Public Water Partners

TURNER, MO · Greene County

JAMES RIVER ADDITION Water System

Consumer Confidence Report status

JAMES RIVER ADDITION must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.

As of August 1, 2026, EPA's federal records show no open violations for JAMES RIVER ADDITION.

Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Missouri’s official records. Always confirm current status with Missouri before making decisions based on this information.

System facts

System ID (PWSID)
MO5036115
System type
Community Water System
Population served
240
Service connections
96
Ownership
privately owned
Water source
groundwater (wells)

JAMES RIVER ADDITION is one of 1,412 community water systems in Missouri in the 500 or fewer people size category, serving 240 people from groundwater.

As of August 1, 2026, its federal record holds 12 entries between 1980 and 2013, all of which EPA lists as closed. Nothing has been added since 2013.

Of the 12, 7 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Total Coliform Rules, the Radionuclides and Revised Rad Rule, and inorganic chemicals.

Violation history

  • Monitoring, Regular

    Nitrate-Nitrite

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Routine Minor (TCR)

    Coliform (TCR)

    July 1, 2010 – July 31, 2010

    Resolved
  • Failure To Address Deficiency

    Health-based

    Groundwater Rule

    March 14, 2010 – June 9, 2010

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    April 1, 2002 – April 30, 2002

    Resolved
  • Monitoring, Routine Minor (TCR)

    Coliform (TCR)

    July 1, 1995 – July 31, 1995

    Resolved
  • Maximum Contaminant Level Violation, Monthly (TCR)

    Health-based

    Coliform (TCR)

    June 1, 1995 – June 30, 1995

    Archived
  • Maximum Contaminant Level Violation, Monthly (TCR)

    Health-based

    Coliform (TCR)

    July 1, 1991 – July 31, 1991

    Archived
  • Maximum Contaminant Level Violation, Monthly (TCR)

    Health-based

    Coliform (TCR)

    June 26, 1991 – July 25, 1991

    Archived
  • Maximum Contaminant Level Violation, Monthly (TCR)

    Health-based

    Coliform (TCR)

    May 1, 1991 – May 31, 1991

    Archived
  • Monitoring, Regular

    Gross Alpha, Excl. Radon and U

    June 24, 1980 – September 23, 1984

    Archived
  • Monitoring, Regular

    Gross Alpha, Excl. Radon and U

    June 24, 1980 – September 23, 1983

    Archived
  • Monitoring, Regular

    Gross Alpha, Excl. Radon and U

    June 24, 1980 – September 23, 1982

    Archived

Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)

Enforcement actions

Common questions

Is JAMES RIVER ADDITION required to publish a Consumer Confidence Report?

Yes. JAMES RIVER ADDITION is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.

When is JAMES RIVER ADDITION’s next Consumer Confidence Report due?

JAMES RIVER ADDITION’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.

Does JAMES RIVER ADDITION have any open drinking water violations on record?

As of August 1, 2026, EPA's federal records show no open violations for JAMES RIVER ADDITION.

What is a Consumer Confidence Report?

A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.

Contact

MATHEWSON, ROD

417-343-1064

TURNER, MO 65765-0272