LATHROP, MO · Clinton County
CLINTON CO PWSD 4 SYS 1 Water System
Consumer Confidence Report status
CLINTON CO PWSD 4 SYS 1 must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 item for CLINTON CO PWSD 4 SYS 1 that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Missouri’s official records. Always confirm current status with Missouri before making decisions based on this information.
System facts
- System ID (PWSID)
- MO1024156
- System type
- Community Water System
- Population served
- 4,968
- Service connections
- 1,996
- Ownership
- local government
- Water source
- surface water (rivers, lakes, or reservoirs)
CLINTON CO PWSD 4 SYS 1 is one of 140 community water systems in Missouri in the 3,301 to 10,000 people size category, serving 4,968 people from surface water.
As of August 1, 2026, its federal record holds 9 entries between 2009 and 2026, of which 1 remains open; none are health-based.
Of the 9, 7 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Total Coliform Rules, the Stage 2 Disinfectants and Disinfection Byproducts Rule, and the Lead and Copper Rule.
Violation history
Monitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2026 – February 28, 2026
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2026 – January 31, 2026
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2025 – December 31, 2025
ResolvedMaximum Contaminant Level Violation, Average
Health-basedTTHM
October 1, 2025 – December 31, 2025
ArchivedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024 – April 17, 2025
ResolvedLead Consumer Notice
—Lead and Copper Rule
October 1, 2024
UnaddressedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
April 1, 2015 – April 30, 2015
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
December 1, 2009 – December 31, 2009
Resolved
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| February 1, 2026 – February 28, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2026 – January 31, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2026 – March 31, 2026 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| December 1, 2025 – December 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2025 – December 31, 2025 | Maximum Contaminant Level Violation, Average | TTHM | Health-based | Archived |
| October 17, 2024 – April 17, 2025 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Resolved |
| October 1, 2024 | Lead Consumer Notice | Lead and Copper Rule | — | Unaddressed |
| April 1, 2015 – April 30, 2015 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2009 – December 31, 2009 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
Resolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yet
Enforcement actions
No enforcement actions on record for this system.
Common questions
Is CLINTON CO PWSD 4 SYS 1 required to publish a Consumer Confidence Report?
- Yes. CLINTON CO PWSD 4 SYS 1 is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is CLINTON CO PWSD 4 SYS 1’s next Consumer Confidence Report due?
- CLINTON CO PWSD 4 SYS 1’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does CLINTON CO PWSD 4 SYS 1 have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 item for CLINTON CO PWSD 4 SYS 1 that is open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
GORHAM, JAMES
816-580-7211
LATHROP, MO 64465-0000