SILOAM SPRINGS, AR · Benton County
LEISURE HILLS MOBILE HOME PARK Water System
Consumer Confidence Report status
LEISURE HILLS MOBILE HOME PARK must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 18 open health-based violations for LEISURE HILLS MOBILE HOME PARK, alongside 8 other open items.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Arkansas’s official records. Always confirm current status with Arkansas before making decisions based on this information.
System facts
- System ID (PWSID)
- AR0000747
- System type
- Community Water System
- Population served
- 113
- Service connections
- 45
- Ownership
- local government
- Water source
- groundwater (wells)
LEISURE HILLS MOBILE HOME PARK is one of 363 community water systems in Arkansas in the 500 or fewer people size category, serving 113 people from groundwater.
As of August 1, 2026, its federal record holds 76 entries between 1994 and 2025, of which 18 health-based items remain open, alongside 8 other open entries.
Of the 76, 24 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves the Stage 1 Disinfectants and Disinfection Byproducts Rule, the Total Coliform Rules, and the Public Notice Rule and Revised PN Rule.
Violation history
Treatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2025
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
November 1, 2025
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2025 – January 13, 2026
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2025
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2025 – October 31, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
September 1, 2025
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
August 1, 2025
AddressedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
July 1, 2025
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2025
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2025
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
May 1, 2025
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2025
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
March 1, 2025
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2025
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
January 1, 2025
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2024
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
November 1, 2024
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2024
AddressedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
October 1, 2024
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
September 1, 2024
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
August 1, 2024
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2024
AddressedPublic Notification Violation for NPDWR Violation
—Public Notice
May 1, 2024 – August 6, 2024
ResolvedMonitoring, Source Water (GWR)
—E. COLI
December 1, 2023
AddressedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
April 1, 2023
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2023 – June 14, 2023
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
March 1, 2023
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
March 1, 2023 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2023 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
January 1, 2023 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2022 – March 28, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 1, 2022 – February 9, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
November 1, 2022 – March 28, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2022 – January 4, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2022 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
September 1, 2022 – March 28, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 1, 2022 – January 4, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
August 1, 2022 – March 28, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2022
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2022 – March 28, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
June 1, 2022
AddressedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2022 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
May 1, 2022 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2022 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
March 1, 2022 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2022 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
January 1, 2022 – March 28, 2023
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2021 – March 28, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2021 – August 31, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021
AddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – February 28, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2021 – January 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2019 – July 31, 2019
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2019 – December 9, 2019
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2018 – July 20, 2018
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
November 1, 2017 – January 30, 2018
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
June 1, 2015 – June 30, 2015
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2014 – September 30, 2014
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2014 – July 31, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2013 – February 28, 2013
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 2010 – November 30, 2010
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
September 1, 2009 – September 30, 2009
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2009 – June 30, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2008 – December 31, 2008
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2008 – June 30, 2008
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2007 – December 31, 2007
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 2006 – October 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2005 – August 31, 2005
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2004 – March 31, 2004
ResolvedNotification, Public
—Coliform (TCR)
December 1, 1998 – December 31, 1998
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1997 – September 30, 1997
ArchivedNotification, Public
—Coliform (TCR)
June 1, 1997 – June 30, 1997
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1994 – August 31, 1994
ArchivedNotification, Public
—Coliform (TCR)
May 1, 1994 – May 31, 1994
ArchivedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
May 1, 1994 – May 31, 1994
Archived
Addressed corrective action reported, pending final confirmationResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| December 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| November 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| October 1, 2025 – January 13, 2026 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| October 1, 2025 – October 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| August 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| July 1, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Addressed |
| July 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| May 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| April 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| March 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| February 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| January 1, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| December 1, 2024 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| November 1, 2024 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| October 1, 2024 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| October 1, 2024 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Addressed |
