MARBLEHEAD, CT · Windham County
BROOKWOOD APARTMENTS Water System
Current status
1 open health-based violation on record as of July 4, 2026, alongside 1 other open item(s). See the violation history below for contaminant and status details.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Connecticut’s official records. Always confirm current status with Connecticut before making decisions based on this information.
System facts
- System ID (PWSID)
- CT1699011
- System type
- Community Water System
- Population served
- 44
- Service connections
- 22
- Ownership
- privately owned
- Water source
- groundwater (wells)
Violation history
Consumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
August 10, 2025 – October 7, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025 – October 7, 2025
ResolvedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024
UnaddressedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024
UnaddressedPublic Notification Violation for NPDWR Violation
—Public Notice
September 27, 2024 – May 15, 2025
ResolvedTreatment Technique, Level 1 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
July 9, 2024 – August 1, 2024
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
August 10, 2022 – October 3, 2022
ResolvedMonitoring, Source Water (GWR)
—E. COLI
August 23, 2021 – February 17, 2022
ResolvedMonitoring, Source Water (GWR)
—E. COLI
August 23, 2021 – March 9, 2022
ResolvedReporting, Assessment Forms (RTCR)
—Revised Total Coliform Rule
August 22, 2021 – February 7, 2022
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
January 16, 2021 – October 12, 2021
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
August 10, 2020 – February 3, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 20, 2019 – October 12, 2021
ResolvedReporting, Assessment Forms (RTCR)
—Revised Total Coliform Rule
November 2, 2019 – November 7, 2019
ResolvedTreatment Technique, Level 2 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
September 28, 2019 – November 7, 2019
ResolvedMonitoring, Source Water (GWR)
—E. COLI
September 4, 2019 – October 1, 2019
ResolvedMonitoring, Source Water (GWR)
—E. COLI
September 4, 2019 – October 1, 2019
ResolvedMonitoring, Source Water (GWR)
—E. COLI
September 4, 2019 – October 1, 2019
ResolvedTreatment Technique, Level 1 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
August 23, 2019 – August 29, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 19, 2018 – April 26, 2018
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
January 1, 2018 – December 31, 2020
ResolvedLead Consumer Notice
—Lead and Copper Rule
December 30, 2017 – December 6, 2018
ResolvedTreatment Technique, Level 1 Assessment (RTCR)
Health-basedRevised Total Coliform Rule
September 7, 2017 – August 20, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2017 – August 31, 2017
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2016 – June 23, 2015
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 26, 2015 – March 17, 2016
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
August 10, 2015 – August 10, 2015
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 30, 2015 – June 2, 2015
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 2014 – October 31, 2014
ResolvedMonitoring, Source Water (GWR)
—E. COLI
September 11, 2014 – July 31, 2017
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
September 1, 2014 – September 30, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2014 – July 31, 2014
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
June 1, 2014 – June 30, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2013 – June 30, 2013
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
May 1, 2013 – May 31, 2013
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
August 10, 2009 – August 14, 2009
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 30, 2009 – June 30, 2011
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 15, 2009 – June 30, 2011
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
August 10, 2008 – August 21, 2008
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—ManMade Beta Particle and Photon Emitter
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—ManMade Beta Particle and Photon Emitter
October 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
October 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2007 – September 30, 2007
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2007 – September 30, 2007
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2007 – September 30, 2007
ResolvedMonitoring, Regular
—ManMade Beta Particle and Photon Emitter
July 1, 2007 – September 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2007 – June 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2007 – April 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2007 – January 31, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2006 – September 30, 2006
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
August 10, 2006 – September 6, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2006 – August 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2006 – July 31, 2006
ResolvedMonitoring, Regular
—Gross Beta Particle Activity
July 1, 2006 – September 30, 2006
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2006 – September 6, 2007
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2006 – September 30, 2006
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2006 – September 30, 2006
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2006 – September 30, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2006 – June 30, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2006 – May 31, 2006
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2006 – June 30, 2006
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2006 – June 30, 2006
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
August 10, 2005 – September 6, 2007
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2005 – September 6, 2007
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
August 10, 2004 – November 22, 2004
