Climax, MN · Polk County
Climax Water System
Consumer Confidence Report status
Climax must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 3 items for Climax that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Minnesota’s official records. Always confirm current status with Minnesota before making decisions based on this information.
System facts
- System ID (PWSID)
- MN1600001
- System type
- Community Water System
- Population served
- 223
- Service connections
- 116
- Ownership
- local government
- Water source
- groundwater (wells)
Climax is one of 739 community water systems in Minnesota in the 500 or fewer people size category, serving 223 people from groundwater.
As of August 1, 2026, its federal record holds 27 entries between 2011 and 2026, of which 3 remain open; none are health-based.
Of the 27, 20 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Lead and Copper Rule, inorganic chemicals, and the Total Coliform Rules.
Violation history
Initial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2026
UnaddressedMonitoring and Reporting (DBP)
—TTHM
July 1, 2025 – October 31, 2025
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2025
UnaddressedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2024
UnaddressedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2022 – August 31, 2023
ResolvedMaximum Contaminant Level Violation, Average
Health-basedArsenic
July 1, 2022 – September 30, 2022
ResolvedMaximum Contaminant Level Violation, Average
Health-basedArsenic
April 1, 2022 – June 30, 2022
ResolvedMaximum Contaminant Level Violation, Average
Health-basedArsenic
January 1, 2022 – March 31, 2022
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2021 – August 31, 2023
ResolvedMonitoring and Reporting (DBP)
—TTHM
July 1, 2021 – October 31, 2021
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
July 1, 2021 – October 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2021 – June 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2021 – May 31, 2021
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2020 – August 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2020 – July 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2019 – June 30, 2019
ResolvedMaximum Contaminant Level Violation, Average
Health-basedArsenic
July 1, 2018 – September 30, 2018
ResolvedMaximum Contaminant Level Violation, Average
Health-basedArsenic
April 1, 2018 – June 30, 2018
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2017 – November 15, 2017
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2017 – June 30, 2017
ResolvedMaximum Contaminant Level Violation, Average
Health-basedArsenic
October 1, 2016 – December 31, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2016 – December 31, 2016
ResolvedMaximum Contaminant Level Violation, Average
Health-basedArsenic
July 1, 2016 – September 30, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2015 – December 31, 2015
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2015 – June 30, 2015
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2011 – December 23, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2011 – September 30, 2011
Resolved
Unaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| January 1, 2026 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Unaddressed |
| July 1, 2025 – October 31, 2025 | Monitoring and Reporting (DBP) | TTHM | — | Archived |
| January 1, 2025 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Unaddressed |
| July 1, 2024 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Unaddressed |
| October 1, 2022 – August 31, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2022 – September 30, 2022 | Maximum Contaminant Level Violation, Average | Arsenic | Health-based | Resolved |
| April 1, 2022 – June 30, 2022 | Maximum Contaminant Level Violation, Average | Arsenic | Health-based | Resolved |
| January 1, 2022 – March 31, 2022 | Maximum Contaminant Level Violation, Average | Arsenic | Health-based | Resolved |
| October 1, 2021 – August 31, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2021 – October 31, 2021 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| July 1, 2021 – October 31, 2021 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| June 1, 2021 – June 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2021 – May 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2020 – August 31, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2020 – July 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2019 – June 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2018 – September 30, 2018 | Maximum Contaminant Level Violation, Average | Arsenic | Health-based | Resolved |
| April 1, 2018 – June 30, 2018 | Maximum Contaminant Level Violation, Average | Arsenic | Health-based | Resolved |
| October 1, 2017 – November 15, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2016 – December 31, 2016 | Maximum Contaminant Level Violation, Average | Arsenic | Health-based | Resolved |
| October 1, 2016 – December 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2016 – September 30, 2016 | Maximum Contaminant Level Violation, Average | Arsenic | Health-based | Resolved |
| October 1, 2015 – December 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2015 – June 30, 2015 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2011 – December 23, 2011 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2011 – September 30, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Unaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
