JOPLIN, MO · Newton County
TIMBERLOST MHP Water System
Consumer Confidence Report status
TIMBERLOST MHP must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 item for TIMBERLOST MHP that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Missouri’s official records. Always confirm current status with Missouri before making decisions based on this information.
System facts
- System ID (PWSID)
- MO5048274
- System type
- Community Water System
- Population served
- 150
- Service connections
- 51
- Ownership
- privately owned
- Water source
- groundwater (wells)
TIMBERLOST MHP is one of 1,412 community water systems in Missouri in the 500 or fewer people size category, serving 150 people from groundwater.
As of August 1, 2026, its federal record holds 32 entries between 2001 and 2025, of which 1 remains open; none are health-based.
Of the 32, 20 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Groundwater Rule, the Total Coliform Rules, and the Consumer Confidence Rule.
Violation history
Monitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
July 1, 2025 – July 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2024 – November 30, 2024
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
November 1, 2024 – November 30, 2024
ResolvedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024
UnaddressedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
October 1, 2024 – October 31, 2024
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
February 1, 2024 – February 29, 2024
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
October 1, 2023 – October 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2023 – October 31, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 8, 2022 – July 27, 2022
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
December 5, 2021 – April 22, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 9, 2021 – July 27, 2022
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
September 29, 2021 – April 22, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2020 – December 31, 2020
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
July 1, 2020 – November 10, 2020
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
April 1, 2020 – April 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – October 31, 2019
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
October 1, 2019 – October 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2018 – October 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2017 – May 31, 2017
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
November 1, 2016 – November 30, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2016 – August 31, 2016
ResolvedMonitoring of Treatment (SWTR-Unfilt/GWR)
—Groundwater Rule
January 1, 2015 – January 31, 2015
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
July 1, 2013 – July 23, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2011 – July 31, 2011
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
July 10, 2010 – August 2, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2008 – September 30, 2008
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2005 – July 3, 2006
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 2004 – August 31, 2004
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2003 – July 3, 2006
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2002 – July 3, 2006
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
June 1, 2002 – June 30, 2002
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2001 – July 3, 2006
Resolved
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| July 1, 2025 – July 31, 2025 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 17, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Unaddressed |
| October 1, 2024 – October 31, 2024 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| February 1, 2024 – February 29, 2024 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2023 – October 31, 2023 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2023 – October 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 8, 2022 – July 27, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| December 5, 2021 – April 22, 2022 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| November 9, 2021 – July 27, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 29, 2021 – April 22, 2022 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| December 1, 2020 – December 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2020 – November 10, 2020 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| April 1, 2020 – April 30, 2020 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2019 – October 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2019 – October 31, 2019 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| October 1, 2018 – October 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2017 – May 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2016 – November 30, 2016 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| August 1, 2016 – August 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2015 – January 31, 2015 | Monitoring of Treatment (SWTR-Unfilt/GWR) | Groundwater Rule | — | Resolved |
| July 1, 2013 – July 23, 2014 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2011 – July 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 10, 2010 – August 2, 2010 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| September 1, 2008 – September 30, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2005 – July 3, 2006 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| August 1, 2004 – August 31, 2004 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2003 – July 3, 2006 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2002 – July 3, 2006 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2002 – June 30, 2002 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2001 – July 3, 2006 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
