Warsaw, MN · Rice County
Rolling Green First Addition Water System
Consumer Confidence Report status
Rolling Green First Addition must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for Rolling Green First Addition.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Minnesota’s official records. Always confirm current status with Minnesota before making decisions based on this information.
System facts
- System ID (PWSID)
- MN1660022
- System type
- Community Water System
- Population served
- 110
- Service connections
- 44
- Ownership
- privately owned
- Water source
- groundwater (wells)
Rolling Green First Addition is one of 739 community water systems in Minnesota in the 500 or fewer people size category, serving 110 people from groundwater.
As of August 1, 2026, its federal record holds 22 entries between 2017 and 2025, all of which EPA lists as closed.
Of the 22, 11 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Radionuclides and Revised Rad Rule, the Total Coliform Rules, and the Lead and Copper Rule.
Violation history
Maximum Contaminant Level Violation, Average
Health-basedCombined Radium (-226 and -228)
January 1, 2025 – December 31, 2025
ArchivedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
January 1, 2025 – December 31, 2025
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2024 – July 3, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2024 – September 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2024 – June 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2024 – March 31, 2024
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Radium (-226 and -228)
January 1, 2024 – December 31, 2024
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2023 – July 3, 2025
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Radium (-226 and -228)
January 1, 2023 – December 31, 2023
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2023 – March 31, 2023
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
January 1, 2023 – December 31, 2023
ArchivedMonitoring, Regular
—Nitrate
January 1, 2023 – December 31, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2022 – July 3, 2025
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
January 1, 2022 – March 31, 2022
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2021 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2021 – September 30, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
January 1, 2021 – March 31, 2021
ArchivedMonitoring, Regular
—Nitrate
January 1, 2021 – December 31, 2021
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Radium (-226 and -228)
January 1, 2020 – December 31, 2020
ArchivedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
January 1, 2020 – December 31, 2020
ArchivedMaximum Contaminant Level Violation, Average
Health-basedCombined Radium (-226 and -228)
January 1, 2018 – December 31, 2018
ArchivedMaximum Contaminant Level Violation, Average
Health-basedGross Alpha, Excl. Radon and U
January 1, 2017 – December 31, 2017
Archived
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2025 – December 31, 2025 | Maximum Contaminant Level Violation, Average | Combined Radium (-226 and -228) | Health-based | Archived |
| January 1, 2025 – December 31, 2025 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| October 1, 2024 – July 3, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2024 – September 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2024 – June 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – March 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – December 31, 2024 | Maximum Contaminant Level Violation, Average | Combined Radium (-226 and -228) | Health-based | Archived |
| October 1, 2023 – July 3, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2023 – December 31, 2023 | Maximum Contaminant Level Violation, Average | Combined Radium (-226 and -228) | Health-based | Archived |
| January 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – December 31, 2023 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| January 1, 2023 – December 31, 2023 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 2022 – July 3, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2022 – March 31, 2022 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| October 1, 2021 – December 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2021 – September 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2021 – March 31, 2021 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| January 1, 2021 – December 31, 2021 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2020 – December 31, 2020 | Maximum Contaminant Level Violation, Average | Combined Radium (-226 and -228) | Health-based | Archived |
| January 1, 2020 – December 31, 2020 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
| January 1, 2018 – December 31, 2018 | Maximum Contaminant Level Violation, Average | Combined Radium (-226 and -228) | Health-based | Archived |
| January 1, 2017 – December 31, 2017 | Maximum Contaminant Level Violation, Average | Gross Alpha, Excl. Radon and U | Health-based | Archived |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
Enforcement actions
- March 17, 2026State Public Notification received1 linked violation
- March 17, 2026State Public Notification received1 linked violation
- December 23, 2025State Public Notification received1 linked violation
- December 23, 2025State Formal Notice of Violation issued1 linked violation
- December 23, 2025State Public Notification received1 linked violation
- December 23, 2025State Public Notification requested1 linked violation
- December 23, 2025State Compliance Meeting conducted1 linked violation
- December 23, 2025State Public Notification requested1 linked violation
- December 23, 2025State Compliance Meeting conducted1 linked violation
- December 23, 2025State Formal Notice of Violation issued1 linked violation
- September 17, 2025State Public Notification received1 linked violation
- September 17, 2025State Public Notification received1 linked violation
- July 3, 2025State Compliance achieved1 linked violation
- July 3, 2025State Compliance achieved1 linked violation
- July 3, 2025State Compliance achieved1 linked violation
- June 11, 2025State Public Notification received1 linked violation
- June 11, 2025State Public Notification received1 linked violation
- May 6, 2025State Public Notification requested1 linked violation
- May 6, 2025State Public Notification requested1 linked violation
- May 6, 2025State Compliance Meeting conducted1 linked violation
- May 6, 2025State Formal Notice of Violation issued1 linked violation
- May 6, 2025State Compliance Meeting conducted1 linked violation
