HOTCHKISS, CO · Montrose County
FRUITLAND DOMESTIC WC Water System
Consumer Confidence Report status
FRUITLAND DOMESTIC WC must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 2 open health-based violations for FRUITLAND DOMESTIC WC, alongside 5 other open items.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Colorado’s official records. Always confirm current status with Colorado before making decisions based on this information.
System facts
- System ID (PWSID)
- CO0115288
- System type
- Community Water System
- Population served
- 335
- Service connections
- 151
- Ownership
- privately owned
- Water source
- surface water (rivers, lakes, or reservoirs)
FRUITLAND DOMESTIC WC is one of 1,060 community water systems in Colorado in the 500 or fewer people size category, serving 335 people from surface water.
As of August 1, 2026, its federal record holds 174 entries between 2001 and 2026, of which 2 health-based items remain open, alongside 5 other open entries.
Of the 174, 127 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Surface Water Treatment Rules, volatile organic chemicals, and synthetic organic chemicals.
Violation history
Lead Consumer Notice
—Lead and Copper Rule
April 1, 2026
UnaddressedPublic Notification Violation for NPDWR Violation
—Public Notice
March 13, 2026
AddressedPublic Education
Health-basedLead and Copper Rule
March 1, 2026
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
February 21, 2026
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2026 – February 27, 2026
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 5, 2025
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
November 20, 2025 – January 4, 2026
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
November 1, 2025 – November 30, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2025 – November 30, 2025
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
October 1, 2025 – October 31, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2025 – October 31, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 5, 2025
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
August 31, 2025 – January 4, 2026
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
August 1, 2025 – August 31, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 2025 – August 31, 2025
ResolvedInitial, Follow-up, or Routine Source Water M/R
—Lead and Copper Rule
July 1, 2025 – October 23, 2025
ResolvedOCCT/SOWT Study/Recommendation
Health-basedLead and Copper Rule
July 1, 2025 – December 16, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
May 21, 2025 – January 4, 2026
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
April 12, 2025 – January 4, 2026
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2025 – May 27, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2025 – April 30, 2025
ResolvedPublic Education
Health-basedLead and Copper Rule
March 1, 2025 – April 2, 2025
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
February 21, 2025 – January 4, 2026
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
January 1, 2025 – March 4, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2025 – March 4, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2025 – January 31, 2025
ResolvedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024 – October 30, 2024
ResolvedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024 – October 30, 2024
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
September 1, 2024 – November 12, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2024 – September 30, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 2024 – July 31, 2024
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
July 1, 2024 – December 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2024 – September 30, 2024
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
July 1, 2024 – July 31, 2024
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 24, 2024
AddressedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2024 – February 29, 2024
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
February 1, 2024 – February 29, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2023 – November 30, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2023 – October 9, 2023
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
May 1, 2023 – May 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2023 – December 31, 2023
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
December 1, 2022 – December 31, 2022
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
October 1, 2022 – October 31, 2022
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2022 – October 31, 2022
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
May 1, 2022 – May 31, 2022
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 2022 – May 31, 2022
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2021 – November 30, 2021
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
November 1, 2021 – November 30, 2021
ResolvedMonitoring, Turbidity (Enhanced SWTR)
—Interim Enhanced Surface Water Treatment Rule
March 1, 2021 – March 31, 2021
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2021 – February 28, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2020 – December 14, 2020
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2020 – March 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – March 31, 2020
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2020 – February 29, 2020
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2020 – May 1, 2020
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Fluoride
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Arsenic
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Barium
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Cadmium
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Chromium
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Mercury
