CLINTON, CT · Middlesex County
CTWC - JENSENS BEECHWOOD SYSTEM Water System
Consumer Confidence Report status
CTWC - JENSENS BEECHWOOD SYSTEM must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show no open violations for CTWC - JENSENS BEECHWOOD SYSTEM.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Connecticut’s official records. Always confirm current status with Connecticut before making decisions based on this information.
System facts
- System ID (PWSID)
- CT0700011
- System type
- Community Water System
- Population served
- 750
- Service connections
- 294
- Ownership
- privately owned
- Water source
- groundwater (wells)
CTWC - JENSENS BEECHWOOD SYSTEM is one of 84 community water systems in Connecticut in the 501 to 3,300 people size category, serving 750 people from groundwater.
As of August 1, 2026, its federal record holds 50 entries between 2005 and 2023, all of which EPA lists as closed. Nothing has been added since 2023.
Of the 50, 26 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Radionuclides and Revised Rad Rule, synthetic organic chemicals, and the Total Coliform Rules.
Violation history
Maximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
August 1, 2023 – August 31, 2023
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2016 – June 24, 2016
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
July 1, 2014 – September 30, 2014
ResolvedMonitoring, Regular
—Combined Uranium
July 1, 2014 – September 30, 2014
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2014 – September 30, 2014
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 14, 2011 – May 11, 2011
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2011 – March 31, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2010 – December 31, 2010
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2010 – August 31, 2010
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2010 – September 30, 2010
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2010 – September 29, 2010
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2010 – June 30, 2010
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2010 – March 31, 2010
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2009 – December 31, 2009
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2009 – June 30, 2009
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2009 – June 30, 2009
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2009 – March 31, 2009
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2008 – December 31, 2008
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2008 – December 31, 2008
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2008 – September 30, 2008
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2008 – June 30, 2008
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2008 – March 31, 2008
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2007 – December 31, 2007
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2007 – December 31, 2007
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
July 1, 2007 – September 30, 2007
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
April 1, 2007 – June 30, 2007
ResolvedMonitoring, Regular
—Nitrite
January 1, 2007 – December 31, 2007
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
January 1, 2007 – March 31, 2007
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2006 – December 31, 2006
ResolvedMaximum Contaminant Level Violation, Average
Health-basedCombined Uranium
October 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2006 – September 30, 2006
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2006 – June 30, 2006
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2006 – June 30, 2006
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2006 – June 30, 2006
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2006 – March 31, 2006
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2006 – March 31, 2006
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2006 – March 31, 2006
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2006 – March 31, 2006
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Chlordane
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Aldicarb
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—2,4-D
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2005 – December 31, 2007
Resolved
Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| August 1, 2023 – August 31, 2023 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| July 1, 2016 – June 24, 2016 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2014 – September 30, 2014 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| July 1, 2014 – September 30, 2014 | Monitoring, Regular | Combined Uranium | — | Resolved |
| July 1, 2014 – September 30, 2014 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| May 14, 2011 – May 11, 2011 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2011 – March 31, 2011 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| December 1, 2010 – December 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2010 – December 31, 2010 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| August 1, 2010 – August 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2010 – September 30, 2010 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| July 1, 2010 – September 29, 2010 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| April 1, 2010 – June 30, 2010 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| January 1, 2010 – March 31, 2010 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| October 1, 2009 – December 31, 2009 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| April 1, 2009 – June 30, 2009 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| April 1, 2009 – June 30, 2009 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| January 1, 2009 – March 31, 2009 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| October 1, 2008 – December 31, 2008 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| October 