 19, 2024State Public Notification requested1 linked violation
- August 19, 2024State Formal Notice of Violation issued1 linked violation
- February 1, 2024State Public Notification requested1 linked violation
- February 1, 2024State Formal Notice of Violation issued1 linked violation
- March 31, 2022State Compliance achieved1 linked violation
- December 2, 2021State Public Notification received1 linked violation
- November 12, 2021State Public Notification requested1 linked violation
- November 12, 2021State Formal Notice of Violation issued1 linked violation
- June 30, 2020State Public Notification received2 linked violations
- December 31, 2019State Compliance achieved1 linked violation
- September 16, 2019State Compliance achieved1 linked violation
- September 9, 2019State Public Notification requested2 linked violations
- September 9, 2019State Formal Notice of Violation issued2 linked violations
- March 16, 2017State Administrative/Compliance Order without penalty issued1 linked violation
- June 9, 2016State Compliance achieved2 linked violations
- May 23, 2016State Public Notification received1 linked violation
- May 10, 2016State Public Notification requested1 linked violation
- May 10, 2016State Formal Notice of Violation issued1 linked violation
- March 3, 2016State Public Notification received1 linked violation
- March 1, 2016State Formal Notice of Violation issued1 linked violation
- March 1, 2016State Public Notification requested1 linked violation
- February 10, 2015State Compliance achieved4 linked violations
- April 16, 2014State Public Notification received1 linked violation
- December 6, 2013State Public Notification received1 linked violation
- November 15, 2013State Formal Notice of Violation issued1 linked violation
- November 15, 2013State Public Notification requested1 linked violation
- August 30, 2013State Public Notification received1 linked violation
- August 19, 2013State Public Notification requested1 linked violation
- August 19, 2013State Formal Notice of Violation issued1 linked violation
- August 15, 2013State Administrative/Compliance Order without penalty issued6 linked violations
- June 10, 2013State Public Notification received6 linked violations
- May 1, 2013State Public Notification received1 linked violation
- April 16, 2013State Public Notification requested1 linked violation
- April 16, 2013State Formal Notice of Violation issued1 linked violation
- March 15, 2013State Public Notification received1 linked violation
- February 21, 2013State Public Notification requested1 linked violation
- February 21, 2013State Formal Notice of Violation issued1 linked violation
- September 30, 2012State Compliance achieved70 linked violations
- May 15, 2012State Compliance achieved1 linked violation
- May 15, 2012State Public Notification received39 linked violations
- March 20, 2012State Public Notification requested39 linked violations
- March 20, 2012State Formal Notice of Violation issued39 linked violations
- June 29, 2009State Public Notification received48 linked violations
- June 29, 2009State Public Notification received9 linked violations
- November 17, 2008State Formal Notice of Violation issued12 linked violations
- November 17, 2008State Public Notification requested14 linked violations
- July 23, 2007State Public Notification requested6 linked violations
- July 23, 2007State Violation/Reminder Notice8 linked violations
- November 27, 2006State Compliance achieved6 linked violations
- September 30, 2004State Compliance achieved1 linked violation
- December 11, 2002State Compliance achieved1 linked violation
- May 29, 2002State Public Notification requested1 linked violation
Common questions
Is MOORE BAYOU WATER ASSOCIATION required to publish a Consumer Confidence Report?
- Yes. MOORE BAYOU WATER ASSOCIATION is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is MOORE BAYOU WATER ASSOCIATION’s next Consumer Confidence Report due?
- MOORE BAYOU WATER ASSOCIATION’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does MOORE BAYOU WATER ASSOCIATION have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 item for MOORE BAYOU WATER ASSOCIATION that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
SWINDOLL, MIKE
662-326-3322
TUTWILER, MS 38963