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Nickel
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Selenium
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Nitrate
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Benzene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Toluene
January 1, 2019 – December 31, 2019
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2019 – December 31, 2019
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
July 16, 2017 – May 30, 2018
ResolvedMonitoring, Regular
—Chlordane
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—2,4-D
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—LASSO
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Atrazine
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Aldicarb
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Aldicarb sulfone
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Simazine
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Dalapon
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2017 – December 31, 2019
ResolvedPublic Education
Health-basedLead and Copper Rule
December 1, 2016 – December 19, 2016
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2016 – December 31, 2016
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2014 – December 31, 2014
ResolvedWater Quality Parameter M/R
—Lead and Copper Rule
January 1, 2013 – June 30, 2013
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2011 – December 31, 2011
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2011 – October 31, 2011
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
May 1, 2011 – May 31, 2011
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2011 – April 30, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2011 – April 30, 2011
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
November 1, 2010 – November 30, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
October 1, 2010 – July 25, 2011
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
September 1, 2010 – September 30, 2010
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
June 1, 2010 – June 30, 2010
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
May 1, 2010 – May 31, 2010
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
April 1, 2010 – April 30, 2010
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Mercury
January 1, 2010 – December 31, 2010
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
January 1, 2010 – January 31, 2010
ResolvedMonitoring, Regular
—Chromium
January 1, 2010 – December 31, 2010
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
December 1, 2009 – December 31, 2009
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
November 1, 2009 – November 30, 2009
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
October 1, 2009 – October 31, 2009
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
September 1, 2009 – September 30, 2009
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
August 1, 2009 – August 31, 2009
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
July 1, 2009 – July 31, 2009
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
June 1, 2009 – June 30, 2009
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
May 1, 2009 – May 31, 2009
ResolvedSingle Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
May 1, 2009 – May 31, 2009
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
April 1, 2009 – April 30, 2009
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
March 1, 2009 – March 31, 2009
ResolvedMonitoring and Reporting (DBP)
—TTHM
October 1, 2008 – December 31, 2008
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
July 1, 2008 – July 31, 2008
ResolvedSingle Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
May 1, 2008 – May 31, 2008
ResolvedMonitoring, Regular
—Fluoride
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Selenium
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Styrene
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Barium
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—Nitrate
January 1, 2008 – December 31, 2008
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
January 1, 2008 – January 31, 2008
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2008 – December 31, 2008
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2008 – December 31, 2008
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
December 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Radium-228
October 1, 2007 – December 31, 2007
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
September 1, 2007 – September 30, 2007
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
August 1, 2007 – August 31, 2007
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
November 1, 2005 – November 30, 2005
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
July 1, 2005 – July 31, 2005
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
June 1, 2002 – June 30, 2002
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
May 1, 2002 – May 31, 2002
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
January 1, 2002 – January 31, 2002
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
May 1, 2001 – May 31, 2001
Resolved
Unaddressed no corrective action on record yetAddressed corrective action reported, pending final confirmationResolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| April 1, 2026 | Lead Consumer Notice | Lead and Copper Rule | — | Unaddressed |
| March 13, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| March 1, 2026 | Public Education | Lead and Copper Rule | Health-based | Addressed |