1, 2008 – December 31, 2008 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| July 1, 2008 – September 30, 2008 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| April 1, 2008 – June 30, 2008 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| January 1, 2008 – March 31, 2008 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| October 1, 2007 – December 31, 2007 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| October 1, 2007 – December 31, 2007 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| July 1, 2007 – September 30, 2007 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| April 1, 2007 – June 30, 2007 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 2007 – March 31, 2007 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| October 1, 2006 – December 31, 2006 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2006 – December 31, 2006 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2006 – December 31, 2006 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2006 – December 31, 2006 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2006 – December 31, 2006 | Maximum Contaminant Level Violation, Average | Combined Uranium | Health-based | Resolved |
| July 1, 2006 – September 30, 2006 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2006 – June 30, 2006 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2006 – June 30, 2006 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2006 – June 30, 2006 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2006 – March 31, 2006 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2006 – March 31, 2006 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2006 – March 31, 2006 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2006 – March 31, 2006 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Aldicarb | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
Resolved addressed and confirmed by the state
Enforcement actions
- August 24, 2023State Public Notification received2 linked violations
- November 25, 2014State Violation/Reminder Notice3 linked violations
- November 20, 2014State Compliance achieved4 linked violations
- June 30, 2011State Compliance achieved18 linked violations
- May 11, 2011State Public Notification received1 linked violation
- May 11, 2011State Compliance achieved1 linked violation
- May 11, 2011State Compliance achieved1 linked violation
- April 13, 2011State Public Notification requested1 linked violation
- April 13, 2011State Violation/Reminder Notice1 linked violation
- March 25, 2011State Violation/Reminder Notice2 linked violations
- December 31, 2010State Compliance achieved33 linked violations
- December 31, 2010State Compliance achieved32 linked violations
- December 22, 2010State Public Notification received7 linked violations
- December 9, 2010State Violation/Reminder Notice4 linked violations
- September 30, 2010State Compliance achieved2 linked violations
- August 10, 2010State Public Notification requested8 linked violations
- August 10, 2010State Violation/Reminder Notice8 linked violations
- May 26, 2010State Public Notification requested2 linked violations
- May 26, 2010State Violation/Reminder Notice2 linked violations
- May 26, 2010State Violation/Reminder Notice8 linked violations
- March 30, 2010State Public Notification requested3 linked violations
- March 2, 2010State Violation/Reminder Notice4 linked violations
- November 2, 2009State Violation/Reminder Notice3 linked violations
- November 2, 2009State Violation/Reminder Notice3 linked violations
- August 10, 2009State Public Notification received3 linked violations
- July 1, 2009State Public Notification requested3 linked violations
- July 1, 2009State Public Notification requested3 linked violations
- January 20, 2009State Public Notification received3 linked violations
- December 17, 2008State Violation/Reminder Notice1 linked violation
- December 12, 2008State Administrative/Compliance Order without penalty issued35 linked violations
- August 14, 2008State Violation/Reminder Notice5 linked violations
- June 27, 2008State Public Notification received5 linked violations
- May 29, 2008State Violation/Reminder Notice5 linked violations
- April 24, 2008State Public Notification received33 linked violations
- February 19, 2008State Violation/Reminder Notice3 linked violations
- December 21, 2007State Public Notification received3 linked violations
- November 27, 2007State Public Notification requested7 linked violations
- September 6, 2007State Public Notification received6 linked violations
- September 6, 2007State Public Notification received7 linked violations
- July 25, 2007State Public Notification received30 linked violations
- May 23, 2007State Public Notification requested7 linked violations
- April 24, 2007State Compliance achieved8 linked violations
- March 20, 2007State Public Notification requested4 linked violations
- March 20, 2007State Violation/Reminder Notice48 linked violations
- March 16, 2007State Violation/Reminder Notice6 linked violations
- September 25, 2006State Violation/Reminder Notice9 linked violations
- September 5, 2006State Public Notification requested10 linked violations
- February 9, 2006State Public Notification received4 linked violations
- January 23, 2006State Public Notification requested2 linked violations
- October 17, 1995State Administrative/Compliance Order with penalty issued7 linked violations
Common questions
Is CTWC - JENSENS BEECHWOOD SYSTEM required to publish a Consumer Confidence Report?
- Yes. CTWC - JENSENS BEECHWOOD SYSTEM is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is CTWC - JENSENS BEECHWOOD SYSTEM’s next Consumer Confidence Report due?
- CTWC - JENSENS BEECHWOOD SYSTEM’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does CTWC - JENSENS BEECHWOOD SYSTEM have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show no open violations for CTWC - JENSENS BEECHWOOD SYSTEM.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
MCDERMOTT, GERALD
860-664-6125
CLINTON, CT 06413