Enforcement actions
- February 5, 2026State Violation/Reminder Notice1 linked violation
- January 30, 2026State Formal Notice of Violation issued1 linked violation
- December 3, 2025State Violation/Reminder Notice1 linked violation
- November 3, 2025State Violation/Reminder Notice1 linked violation
- October 16, 2025State Formal Notice of Violation issued1 linked violation
- October 16, 2025State Formal Notice of Violation issued1 linked violation
- October 16, 2025State Public Notification requested1 linked violation
- October 16, 2025State Public Notification requested1 linked violation
- October 14, 2025State Compliance achieved1 linked violation
- October 14, 2025State Compliance achieved1 linked violation
- September 11, 2025State Formal Notice of Violation issued1 linked violation
- September 11, 2025State Public Notification requested1 linked violation
- September 5, 2025State Violation/Reminder Notice1 linked violation
- January 23, 2025State Formal Notice of Violation issued1 linked violation
- January 23, 2025State Formal Notice of Violation issued1 linked violation
- August 31, 2023State Compliance achieved1 linked violation
- August 31, 2023State Compliance achieved1 linked violation
- August 31, 2023State Compliance achieved1 linked violation
- February 14, 2023State Compliance achieved1 linked violation
- February 14, 2023State Compliance achieved1 linked violation
- February 14, 2023State Compliance achieved1 linked violation
- November 22, 2022State Formal Notice of Violation issued1 linked violation
- November 21, 2022State Public Notification received1 linked violation
- November 3, 2022State Compliance Meeting conducted1 linked violation
- November 3, 2022State Violation/Reminder Notice1 linked violation
- November 3, 2022State Public Notification requested1 linked violation
- August 31, 2022State Violation/Reminder Notice1 linked violation
- June 14, 2022State Public Notification requested1 linked violation
- June 14, 2022State Compliance Meeting conducted1 linked violation
- June 14, 2022State Formal Notice of Violation issued1 linked violation
- May 3, 2022State Compliance achieved2 linked violations
- April 7, 2022State Public Notification received1 linked violation
- April 5, 2022State Public Notification requested1 linked violation
- April 5, 2022State Formal Notice of Violation issued1 linked violation
- April 5, 2022State Compliance Meeting conducted1 linked violation
- March 14, 2022State Public Notification received2 linked violations
- February 22, 2022State Formal Notice of Violation issued2 linked violations
- February 22, 2022State Public Notification requested2 linked violations
- November 4, 2021State Violation/Reminder Notice2 linked violations
- October 14, 2021State Public Notification requested1 linked violation
- October 14, 2021State Formal Notice of Violation issued1 linked violation
- September 27, 2021State Violation/Reminder Notice2 linked violations
- September 16, 2021State Violation/Reminder Notice1 linked violation
- August 24, 2021State Violation/Reminder Notice1 linked violation
- August 3, 2021State Public Notification requested1 linked violation
- August 3, 2021State Formal Notice of Violation issued1 linked violation
- July 26, 2021State Compliance achieved1 linked violation
- July 26, 2021State Compliance achieved1 linked violation
- June 14, 2021State Public Notification requested1 linked violation
- June 14, 2021State Formal Notice of Violation issued1 linked violation
- February 23, 2021State Public Notification requested1 linked violation
- February 23, 2021State Formal Notice of Violation issued1 linked violation
- August 27, 2020State Public Notification received2 linked violations
- August 19, 2020State Formal Notice of Violation issued2 linked violations
- August 19, 2020State Public Notification requested2 linked violations
- August 13, 2020State Compliance achieved2 linked violations
- July 31, 2019State Compliance achieved3 linked violations
- July 5, 2019State Compliance achieved9 linked violations
- June 13, 2019State Public Notification requested1 linked violation
- June 13, 2019State Formal Notice of Violation issued1 linked violation
- April 29, 2019State Compliance achieved2 linked violations
- April 15, 2019State Formal Notice of Violation issued2 linked violations
- April 15, 2019State Public Notification requested2 linked violations
- January 22, 2019State Public Notification received1 linked violation
- January 8, 2019State Public Notification requested1 linked violation
- January 8, 2019State Compliance Meeting conducted1 linked violation
- January 8, 2019State Violation/Reminder Notice1 linked violation
- September 13, 2018State Public Notification received3 linked violations
- September 6, 2018State Violation/Reminder Notice1 linked violation
- September 6, 2018State Compliance Meeting conducted3 linked violations
- August 2, 2018State Public Notification received8 linked violations
- July 24, 2018State Public Notification requested4 linked violations
- June 20, 2018State Formal Notice of Violation issued2 linked violations
- June 20, 2018State Public Notification requested2 linked violations
- June 6, 2018State Compliance achieved2 linked violations
- June 1, 2018State Violation/Reminder Notice1 linked violation
- June 1, 2018State Public Notification requested1 linked violation