- May 6, 2025State Formal Notice of Violation issued1 linked violation
- March 22, 2025State Public Notification received1 linked violation
- March 22, 2025State Public Notification received1 linked violation
- December 28, 2024State Public Notification received1 linked violation
- December 28, 2024State Public Notification received1 linked violation
- December 16, 2024State Compliance achieved1 linked violation
- December 16, 2024State Compliance achieved1 linked violation
- December 16, 2024State Compliance achieved1 linked violation
- December 11, 2024State Public Notification requested1 linked violation
- December 11, 2024State Public Notification requested1 linked violation
- December 11, 2024State Formal Notice of Violation issued1 linked violation
- December 11, 2024State Public Notification requested1 linked violation
- December 11, 2024State Formal Notice of Violation issued1 linked violation
- December 11, 2024State Formal Notice of Violation issued1 linked violation
- December 5, 2024State Formal Notice of Violation issued1 linked violation
- October 29, 2024State Compliance achieved1 linked violation
- October 9, 2024State Public Notification received1 linked violation
- October 9, 2024State Public Notification received1 linked violation
- September 5, 2024State Violation/Reminder Notice1 linked violation
- July 24, 2024State Compliance achieved1 linked violation
- July 11, 2024State Administrative/Compliance Order with penalty issued1 linked violation
- July 11, 2024State Administrative/Compliance Order with penalty issued1 linked violation
- July 11, 2024State Administrative/Compliance Order with penalty issued1 linked violation
- July 11, 2024State Administrative/Compliance Order with penalty issued1 linked violation
- July 11, 2024State Administrative/Compliance Order with penalty issued1 linked violation
- July 11, 2024State Administrative/Compliance Order with penalty issued1 linked violation
- June 24, 2024State Public Notification received1 linked violation
- June 5, 2024State Violation/Reminder Notice1 linked violation
- April 1, 2024State Public Notification received1 linked violation
- March 5, 2024State Violation/Reminder Notice1 linked violation
- January 5, 2024State Public Notification requested1 linked violation
- January 5, 2024State Formal Notice of Violation issued1 linked violation
- December 20, 2023State Formal Notice of Violation issued1 linked violation
- December 5, 2023State Violation/Reminder Notice1 linked violation
- October 31, 2023State Compliance Meeting conducted1 linked violation
- October 31, 2023State Formal Notice of Violation issued1 linked violation
- October 31, 2023State Public Notification requested1 linked violation
- October 31, 2023State Formal Notice of Violation issued1 linked violation
- October 31, 2023State Compliance Meeting conducted1 linked violation
- October 31, 2023State Public Notification requested1 linked violation
- May 17, 2023State Formal Notice of Violation issued1 linked violation
- May 17, 2023State Public Notification requested1 linked violation
- March 5, 2023State Violation/Reminder Notice1 linked violation
- December 21, 2022State Compliance achieved1 linked violation
- November 22, 2022State Formal Notice of Violation issued1 linked violation
- September 6, 2022State Violation/Reminder Notice1 linked violation
- July 5, 2022State Administrative/Compliance Order without penalty issued1 linked violation
- March 22, 2022State Compliance achieved1 linked violation
- March 22, 2022State Compliance achieved1 linked violation
- March 11, 2022State Formal Notice of Violation issued1 linked violation
- March 11, 2022State Public Notification requested1 linked violation
- January 31, 2022State Formal Notice of Violation issued1 linked violation
- January 31, 2022State Public Notification requested1 linked violation
- December 16, 2021State Violation/Reminder Notice1 linked violation
- December 5, 2021State Violation/Reminder Notice1 linked violation
- October 29, 2021State Public Notification requested1 linked violation
- October 29, 2021State Formal Notice of Violation issued1 linked violation
- September 5, 2021State Violation/Reminder Notice1 linked violation
- July 6, 2021State Public Notification received1 linked violation
- July 6, 2021State Public Notification received1 linked violation
- May 14, 2021State Compliance Meeting conducted8 linked violations
- March 11, 2021State Formal Notice of Violation issued1 linked violation
- March 11, 2021State Public Notification requested1 linked violation
- February 17, 2021State Administrative/Compliance Order without penalty issued4 linked violations
- February 17, 2021State Administrative/Compliance Order without penalty issued1 linked violation
- February 17, 2021State Administrative/Compliance Order without penalty issued1 linked violation
- February 17, 2021State Administrative/Compliance Order without penalty issued1 linked violation
- January 27, 2021State Compliance achieved1 linked violation
- December 5, 2020State Violation/Reminder Notice1 linked violation
- November 19, 2020State Public Notification received1 linked violation
- November 4, 2020State Public Notification requested2 linked violations
- November 4, 2020State Compliance Meeting conducted2 linked violations
- February 7, 2020State Public Notification requested2 linked violations
- February 7, 2020State Compliance Meeting conducted2 linked violations
- February 7, 2020State Formal Notice of Violation issued2 linked violations
- March 11, 2019State Formal Notice of Violation issued2 linked violations
- November 1, 2018State Public Notification requested6 linked violations
- November 1, 2018State Compliance Meeting conducted9 linked violations
- May 19, 2017State Administrative/Compliance Order without penalty issued2 linked violations
- November 22, 2016State Public Notification received2 linked violations
- October 24, 2016State Public Notification requested2 linked violations
- October 24, 2016State Compliance Meeting conducted2 linked violations
- October 24, 2016State Formal Notice of Violation issued2 linked violations
Common questions
Is Rolling Green First Addition required to publish a Consumer Confidence Report?
- Yes. Rolling Green First Addition is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is Rolling Green First Addition’s next Consumer Confidence Report due?
- Rolling Green First Addition’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does Rolling Green First Addition have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for Rolling Green First Addition.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
Rolling Green First Addition
5073302841
Warsaw, MN 55087