Enforcement actions
- September 23, 2025State Compliance achieved5 linked violations
- March 14, 2025State Public Notification requested3 linked violations
- January 8, 2025State Public Notification requested4 linked violations
- December 18, 2024State Violation/Reminder Notice8 linked violations
- December 17, 2024State Compliance achieved3 linked violations
- November 18, 2024State Violation/Reminder Notice2 linked violations
- April 4, 2024State Public Notification received1 linked violation
- March 22, 2024State Public Notification requested7 linked violations
- December 13, 2023State Public Notification received2 linked violations
- December 13, 2023State Public Notification received1 linked violation
- November 29, 2023State Violation/Reminder Notice3 linked violations
- November 29, 2023State Public Notification requested4 linked violations
- November 27, 2023State Public Notification requested3 linked violations
- July 29, 2022State Public Notification received2 linked violations
- July 29, 2022State Public Notification received2 linked violations
- April 22, 2022State Compliance achieved1 linked violation
- April 20, 2022State Compliance achieved2 linked violations
- March 9, 2022State Bilateral Compliance Agreement signed2 linked violations
- January 26, 2022State Formal Notice of Violation issued1 linked violation
- January 26, 2022State Public Notification requested1 linked violation
- September 29, 2021State Formal Notice of Violation issued1 linked violation
- September 29, 2021State Public Notification requested1 linked violation
- September 29, 2021State Formal Notice of Violation issued1 linked violation
- August 31, 2021State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 6, 2021State Public Notification received1 linked violation
- February 4, 2021State Public Notification requested1 linked violation
- February 4, 2021State Violation/Reminder Notice1 linked violation
- January 19, 2021State Compliance achieved1 linked violation
- November 10, 2020State Compliance achieved1 linked violation
- August 18, 2020State Public Notification received1 linked violation
- June 29, 2020State Compliance achieved1 linked violation
- June 12, 2020State Public Notification received1 linked violation
- June 1, 2020State Violation/Reminder Notice1 linked violation
- June 1, 2020State Public Notification requested1 linked violation
- December 30, 2019State Compliance achieved1 linked violation
- December 24, 2019State Public Notification received1 linked violation
- December 12, 2019State Compliance achieved1 linked violation
- November 27, 2019State Public Notification requested1 linked violation
- November 27, 2019State Violation/Reminder Notice1 linked violation
- November 27, 2019State Public Notification requested1 linked violation
- November 27, 2019State Violation/Reminder Notice1 linked violation
- November 4, 2019State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- April 23, 2019State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 22, 2019State Compliance achieved3 linked violations
- January 2, 2019State Public Notification received1 linked violation
- December 14, 2018State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- November 30, 2018State Violation/Reminder Notice1 linked violation
- November 30, 2018State Public Notification requested1 linked violation
- July 3, 2018State Public Notification received2 linked violations
- May 24, 2018State Violation/Reminder Notice2 linked violations
- March 22, 2018State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 19, 2017State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 11, 2017State Public Notification requested1 linked violation
- July 11, 2017State Violation/Reminder Notice1 linked violation
- July 5, 2017State Public Notification received1 linked violation
- July 5, 2017State Public Notification received1 linked violation
- January 30, 2017State Compliance achieved1 linked violation
- December 28, 2016State Public Notification requested1 linked violation
- December 28, 2016State Violation/Reminder Notice1 linked violation
- October 4, 2016State Public Notification requested1 linked violation
- October 4, 2016State Violation/Reminder Notice1 linked violation
- January 5, 2016State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- August 28, 2015State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 31, 2015State Compliance achieved1 linked violation
- March 9, 2015State Public Notification received1 linked violation
- February 27, 2015State Public Notification requested1 linked violation
- February 27, 2015State Violation/Reminder Notice1 linked violation
- January 22, 2014State Compliance achieved4 linked violations
- January 22, 2014State Compliance achieved1 linked violation
- January 9, 2014State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 12, 2011State Public Notification received1 linked violation
- August 23, 2011State Public Notification requested1 linked violation
- August 23, 2011State Violation/Reminder Notice1 linked violation
- August 2, 2010State Compliance achieved1 linked violation
- June 27, 2007State Public Notification requested2 linked violations
- July 31, 2002State Public Notification requested2 linked violations
- July 31, 2002State Formal Notice of Violation issued2 linked violations
Common questions
Is TIMBERLOST MHP required to publish a Consumer Confidence Report?
- Yes. TIMBERLOST MHP is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is TIMBERLOST MHP’s next Consumer Confidence Report due?
- TIMBERLOST MHP’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does TIMBERLOST MHP have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 item for TIMBERLOST MHP that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
SUNNYVALE INVESTMENTS LLC PROPERTY MANAG
417-417-0199
JOPLIN, MO 64801-2170