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2004 – November 22, 2004
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2003 – September 30, 2003
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2003 – August 31, 2003
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2002 – September 30, 2002
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1998 – September 30, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1997 – June 30, 1997
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 1995 – January 30, 1997
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 1994 – September 29, 1998
ArchivedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 1993 – September 30, 1993
Resolved
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| August 10, 2025 – October 7, 2025 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2025 – October 7, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| October 17, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Unaddressed |
| October 17, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Unaddressed |
| September 27, 2024 – May 15, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 9, 2024 – August 1, 2024 | Treatment Technique, Level 1 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| August 10, 2022 – October 3, 2022 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| August 23, 2021 – February 17, 2022 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| August 23, 2021 – March 9, 2022 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| August 22, 2021 – February 7, 2022 | Reporting, Assessment Forms (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 16, 2021 – October 12, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 10, 2020 – February 3, 2021 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| December 20, 2019 – October 12, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 2, 2019 – November 7, 2019 | Reporting, Assessment Forms (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 28, 2019 – November 7, 2019 | Treatment Technique, Level 2 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| September 4, 2019 – October 1, 2019 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| September 4, 2019 – October 1, 2019 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| September 4, 2019 – October 1, 2019 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| August 23, 2019 – August 29, 2019 | Treatment Technique, Level 1 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| April 19, 2018 – April 26, 2018 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2018 – December 31, 2020 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| December 30, 2017 – December 6, 2018 | Lead Consumer Notice | Lead and Copper Rule | — | Resolved |
| September 7, 2017 – August 20, 2017 | Treatment Technique, Level 1 Assessment (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| August 1, 2017 – August 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2016 – June 23, 2015 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| November 26, 2015 – March 17, 2016 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 10, 2015 – August 10, 2015 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| May 30, 2015 – June 2, 2015 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2014 – October 31, 2014 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| September 11, 2014 – July 31, 2017 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| September 1, 2014 – September 30, 2014 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2014 – July 31, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2014 – June 30, 2014 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| June 1, 2013 – June 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2013 – May 31, 2013 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| August 10, 2009 – August 14, 2009 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| May 30, 2009 – June 30, 2011 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 15, 2009 – June 30, 2011 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 10, 2008 – August 21, 2008 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| March 1, 2008 – March 31, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | ManMade Beta Particle and Photon Emitter | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | ManMade Beta Particle and Photon Emitter | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring, Regular | ManMade Beta Particle and Photon Emitter | — | Resolved |
| June 1, 2007 – June 30, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2007 – April 30, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2007 – January 31, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2006 – September 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 10, 2006 – September 6, 2007 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| August 1, 2006 – August 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2006 – July 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2006 – September 30, 2006 | Monitoring, Regular | Gross Beta Particle Activity | — | Resolved |
| July 1, 2006 – September 6, 2007 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2006 – September 30, 2006 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| July 1, 2006 – September 30, 2006 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2006 – September 30, 2006 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| June 1, 2006 – June 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2006 – May 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2006 – June 30, 2006 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2006 – June 30, 2006 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| August 10, 2005 – September 6, 2007 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2005 – September 6, 2007 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| August 10, 2004 – November 22, 2004 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2004 – November 22, 2004 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| September 1, 2003 – September 30, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2003 – August 31, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2002 – September 30, 2002 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