| February 21, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| February 1, 2026 – February 27, 2026 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| December 5, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| November 20, 2025 – January 4, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2025 – November 30, 2025 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| November 1, 2025 – November 30, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2025 – October 31, 2025 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| October 1, 2025 – October 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 5, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| August 31, 2025 – January 4, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2025 – August 31, 2025 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| August 1, 2025 – August 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2025 – October 23, 2025 | Initial, Follow-up, or Routine Source Water M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2025 – December 16, 2025 | OCCT/SOWT Study/Recommendation | Lead and Copper Rule | Health-based | Resolved |
| May 21, 2025 – January 4, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 12, 2025 – January 4, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2025 – May 27, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2025 – April 2, 2025 | Public Education | Lead and Copper Rule | Health-based | Resolved |
| February 21, 2025 – January 4, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2025 – March 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2025 – March 4, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2025 – January 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 17, 2024 – October 30, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Resolved |
| October 17, 2024 – October 30, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Resolved |
| September 1, 2024 – November 12, 2024 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2024 – September 30, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2024 – July 31, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2024 – December 31, 2024 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2024 – September 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2024 – July 31, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| February 24, 2024 | Failure To Address Deficiency | Groundwater Rule | Health-based | Addressed |
| February 1, 2024 – February 29, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2024 – February 29, 2024 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| November 1, 2023 – November 30, 2023 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2023 – October 9, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| May 1, 2023 – May 31, 2023 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| January 1, 2023 – December 31, 2023 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| December 1, 2022 – December 31, 2022 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| October 1, 2022 – October 31, 2022 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| October 1, 2022 – October 31, 2022 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2022 – May 31, 2022 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| May 1, 2022 – May 31, 2022 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2021 – November 30, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2021 – November 30, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| March 1, 2021 – March 31, 2021 | Monitoring, Turbidity (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | — | Resolved |
| February 1, 2021 – February 28, 2021 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2020 – December 14, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2020 – March 31, 2020 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2020 – February 29, 2020 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2020 – May 1, 2020 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Nickel | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| July 16, 2017 – May 30, 2018 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Aldicarb | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| December 1, 2016 – December 19, 2016 | Public Education | Lead and Copper Rule | Health-based | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| October 1, 2014 – December 31, 2014 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2013 – June 30, 2013 | Water Quality Parameter M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2011 – December 31, 2011 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2011 – October 31, 2011 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2011 – May 31, 2011 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| April 1, 2011 – April 30, 2011 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2011 – April 30, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2010 – November 30, 2010 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Resolved |
| October 1, 2010 – July 25, 2011 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2010 – September 30, 2010 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| June 1, 2010 – June 30, 2010 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| May 1, 2010 – May 31, 2010 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| April 1, 2010 – April 30, 2010 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| January 1, 2010 – December 31, 2010 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2010 – December 31, 2010 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 2010 – December 31, 2010 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2010 – January 31, 2010 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| January 1, 2010 – December 31, 2010 | Monitoring, Regular | Chromium | — | Resolved |
