SIMS, IL · Wayne County
SIMS Water System
Consumer Confidence Report status
SIMS must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 1 open health-based violation for SIMS, alongside 2 other open items.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Illinois’s official records. Always confirm current status with Illinois before making decisions based on this information.
System facts
- System ID (PWSID)
- IL1910400
- System type
- Community Water System
- Population served
- 244
- Service connections
- 116
- Ownership
- local government
- Water source
- surface water (rivers, lakes, or reservoirs)
SIMS is one of 1,572 community water systems in Illinois in the 500 or fewer people size category, serving 244 people from surface water.
As of August 1, 2026, its federal record holds 33 entries between 1994 and 2025, of which 1 health-based item remains open, alongside 2 other open entries.
Of the 33, 26 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Total Coliform Rules, the Stage 1 Disinfectants and Disinfection Byproducts Rule, and the Lead and Copper Rule.
Violation history
Follow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2025
UnaddressedMonitoring and Reporting (DBP)
—Chloramine
October 1, 2025 – October 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2025 – October 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chloramine
September 1, 2025 – September 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2025 – September 30, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 22, 2025 – January 24, 2026
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2025 – August 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chloramine
August 1, 2025 – August 31, 2025
ResolvedNotification, Known or Potential LSL
—LEAD AND COPPER RULE REVISIONS
July 2, 2025
UnaddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025 – January 24, 2026
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chloramine
July 1, 2025 – July 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2025 – June 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chloramine
June 1, 2025 – June 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chloramine
May 1, 2025 – May 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2025 – May 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chloramine
April 1, 2025 – April 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chloramine
March 1, 2025 – March 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2025 – March 31, 2025
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2025 – December 31, 2025
ArchivedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2025 – December 31, 2025
ArchivedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024
UnaddressedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – January 24, 2026
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – July 28, 2021
ResolvedTreatment Technique Precursor Removal
Health-basedCARBON, TOTAL
July 1, 2014 – September 30, 2014
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2013 – September 26, 2014
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
December 1, 1998 – December 31, 1998
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1997 – January 31, 1997
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1996 – November 30, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1996 – October 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1995 – February 28, 1995
ArchivedMaximum Contaminant Level Violation, Average
Health-basedAtrazine
January 1, 1994 – March 31, 1994
Resolved
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| October 1, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| October 1, 2025 – October 31, 2025 | Monitoring and Reporting (DBP) | Chloramine | — | Resolved |
| October 1, 2025 – October 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2025 – September 30, 2025 | Monitoring and Reporting (DBP) | Chloramine | — | Resolved |
| September 1, 2025 – September 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 22, 2025 – January 24, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2025 – August 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2025 – August 31, 2025 | Monitoring and Reporting (DBP) | Chloramine | — | Resolved |
| July 2, 2025 | Notification, Known or Potential LSL | LEAD AND COPPER RULE REVISIONS | — | Unaddressed |
| July 1, 2025 – January 24, 2026 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | Chloramine | — | Resolved |
| June 1, 2025 – June 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2025 – June 30, 2025 | Monitoring and Reporting (DBP) | Chloramine | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring and Reporting (DBP) | Chloramine | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring and Reporting (DBP) | Chloramine | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring and Reporting (DBP) | Chloramine | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2025 – December 31, 2025 | Monitoring and Reporting (DBP) | TTHM | — | Archived |
| January 1, 2025 – December 31, 2025 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Archived |
| October 17, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Unaddressed |
| July 1, 2024 – January 24, 2026 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2021 – July 28, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2014 – September 30, 2014 | Treatment Technique Precursor Removal | CARBON, TOTAL | Health-based | Resolved |
| October 1, 2013 – September 26, 2014 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| December 1, 1998 – December 31, 1998 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1997 – January 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| November 1, 1996 – November 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1996 – October 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 1995 – February 28, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1994 – March 31, 1994 | Maximum Contaminant Level Violation, Average | Atrazine | Health-based | Resolved |