| July 1, 1998 – September 30, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1997 – June 30, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1995 – January 30, 1997 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Archived |
| January 1, 1994 – September 29, 1998 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Archived |
| July 1, 1993 – September 30, 1993 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- December 31, 2025State Violation/Reminder Notice1 linked violation
- October 7, 2025State Compliance achieved1 linked violation
- October 7, 2025State Compliance achieved1 linked violation
- May 15, 2025State Public Notification received1 linked violation
- May 15, 2025State Compliance achieved1 linked violation
- November 19, 2024State Violation/Reminder Notice1 linked violation
- August 27, 2024State Public Notification requested1 linked violation
- August 27, 2024State Violation/Reminder Notice1 linked violation
- August 1, 2024State Compliance achieved1 linked violation
- January 27, 2023State Public Notification received1 linked violation
- October 3, 2022State Compliance achieved1 linked violation
- March 9, 2022State Compliance achieved1 linked violation
- February 17, 2022State Compliance achieved1 linked violation
- February 7, 2022State Public Notification requested1 linked violation
- February 7, 2022State Compliance achieved1 linked violation
- February 7, 2022State Violation/Reminder Notice1 linked violation
- February 3, 2022State Public Notification received1 linked violation
- February 3, 2022State Public Notification received1 linked violation
- December 1, 2021State Public Notification requested1 linked violation
- December 1, 2021State Violation/Reminder Notice1 linked violation
- December 1, 2021State Public Notification requested1 linked violation
- December 1, 2021State Violation/Reminder Notice1 linked violation
- October 12, 2021State Compliance achieved1 linked violation
- October 12, 2021State Public Notification received1 linked violation
- October 12, 2021State Compliance achieved1 linked violation
- October 12, 2021State Public Notification received1 linked violation
- October 12, 2021State Public Notification received1 linked violation
- May 10, 2021State Violation/Reminder Notice1 linked violation
- February 3, 2021State Compliance achieved1 linked violation
- December 31, 2020State Compliance achieved1 linked violation
- December 23, 2020State Public Notification requested1 linked violation
- December 23, 2020State Violation/Reminder Notice1 linked violation
- January 17, 2020State Violation/Reminder Notice1 linked violation
- January 16, 2020State Public Notification requested1 linked violation
- January 16, 2020State Violation/Reminder Notice1 linked violation
- January 7, 2020State Public Notification received1 linked violation
- January 7, 2020State Public Notification received2 linked violations
- January 7, 2020State Public Notification received1 linked violation
- December 9, 2019State Public Notification requested1 linked violation
- December 9, 2019State Public Notification requested1 linked violation
- December 9, 2019State Violation/Reminder Notice1 linked violation
- December 9, 2019State Violation/Reminder Notice1 linked violation
- December 9, 2019State Violation/Reminder Notice1 linked violation
- December 9, 2019State Public Notification requested1 linked violation
- November 19, 2019State Public Notification requested1 linked violation
- November 19, 2019State Violation/Reminder Notice1 linked violation
- November 7, 2019State Public Notification received1 linked violation
- November 7, 2019State Compliance achieved1 linked violation
- November 7, 2019State Compliance achieved1 linked violation
- October 18, 2019State Public Notification requested1 linked violation
- October 18, 2019State Violation/Reminder Notice1 linked violation
- October 1, 2019State Compliance achieved3 linked violations
- August 29, 2019State Compliance achieved1 linked violation
- December 6, 2018State Compliance achieved1 linked violation
- October 3, 2018State Violation/Reminder Notice1 linked violation
- May 24, 2018State Public Notification received1 linked violation
- May 23, 2018State Violation/Reminder Notice1 linked violation
- April 26, 2018State Compliance achieved1 linked violation
- March 19, 2018State Violation/Reminder Notice1 linked violation
- March 19, 2018State Public Notification requested1 linked violation
- January 26, 2018State Public Notification received1 linked violation
- January 8, 2018State Violation/Reminder Notice1 linked violation
- January 8, 2018State Public Notification requested1 linked violation
- September 30, 2017State Compliance achieved1 linked violation
- August 20, 2017State Compliance achieved1 linked violation
- July 31, 2017State Compliance achieved1 linked violation
- March 17, 2016State Public Notification received1 linked violation
- March 17, 2016State Compliance achieved1 linked violation
- March 17, 2016State Public Notification received1 linked violation
- March 7, 2016State Violation/Reminder Notice1 linked violation
- March 2, 2016State Violation/Reminder Notice1 linked violation
- August 10, 2015State Compliance achieved1 linked violation
- June 25, 2015State Public Notification received1 linked violation
- June 23, 2015State Compliance achieved1 linked violation
- June 9, 2015State Violation/Reminder Notice1 linked violation
- June 2, 2015State Compliance achieved1 linked violation
- April 29, 2015State Public Notification requested1 linked violation
- April 29, 2015State Administrative Penalty assessed1 linked violation
- April 29, 2015State Formal Notice of Violation issued1 linked violation
- March 10, 2015State Public Notification received1 linked violation
- December 5, 2014State Formal Notice of Violation issued1 linked violation