| December 1, 2009 – December 31, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| November 1, 2009 – November 30, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| October 1, 2009 – October 31, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| September 1, 2009 – September 30, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| August 1, 2009 – August 31, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| July 1, 2009 – July 31, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| June 1, 2009 – June 30, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| May 1, 2009 – May 31, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| May 1, 2009 – May 31, 2009 | Single Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| April 1, 2009 – April 30, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| March 1, 2009 – March 31, 2009 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| July 1, 2008 – July 31, 2008 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| May 1, 2008 – May 31, 2008 | Single Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2008 – January 31, 2008 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| December 1, 2007 – December 31, 2007 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Radium-228 | — | Resolved |
| September 1, 2007 – September 30, 2007 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| August 1, 2007 – August 31, 2007 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| November 1, 2005 – November 30, 2005 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| July 1, 2005 – July 31, 2005 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| June 1, 2002 – June 30, 2002 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2002 – May 31, 2002 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Resolved |
| January 1, 2002 – January 31, 2002 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Resolved |
| May 1, 2001 – May 31, 2001 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Resolved |
Unaddressed no corrective action on record yetAddressed corrective action reported, pending final confirmationResolved addressed and confirmed by the state
Enforcement actions
- March 30, 2026State Administrative/Compliance Order without penalty issuedgeneral compliance action — not tied to a specific violation on record
- March 23, 2026State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- February 10, 2026State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 10, 2026State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- January 6, 2026State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 6, 2026State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 4, 2026State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- January 4, 2026State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- December 23, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- December 23, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 16, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- December 8, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 8, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 23, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- September 18, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- September 18, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 17, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- September 17, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 17, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 12, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 5, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- August 5, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- August 5, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- August 5, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 10, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- June 9, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 20, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 20, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 20, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- May 20, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- May 2, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- April 2, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 12, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 7, 2025State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 4, 2025State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- February 12, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 21, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- January 13, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- December 11, 2024State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- November 7, 2024State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- November 7, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 7, 2024State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- October 30, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- October 14, 2024State Public Notification requested3 linked violations
- October 14, 2024State Violation/Reminder Notice3 linked violations
- August 14, 2024State Compliance achieved3 linked violations
- August 13, 2024State Public Notification requested4 linked violations
- May 2, 2024State Compliance achieved3 linked violations
- April 4, 2024State Public Notification requested1 linked violation
- March 13, 2024State Compliance achieved3 linked violations
- December 12, 2023State Public Notification requested3 linked violations
- October 9, 2023State Compliance achieved2 linked violations
- September 6, 2023State Compliance achieved1 linked violation
- August 18, 2023State Public Notification requested2 linked violations
- August 2, 2023State Compliance achieved1 linked violation
- July 13, 2023State Public Notification requested11 linked violations
- July 10, 2023State Compliance achieved3 linked violations
- July 6, 2023State Compliance achieved1 linked violation
- June 15, 2023State Violation/Reminder Notice3 linked violations
- June 15, 2023State Public Notification requested2 linked violations
- January 19, 2023State Public Notification requested3 linked violations
