MOUNT VERNON, MO · Lawrence County
JAMESTOWNE MHP Water System
Current status
3 items on record are open and awaiting resolution as of July 4, 2026. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings. Full details are in the violation history below.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Missouri’s official records. Always confirm current status with Missouri before making decisions based on this information.
System facts
- System ID (PWSID)
- MO5048294
- System type
- Community Water System
- Population served
- 46
- Service connections
- 14
- Ownership
- privately owned
- Water source
- groundwater (wells)
Violation history
Monitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2025 – August 31, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025
UnaddressedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2024 – December 31, 2024
ResolvedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024
UnaddressedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
October 1, 2024 – October 31, 2024
ResolvedLead Consumer Notice
—Lead and Copper Rule
October 1, 2024
UnaddressedPublic Notification Violation without NPDWR Violation
—Public Notice
September 30, 2024 – January 29, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 30, 2024 – January 29, 2025
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
August 4, 2024 – January 29, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 4, 2024 – January 29, 2025
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
August 1, 2024 – August 31, 2024
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
July 2, 2024 – January 29, 2025
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
July 1, 2024 – September 30, 2024
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
July 1, 2024 – July 31, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 30, 2024 – January 29, 2025
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
June 1, 2024 – June 30, 2024
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
May 1, 2024 – May 31, 2024
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 26, 2024 – January 29, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 15, 2024 – January 29, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 15, 2024 – January 29, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 15, 2024 – January 29, 2025
ResolvedTreatment Technique (SWTR and GWR)
Health-basedGroundwater Rule
April 1, 2024 – April 30, 2024
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
February 1, 2024 – February 29, 2024
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
January 1, 2024 – January 31, 2024
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
December 1, 2023 – December 31, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2023 – October 22, 2024
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
July 1, 2023 – November 1, 2023
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
March 1, 2023 – March 31, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 5, 2022 – October 27, 2022
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 26, 2022 – November 18, 2022
ResolvedMonitoring, Source Water (GWR)
—E. COLI
May 1, 2022 – September 27, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2022 – May 31, 2022
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 2022 – December 31, 2022
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – September 29, 2022
ResolvedMaximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring, Regular
—Selenium
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Benzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Toluene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Styrene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Arsenic
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Barium
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Cadmium
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Chromium
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Fluoride
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Mercury
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2020 – December 31, 2022
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
July 1, 2019 – November 26, 2019
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2019 – December 31, 2021
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2019 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2018 – October 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2018 – July 31, 2018
ResolvedMonitoring, Source Water (GWR)
—E. COLI
September 1, 2013 – February 13, 2014
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
August 1, 2013 – August 31, 2013
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
August 1, 2013 – August 31, 2013
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
April 1, 2013 – April 30, 2013
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
April 1, 2013 – April 30, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2012 – September 30, 2012
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 5, 2012 – June 12, 2012
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2012 – October 25, 2013
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
May 1, 2012 – May 31, 2012
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
June 1, 2007 – June 30, 2007
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
May 1, 2007 – May 31, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2007 – April 30, 2007
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2006 – February 27, 2009
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 2002 – October 31, 2002
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
September 1, 2002 – September 30, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1991 – October 31, 1991
Resolved
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| August 1, 2025 – August 31, 2025 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 1, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Unaddressed |
| April 1, 2025 – April 30, 2025 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| December 1, 2024 – December 31, 2024 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 17, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Unaddressed |
| October 1, 2024 – October 31, 2024 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2024 | Lead Consumer Notice | Lead and Copper Rule | — | Unaddressed |
| September 30, 2024 – January 29, 2025 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| September 30, 2024 – January 29, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 4, 2024 – January 29, 2025 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| August 4, 2024 – January 29, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 2, 2024 – January 29, 2025 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2024 – September 30, 2024 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2024 – July 31, 2024 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| June 30, 2024 – January 29, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| June 1, 2024 – June 30, 2024 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| May 1, 2024 – May 31, 2024 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| April 26, 2024 – January 29, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 15, 2024 – January 29, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 15, 2024 – January 29, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 15, 2024 – January 29, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2024 – April 30, 2024 | Treatment Technique (SWTR and GWR) | Groundwater Rule | Health-based | Resolved |
| February 1, 2024 – February 29, 2024 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| January 1, 2024 – January 31, 2024 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| December 1, 2023 – December 31, 2023 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2023 – October 22, 2024 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2023 – November 1, 2023 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| March 1, 2023 – March 31, 2023 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| September 5, 2022 – October 27, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 26, 2022 – November 18, 2022 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| May 1, 2022 – September 27, 2022 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| May 1, 2022 – May 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| July 1, 2021 – September 29, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Thallium, Total | — | Resolved |
| July 1, 2019 – November 26, 2019 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| January 1, 2019 – December 31, 2021 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2019 – December 31, 2021 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| October 1, 2018 – October 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2018 – July 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2013 – February 13, 2014 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| August 1, 2013 – August 31, 2013 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| August 1, 2013 – August 31, 2013 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| April 1, 2013 – April 30, 2013 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| April 1, 2013 – April 30, 2013 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| September 1, 2012 – September 30, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 5, 2012 – June 12, 2012 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2012 – October 25, 2013 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| May 1, 2012 – May 31, 2012 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| June 1, 2007 – June 30, 2007 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2007 – May 31, 2007 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| April 1, 2007 – April 30, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2006 – February 27, 2009 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| October 1, 2002 – October 31, 2002 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2002 – September 30, 2002 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 1991 – October 31, 1991 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
Enforcement actions
No enforcement actions on record for this system.
Contact
DE YOUNG, TOM
417-366-3605
MOUNT VERNON, MO 65712-0000