- November 30, 2014State Compliance achieved1 linked violation
- November 25, 2014State Public Notification requested1 linked violation
- November 25, 2014State Public Notification requested1 linked violation
- November 25, 2014State Violation/Reminder Notice1 linked violation
- November 25, 2014State Violation/Reminder Notice1 linked violation
- November 12, 2014State Compliance achieved1 linked violation
- August 31, 2014State Compliance achieved1 linked violation
- August 31, 2014State Compliance achieved1 linked violation
- June 26, 2014State Public Notification requested1 linked violation
- June 26, 2014State Violation/Reminder Notice1 linked violation
- October 26, 2013State Compliance achieved1 linked violation
- September 17, 2013State Violation/Reminder Notice1 linked violation
- July 31, 2013State Compliance achieved1 linked violation
- June 19, 2013State Public Notification received1 linked violation
- June 5, 2013State Violation/Reminder Notice1 linked violation
- June 5, 2013State Public Notification requested1 linked violation
- June 30, 2011State Intentional no-action2 linked violations
- August 9, 2010State Violation/Reminder Notice2 linked violations
- October 21, 2009State Violation/Reminder Notice1 linked violation
- August 14, 2009State Compliance achieved1 linked violation
- November 12, 2008State Violation/Reminder Notice1 linked violation
- September 30, 2008State Compliance achieved1 linked violation
- August 21, 2008State Compliance achieved1 linked violation
- June 30, 2008State Compliance achieved5 linked violations
- June 13, 2008State Compliance achieved1 linked violation
- May 29, 2008State Violation/Reminder Notice5 linked violations
- May 29, 2008State Public Notification requested5 linked violations
- April 12, 2008State Administrative/Compliance Order with penalty issued1 linked violation
- March 14, 2008State Violation/Reminder Notice9 linked violations
- March 14, 2008State Public Notification requested4 linked violations
- March 10, 2008State Public Notification received1 linked violation
- February 22, 2008State Public Notification requested1 linked violation
- February 22, 2008State Administrative/Compliance Order with penalty issued1 linked violation
- January 30, 2008State Compliance achieved5 linked violations
- January 17, 2008State Public Notification received2 linked violations
- December 31, 2007State Compliance achieved2 linked violations
- December 31, 2007State Compliance achieved4 linked violations
- December 11, 2007State Violation/Reminder Notice3 linked violations
- September 6, 2007State Compliance achieved2 linked violations
- September 6, 2007State Intentional no-action5 linked violations
- June 6, 2007State Compliance achieved1 linked violation
- April 2, 2007State Violation/Reminder Notice11 linked violations
- March 31, 2007State Compliance achieved5 linked violations
- January 5, 2007State Public Notification received3 linked violations
- December 31, 2006State Compliance achieved7 linked violations
- December 11, 2006State Public Notification requested3 linked violations
- November 15, 2006State Administrative/Compliance Order with penalty issued3 linked violations
- September 11, 2006State Public Notification requested1 linked violation
- September 11, 2006State Public Notification requested1 linked violation
- June 30, 2006State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- January 20, 2006State Compliance achieved3 linked violations
- January 17, 2006State Administrative/Compliance Order with penalty issued2 linked violations
- November 15, 2005State Violation/Reminder Notice1 linked violation
- November 15, 2005State Violation/Reminder Notice1 linked violation
- December 1, 2004State Public Notification received2 linked violations
- November 22, 2004State Compliance achieved2 linked violations
- March 18, 2004State Compliance achieved1 linked violation
- January 20, 2004State Public Notification requested1 linked violation
- January 20, 2004State Administrative/Compliance Order with penalty issued1 linked violation
- January 15, 2004State Compliance achieved2 linked violations
- October 27, 2003State Public Notification requested1 linked violation
- October 23, 2003State Administrative/Compliance Order with penalty issued1 linked violation
- March 31, 2003State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- October 15, 2002State Public Notification received1 linked violation
- October 2, 2002State Violation/Reminder Notice1 linked violation
- October 2, 2002State Public Notification requested1 linked violation
- June 30, 2001State Compliance achieved1 linked violation
- September 15, 2000State Public Notification requested5 linked violations
- August 23, 1999State Violation/Reminder Notice13 linked violations
- March 2, 1999State Compliance achieved11 linked violations
- September 29, 1998State Compliance achieved10 linked violations
- January 30, 1997State Compliance achieved9 linked violations
- July 22, 1996State Public Notification requested18 linked violations
- July 22, 1996State Violation/Reminder Notice16 linked violations
- June 24, 1996State Bilateral Compliance Agreement signed12 linked violations
- June 23, 1996State Bilateral Compliance Agreement signed11 linked violations
- May 26, 1996State Civil Case concluded9 linked violations
- April 17, 1996State Violation/Reminder Notice6 linked violations
- November 4, 1995State Civil Case filed in State court7 linked violations
- January 21, 1994State Public Notification requested12 linked violations
- October 1, 1993State Public Notification received5 linked violations
- January 27, 1993State Violation/Reminder Notice22 linked violations
- December 10, 1991State Compliance achieved1 linked violation
- December 1, 1991State Public Notification received1 linked violation
- October 31, 1991State Technical Assistance Visit1 linked violation
- October 21, 1991State Public Notification requested1 linked violation
- October 10, 1991State Violation/Reminder Notice1 linked violation
Contact
HURD, DOUGLAS
781-771-2810
MARBLEHEAD, MA 01945