- December 1, 2022State Public Notification requested3 linked violations
- June 24, 2022State Public Notification requested3 linked violations
- June 17, 2022State Violation/Reminder Notice1 linked violation
- June 17, 2022State Public Notification requested2 linked violations
- June 17, 2022State Public Notification requested2 linked violations
- May 8, 2022State Compliance achieved6 linked violations
- April 13, 2022State Public Notification requested1 linked violation
- April 13, 2022State Violation/Reminder Notice1 linked violation
- April 13, 2022State Violation/Reminder Notice1 linked violation
- February 1, 2022State Violation/Reminder Notice1 linked violation
- February 1, 2022State Public Notification requested1 linked violation
- January 11, 2022State Public Notification requested1 linked violation
- January 11, 2022State Public Notification requested1 linked violation
- January 11, 2022State Violation/Reminder Notice1 linked violation
- January 11, 2022State Violation/Reminder Notice1 linked violation
- December 14, 2021State Violation/Reminder Notice1 linked violation
- December 14, 2021State Public Notification requested1 linked violation
- December 14, 2021State Violation/Reminder Notice1 linked violation
- December 14, 2021State Public Notification requested1 linked violation
- November 10, 2021State Compliance achieved2 linked violations
- October 14, 2021State Public Notification requested1 linked violation
- October 14, 2021State Public Notification requested1 linked violation
- October 14, 2021State Violation/Reminder Notice1 linked violation
- October 14, 2021State Violation/Reminder Notice1 linked violation
- June 29, 2021State Compliance achieved1 linked violation
- June 8, 2021State Compliance achieved6 linked violations
- May 13, 2021State Public Notification requested1 linked violation
- May 13, 2021State Public Notification requested1 linked violation
- May 13, 2021State Violation/Reminder Notice1 linked violation
- May 13, 2021State Violation/Reminder Notice1 linked violation
- April 14, 2021State Public Notification requested1 linked violation
- April 14, 2021State Public Notification requested1 linked violation
- April 14, 2021State Violation/Reminder Notice1 linked violation
- April 14, 2021State Violation/Reminder Notice1 linked violation
- March 11, 2021State Public Notification requested2 linked violations
- March 11, 2021State Violation/Reminder Notice2 linked violations
- February 10, 2021State Compliance achieved2 linked violations
- January 12, 2021State Public Notification requested1 linked violation
- January 12, 2021State Public Notification requested1 linked violation
- January 12, 2021State Violation/Reminder Notice1 linked violation
- January 12, 2021State Violation/Reminder Notice1 linked violation
- January 6, 2021State Violation/Reminder Notice1 linked violation
- January 6, 2021State Public Notification requested1 linked violation
- December 14, 2020State Compliance achieved1 linked violation
- November 8, 2020State Compliance achieved2 linked violations
- October 15, 2020State Public Notification requested1 linked violation
- October 15, 2020State Public Notification requested1 linked violation
- October 15, 2020State Violation/Reminder Notice1 linked violation
- October 15, 2020State Violation/Reminder Notice1 linked violation
- August 4, 2020State Public Notification requested1 linked violation
- August 4, 2020State Violation/Reminder Notice1 linked violation
- May 15, 2020State Violation/Reminder Notice1 linked violation
- May 1, 2020State Compliance achieved1 linked violation
- April 28, 2020State Compliance achieved5 linked violations
- April 23, 2020State Violation/Reminder Notice3 linked violations
- April 23, 2020State Public Notification requested3 linked violations
- March 25, 2020State Violation/Reminder Notice2 linked violations
- March 25, 2020State Public Notification requested2 linked violations
- March 4, 2020State Public Notification received1 linked violation
- February 18, 2020State Compliance achieved64 linked violations
- February 10, 2020State Public Notification requested1 linked violation
- February 10, 2020State Violation/Reminder Notice1 linked violation
- February 6, 2020State Public Notification requested31 linked violations
- February 6, 2020State Public Notification requested21 linked violations
- February 6, 2020State Violation/Reminder Notice21 linked violations
- February 6, 2020State Public Notification requested1 linked violation
- February 6, 2020State Violation/Reminder Notice1 linked violation
- February 6, 2020State Public Notification requested10 linked violations
- February 6, 2020State Violation/Reminder Notice10 linked violations
- February 6, 2020State Public Notification requested1 linked violation
- February 6, 2020State Violation/Reminder Notice1 linked violation
- February 6, 2020State Violation/Reminder Notice31 linked violations
- May 30, 2018State Compliance achieved1 linked violation
- April 27, 2018State Violation/Reminder Notice1 linked violation
- December 19, 2016State Compliance achieved2 linked violations
- December 19, 2016State Public Notification received1 linked violation
- December 2, 2016State Violation/Reminder Notice1 linked violation
- December 2, 2016State Public Notification requested1 linked violation
- November 9, 2016State Violation/Reminder Notice3 linked violations
- May 31, 2015State Compliance achieved6 linked violations
- December 19, 2014State Public Notification requested2 linked violations
- December 19, 2014State Violation/Reminder Notice2 linked violations
- December 19, 2014State Violation/Reminder Notice1 linked violation
- December 19, 2014State Violation/Reminder Notice2 linked violations
- August 7, 2013State Violation/Reminder Notice3 linked violations
- May 4, 2012State Compliance achieved7 linked violations
- April 30, 2012State Compliance achieved105 linked violations