- June 1, 2018State Compliance Meeting conducted1 linked violation
- May 15, 2018State Public Notification requested1 linked violation
- May 15, 2018State Formal Notice of Violation issued1 linked violation
- March 27, 2018State Compliance Meeting conducted1 linked violation
- March 27, 2018State Violation/Reminder Notice1 linked violation
- March 27, 2018State Public Notification requested1 linked violation
- November 15, 2017State Formal Notice of Violation issued2 linked violations
- November 15, 2017State Compliance achieved2 linked violations
- November 15, 2017State Public Notification requested2 linked violations
- November 9, 2017State Public Notification received1 linked violation
- October 31, 2017State Public Notification requested1 linked violation
- October 31, 2017State Violation/Reminder Notice6 linked violations
- October 31, 2017State Compliance Meeting conducted3 linked violations
- October 23, 2017State Administrative/Compliance Order with penalty issued2 linked violations
- October 23, 2017State Violation/Reminder Notice1 linked violation
- October 6, 2017State Public Notification received14 linked violations
- September 22, 2017State Compliance Meeting conducted4 linked violations
- September 22, 2017State Public Notification requested2 linked violations
- July 25, 2017State Compliance achieved2 linked violations
- July 18, 2017State Formal Notice of Violation issued2 linked violations
- July 18, 2017State Public Notification requested2 linked violations
- June 6, 2017State Violation/Reminder Notice1 linked violation
- March 22, 2017State Administrative/Compliance Order without penalty issued3 linked violations
- March 15, 2017State Compliance achieved2 linked violations
- February 15, 2017State Compliance Meeting conducted1 linked violation
- February 15, 2017State Public Notification requested3 linked violations
- January 23, 2017State Public Notification requested3 linked violations
- November 10, 2016State Public Notification received1 linked violation
- October 25, 2016State Formal Notice of Violation issued5 linked violations
- March 29, 2016State Compliance achieved5 linked violations
- January 19, 2016State Formal Notice of Violation issued2 linked violations
- January 19, 2016State Public Notification requested2 linked violations
- January 12, 2016State Compliance achieved2 linked violations
- December 11, 2015State Violation/Reminder Notice1 linked violation
- August 18, 2015State Compliance achieved2 linked violations
- July 20, 2015State Formal Notice of Violation issued2 linked violations
- July 20, 2015State Public Notification requested2 linked violations
- June 15, 2015State Violation/Reminder Notice1 linked violation
- December 30, 2014State Compliance achieved1 linked violation
- June 19, 2014State Violation/Reminder Notice1 linked violation
- August 9, 2013State Public Notification received1 linked violation
- July 12, 2013State Violation/Reminder Notice1 linked violation
- October 1, 2012State Administrative/Compliance Order without penalty issued1 linked violation
- June 11, 2012State Violation/Reminder Notice1 linked violation
- May 16, 2012State Administrative/Compliance Order without penalty issued1 linked violation
- March 28, 2012State Public Notification received63 linked violations
- March 21, 2012State Violation/Reminder Notice1 linked violation
- December 23, 2011State Compliance achieved3 linked violations
- November 18, 2011State Formal Notice of Violation issued1 linked violation
- November 18, 2011State Public Notification requested1 linked violation
- November 14, 2011State Public Notification received5 linked violations
- November 14, 2011State Compliance achieved5 linked violations
- November 10, 2011State Public Notification requested3 linked violations
- September 19, 2011State Violation/Reminder Notice1 linked violation
- September 13, 2011State Violation/Reminder Notice1 linked violation
- September 6, 2011State Violation/Reminder Notice4 linked violations
- July 8, 2010State Violation/Reminder Notice1 linked violation
- April 8, 2010State Public Notification received1 linked violation
- March 30, 2010State Public Notification requested1 linked violation
- March 30, 2010State Compliance Meeting conducted1 linked violation
- March 30, 2010State Formal Notice of Violation issued1 linked violation
- January 15, 1995State Violation/Reminder Notice1 linked violation
- January 15, 1995State Formal Notice of Violation issued1 linked violation
- January 15, 1995State Public Notification requested1 linked violation
- April 15, 1994State Public Notification requested1 linked violation
- April 15, 1994State Violation/Reminder Notice1 linked violation
- April 15, 1994State Formal Notice of Violation issued1 linked violation
- September 30, 1984State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- September 30, 1984State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 30, 1982State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 30, 1981State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
Common questions
Is Climax required to publish a Consumer Confidence Report?
- Yes. Climax is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is Climax’s next Consumer Confidence Report due?
- Climax’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does Climax have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 3 items for Climax that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
Climax City Council
2188572715
Climax, MN 56523-0214