Unaddressed no corrective action on record yetResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Compliance achieved1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received2 linked violations
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Public Notification received1 linked violation
- January 24, 2026State Compliance achieved2 linked violations
- December 23, 2025State Formal Notice of Violation issued7 linked violations
- December 16, 2025State Violation/Reminder Notice1 linked violation
- December 16, 2025State Public Notification requested1 linked violation
- December 16, 2025State Public Notification requested1 linked violation
- December 16, 2025State Violation/Reminder Notice1 linked violation
- November 25, 2025State Violation/Reminder Notice1 linked violation
- November 25, 2025State Violation/Reminder Notice1 linked violation
- November 25, 2025State Public Notification requested1 linked violation
- November 25, 2025State Public Notification requested1 linked violation
- November 20, 2025State Compliance achieved8 linked violations
- November 20, 2025State Compliance achieved8 linked violations
- October 30, 2025State Violation/Reminder Notice1 linked violation
- October 30, 2025State Violation/Reminder Notice1 linked violation
- October 30, 2025State Public Notification requested1 linked violation
- October 30, 2025State Public Notification requested1 linked violation
- October 21, 2025State Violation/Reminder Notice1 linked violation
- October 21, 2025State Public Notification requested1 linked violation
- October 14, 2025State Public Notification requested2 linked violations
- October 14, 2025State Violation/Reminder Notice2 linked violations
- October 9, 2025State Violation/Reminder Notice1 linked violation
- October 9, 2025State Violation/Reminder Notice1 linked violation
- October 9, 2025State Public Notification requested1 linked violation
- October 9, 2025State Public Notification requested1 linked violation
- September 24, 2025State Violation/Reminder Notice1 linked violation
- September 17, 2025State Violation/Reminder Notice1 linked violation
- September 17, 2025State Public Notification requested1 linked violation
- September 17, 2025State Violation/Reminder Notice1 linked violation
- September 17, 2025State Public Notification requested1 linked violation
- August 22, 2025State Violation/Reminder Notice1 linked violation
- August 22, 2025State Public Notification requested1 linked violation
- August 22, 2025State Violation/Reminder Notice1 linked violation
- August 22, 2025State Public Notification requested1 linked violation
- July 30, 2025State Violation/Reminder Notice1 linked violation
- July 22, 2025State Public Notification requested1 linked violation
- July 22, 2025State Violation/Reminder Notice1 linked violation
- July 3, 2025State Violation/Reminder Notice1 linked violation
- July 3, 2025State Public Notification requested1 linked violation
- June 13, 2025State Public Notification requested1 linked violation
- June 13, 2025State Public Notification requested1 linked violation
- June 13, 2025State Violation/Reminder Notice1 linked violation
- June 13, 2025State Violation/Reminder Notice1 linked violation
- May 2, 2025State Violation/Reminder Notice1 linked violation
- May 2, 2025State Public Notification requested1 linked violation
- May 2, 2025State Violation/Reminder Notice1 linked violation
- May 2, 2025State Public Notification requested1 linked violation
- July 31, 2024State Violation/Reminder Notice1 linked violation
- July 28, 2021State Compliance achieved1 linked violation
- July 22, 2021State Violation/Reminder Notice1 linked violation
- January 2, 2015State Compliance achieved1 linked violation
- December 26, 2014State Public Notification received1 linked violation
- December 1, 2014State Violation/Reminder Notice1 linked violation
- December 1, 2014State Intentional no-action1 linked violation
- December 1, 2014State Public Notification requested1 linked violation
- June 23, 2014State Public Notification received2 linked violations
- October 15, 2013State Public Notification requested2 linked violations
- March 15, 1999State Public Notification requested2 linked violations
- March 15, 1999State Violation/Reminder Notice2 linked violations
- February 15, 1999State Public Notification requested2 linked violations
- February 15, 1999State Violation/Reminder Notice2 linked violations
- December 15, 1998State Public Notification requested1 linked violation
- December 15, 1998State Violation/Reminder Notice1 linked violation
- February 8, 1997State Violation/Reminder Notice1 linked violation
- February 8, 1997State Public Notification requested1 linked violation
- January 16, 1997State Public Notification received2 linked violations
- January 11, 1997State Public Notification requested1 linked violation
- January 11, 1997State Violation/Reminder Notice1 linked violation
- May 11, 1995State Public Notification requested1 linked violation
- May 11, 1995State Violation/Reminder Notice1 linked violation
- April 7, 1994State Compliance achieved1 linked violation
- February 22, 1994State Violation/Reminder Notice1 linked violation
Common questions
Is SIMS required to publish a Consumer Confidence Report?
- Yes. SIMS is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is SIMS’s next Consumer Confidence Report due?
- SIMS’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does SIMS have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 1 open health-based violation for SIMS, alongside 2 other open items.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
MATTHEWS, KARRIE
618-895-2761
SIMS, IL 62886