- February 6, 2012State Public Notification received6 linked violations
- January 11, 2012State Public Notification received3 linked violations
- December 12, 2011State Violation/Reminder Notice2 linked violations
- December 12, 2011State Administrative/Compliance Order without penalty issued10 linked violations
- December 7, 2011State Public Notification requested1 linked violation
- December 7, 2011State Violation/Reminder Notice1 linked violation
- December 7, 2011State Public Notification requested1 linked violation
- December 7, 2011State Violation/Reminder Notice1 linked violation
- December 7, 2011State Violation/Reminder Notice1 linked violation
- December 7, 2011State Public Notification requested1 linked violation
- August 24, 2011State Public Notification received2 linked violations
- July 25, 2011State Compliance achieved10 linked violations
- July 25, 2011State Compliance achieved1 linked violation
- July 21, 2011State Public Notification requested2 linked violations
- July 21, 2011State Violation/Reminder Notice2 linked violations
- June 29, 2011State Public Notification received11 linked violations
- June 8, 2011State Violation/Reminder Notice1 linked violation
- June 8, 2011State Public Notification requested1 linked violation
- June 8, 2011State Violation/Reminder Notice1 linked violation
- June 8, 2011State Public Notification requested1 linked violation
- June 8, 2011State Violation/Reminder Notice1 linked violation
- June 8, 2011State Public Notification requested1 linked violation
- June 1, 2011State Public Notification received1 linked violation
- April 26, 2011State Public Notification requested1 linked violation
- April 26, 2011State Violation/Reminder Notice1 linked violation
- April 26, 2011State Public Notification requested1 linked violation
- April 26, 2011State Violation/Reminder Notice1 linked violation
- April 21, 2011State Public Notification received1 linked violation
- March 24, 2011State Public Notification received1 linked violation
- February 23, 2011State Public Notification received1 linked violation
- February 9, 2011State Public Notification requested11 linked violations
- February 8, 2011State Public Notification requested2 linked violations
- February 2, 2011State Public Notification received1 linked violation
- January 27, 2011State Public Notification received1 linked violation
- January 7, 2011State Violation/Reminder Notice2 linked violations
- December 20, 2010State Public Notification received2 linked violations
- December 10, 2010State Violation/Reminder Notice3 linked violations
- December 10, 2010State Public Notification requested2 linked violations
- December 7, 2010State Public Notification received1 linked violation
- November 4, 2010State Public Notification requested1 linked violation
- November 4, 2010State Violation/Reminder Notice1 linked violation
- October 26, 2010State Public Notification received2 linked violations
- October 7, 2010State Violation/Reminder Notice2 linked violations
- October 7, 2010State Public Notification requested3 linked violations
- October 4, 2010State Public Notification received1 linked violation
- September 15, 2010State Public Notification received3 linked violations
- September 8, 2010State Violation/Reminder Notice2 linked violations
- August 4, 2010State Public Notification requested1 linked violation
- August 4, 2010State Violation/Reminder Notice1 linked violation
- June 10, 2010State Public Notification requested2 linked violations
- June 10, 2010State Violation/Reminder Notice2 linked violations
- May 4, 2010State Public Notification received3 linked violations
- April 6, 2010State Public Notification received1 linked violation
- March 10, 2010State Violation/Reminder Notice3 linked violations
- March 10, 2010State Public Notification requested1 linked violation
- January 13, 2010State Public Notification requested2 linked violations
- January 13, 2010State Public Notification requested2 linked violations
- November 12, 2009State Violation/Reminder Notice3 linked violations
- November 5, 2009State Public Notification received3 linked violations
- September 22, 2009State Public Notification requested2 linked violations
- August 31, 2009State Violation/Reminder Notice2 linked violations
- August 6, 2009State Violation/Reminder Notice1 linked violation
- August 6, 2009State Public Notification requested1 linked violation
- July 10, 2009State Public Notification requested2 linked violations
- July 10, 2009State Public Notification requested2 linked violations
- July 8, 2009State Compliance achieved57 linked violations
- July 6, 2009State Compliance achieved1 linked violation
- May 27, 2009State Violation/Reminder Notice2 linked violations
- May 6, 2009State Violation/Reminder Notice3 linked violations
- May 6, 2009State Public Notification requested2 linked violations
- April 20, 2009State Compliance achieved2 linked violations
- January 29, 2009State Public Notification requested2 linked violations
- January 29, 2009State Violation/Reminder Notice2 linked violations
- January 29, 2009State Public Notification requested21 linked violations
- January 29, 2009State Violation/Reminder Notice21 linked violations
- January 29, 2009State Public Notification requested1 linked violation
- January 29, 2009State Violation/Reminder Notice3 linked violations
- January 29, 2009State Violation/Reminder Notice22 linked violations
- January 29, 2009State Public Notification requested11 linked violations
- January 29, 2009State Violation/Reminder Notice11 linked violations
- January 26, 2009State Public Notification received1 linked violation
- January 2, 2009State Public Notification received1 linked violation
- December 1, 2008State Public Notification requested1 linked violation
- December 1, 2008State Violation/Reminder Notice1 linked violation
- November 20, 2008State Public Notification received1 linked violation
- November 3, 2008State Violation/Reminder Notice1 linked violation
- November 3, 2008State Public Notification requested1 linked violation
- October 24, 2008State Public Notification received1 linked violation
- October 20, 2008State Violation/Reminder Notice1 linked violation
- October 20, 2008State Public Notification requested1 linked violation
- October 7, 2008State Public Notification received1 linked violation
- September 18, 2008State Public Notification received1 linked violation
- September 8, 2008State Public Notification requested1 linked violation
- September 8, 2008State Violation/Reminder Notice1 linked violation
- August 25, 2008State Compliance achieved1 linked violation
- August 13, 2008State Compliance achieved1 linked violation
- August 12, 2008State Compliance achieved2 linked violations
- August 12, 2008State Public Notification requested1 linked violation
- August 12, 2008State Public Notification requested1 linked violation
- August 12, 2008State Violation/Reminder Notice1 linked violation
- August 12, 2008State Violation/Reminder Notice1 linked violation
- July 24, 2008State Public Notification received4 linked violations
- July 7, 2008State Violation/Reminder Notice1 linked violation
- July 7, 2008State Public Notification requested1 linked violation
- July 7, 2008State Violation/Reminder Notice1 linked violation
- July 7, 2008State Public Notification requested1 linked violation
- June 25, 2008State Public Notification received1 linked violation
- June 4, 2008State Public Notification requested1 linked violation
- June 4, 2008State Violation/Reminder Notice1 linked violation
- May 9, 2008State Violation/Reminder Notice1 linked violation
- May 9, 2008State Public Notification requested1 linked violation
- May 6, 2008State Violation/Reminder Notice1 linked violation
- May 6, 2008State Public Notification requested1 linked violation
- April 23, 2008State Public Notification received1 linked violation
- April 9, 2008State Public Notification requested1 linked violation
- April 9, 2008State Violation/Reminder Notice1 linked violation
- April 4, 2008State Compliance achieved7 linked violations
- March 26, 2008State Public Notification received1 linked violation
- March 13, 2008State Compliance achieved1 linked violation
- March 11, 2008State Public Notification received1 linked violation
- March 7, 2008State Public Notification requested1 linked violation
- March 7, 2008State Violation/Reminder Notice1 linked violation
- February 20, 2008State Public Notification received1 linked violation
- February 13, 2008State Public Notification requested1 linked violation
- February 13, 2008State Violation/Reminder Notice1 linked violation
- February 11, 2008State Violation/Reminder Notice1 linked violation
- February 11, 2008State Public Notification requested1 linked violation
- February 6, 2008State Violation/Reminder Notice2 linked violations
- February 6, 2008State Public Notification requested2 linked violations
- February 5, 2008State Compliance achieved1 linked violation
- January 17, 2008State Public Notification received1 linked violation
- January 14, 2008State Violation/Reminder Notice1 linked violation
- January 14, 2008State Public Notification requested1 linked violation
- December 13, 2007State Public Notification requested1 linked violation
- December 13, 2007State Public Notification received1 linked violation
- November 8, 2007State Violation/Reminder Notice3 linked violations
- November 8, 2007State Public Notification requested8 linked violations
- March 21, 2007State Violation/Reminder Notice29 linked violations
- September 12, 2006State Public Notification requested6 linked violations
- April 24, 2006State Boil Water Order40 linked violations
- December 23, 2005State Violation/Reminder Notice1 linked violation
- December 23, 2005State Public Notification requested1 linked violation
- October 17, 2005State Violation/Reminder Notice7 linked violations
- June 15, 2004State Public Notification requested3 linked violations
- January 15, 2004State Violation/Reminder Notice5 linked violations
- December 11, 2003State Public Notification received4 linked violations
- August 30, 2003State Boil Water Order22 linked violations
- August 15, 2003State Public Notification requested4 linked violations
- August 11, 2003State Public Notification received1 linked violation
- May 1, 2003State Public Notification received3 linked violations
- January 9, 2003State Public Notification requested1 linked violation
- January 9, 2003State Violation/Reminder Notice2 linked violations
- July 2, 2002State Public Notification requested1 linked violation
- July 2, 2002State Formal Notice of Violation issued3 linked violations
- October 22, 2001State Formal Notice of Violation issued1 linked violation
- August 20, 2001State Public Notification requested1 linked violation
- July 23, 2001State Formal Notice of Violation issued1 linked violation
- July 23, 2001State Public Notification requested1 linked violation
- June 13, 2001State Formal Notice of Violation issued1 linked violation
- January 22, 2001State Public Notification requested4 linked violations
- December 18, 2000State Public Notification requested1 linked violation
- October 29, 1997State Public Notification requested1 linked violation
Common questions
Is FRUITLAND DOMESTIC WC required to publish a Consumer Confidence Report?
- Yes. FRUITLAND DOMESTIC WC is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is FRUITLAND DOMESTIC WC’s next Consumer Confidence Report due?
- FRUITLAND DOMESTIC WC’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does FRUITLAND DOMESTIC WC have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 2 open health-based violations for FRUITLAND DOMESTIC WC, alongside 5 other open items.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
MCCOLLUM, MISCHELL
970-901-0513
HOTCHKISS, CO 81419