| September 1, 2024 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| August 1, 2024 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| July 1, 2024 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Addressed |
| May 1, 2024 – August 6, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| December 1, 2023 | Monitoring, Source Water (GWR) | E. COLI | — | Addressed |
| April 1, 2023 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Addressed |
| April 1, 2023 – June 14, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| March 1, 2023 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Addressed |
| March 1, 2023 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| February 1, 2023 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| January 1, 2023 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| December 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| November 1, 2022 – February 9, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| October 1, 2022 – January 4, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| September 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| September 1, 2022 – January 4, 2023 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| July 1, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| July 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| June 1, 2022 | Public Notification Violation for NPDWR Violation | Public Notice | — | Addressed |
| June 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| May 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| April 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| March 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| February 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| January 1, 2022 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| December 1, 2021 – March 28, 2023 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| August 1, 2021 – August 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Addressed |
| February 1, 2021 – February 28, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2021 – January 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2019 – July 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2019 – December 9, 2019 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2018 – July 20, 2018 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| November 1, 2017 – January 30, 2018 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2015 – June 30, 2015 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2014 – September 30, 2014 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2014 – July 31, 2014 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| February 1, 2013 – February 28, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2010 – November 30, 2010 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2009 – September 30, 2009 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| April 1, 2009 – June 30, 2009 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2008 – December 31, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2008 – June 30, 2008 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2007 – December 31, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2006 – October 31, 2006 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2005 – August 31, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2004 – March 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 1998 – December 31, 1998 | Notification, Public | Coliform (TCR) | — | Archived |
| September 1, 1997 – September 30, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| June 1, 1997 – June 30, 1997 | Notification, Public | Coliform (TCR) | — | Archived |
| August 1, 1994 – August 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 1994 – May 31, 1994 | Notification, Public | Coliform (TCR) | — | Archived |
| May 1, 1994 – May 31, 1994 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Archived |
Addressed corrective action reported, pending final confirmationResolved addressed and confirmed by the stateArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- March 25, 2026State Public Notification received1 linked violation
- January 15, 2026State Public Notification received2 linked violations
- January 13, 2026State Compliance achieved1 linked violation
- January 13, 2026State Public Notification received1 linked violation
- December 2, 2025State Public Notification received1 linked violation
- November 4, 2025State Public Notification received1 linked violation
- September 17, 2025State Public Notification received1 linked violation
- August 12, 2025State Public Notification received1 linked violation
- July 8, 2025State Public Notification received3 linked violations
- May 23, 2025State Public Notification received1 linked violation
- May 1, 2025State Public Notification received1 linked violation
- March 25, 2025State Public Notification received2 linked violations
- March 5, 2025State Public Notification received1 linked violation
- January 6, 2025State Public Notification received2 linked violations
- October 24, 2024State Public Notification received2 linked violations
- August 6, 2024State Compliance achieved1 linked violation
- July 24, 2024State Public Notification received1 linked violation
- February 13, 2024State Public Notification received1 linked violation
- June 29, 2023State Public Notification received2 linked violations
- June 14, 2023State Compliance achieved1 linked violation
- June 9, 2023State Public Notification received2 linked violations
- April 27, 2023State Public Notification received2 linked violations
- March 28, 2023State Compliance achieved16 linked violations
- March 10, 2023State Public Notification received1 linked violation
- February 9, 2023State Public Notification received1 linked violation
- February 9, 2023State Public Notification received1 linked violation
- February 9, 2023State Compliance achieved1 linked violation
- January 4, 2023State Compliance achieved1 linked violation
- January 4, 2023State Compliance achieved1 linked violation
- January 4, 2023State Public Notification received3 linked violations
- May 17, 2022State Bilateral Compliance Agreement signed51 linked violations
- April 28, 2022State Public Notification received2 linked violations
- April 22, 2022State Administrative Penalty assessed53 linked violations
- April 6, 2022State Public Notification received1 linked violation
- April 5, 2022State Administrative/Compliance Order without penalty issued7 linked violations
- March 18, 2022State Formal Notice of Violation issued1 linked violation
- November 8, 2021State Compliance achieved1 linked violation
- July 21, 2021State Public Notification received1 linked violation
- May 18, 2021State Public Notification received2 linked violations
- May 10, 2021State Compliance achieved2 linked violations
- December 9, 2019State Compliance achieved1 linked violation
- October 11, 2019State Compliance achieved1 linked violation
- September 25, 2019State Public Notification received1 linked violation
- July 20, 2018State Compliance achieved1 linked violation
- January 30, 2018State Compliance achieved1 linked violation
- January 11, 2018State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- January 4, 2018State Public Notification requested1 linked violation
- September 22, 2016State Compliance achieved1 linked violation
- June 28, 2016State Compliance achieved3 linked violations
- October 15, 2015State Compliance achieved3 linked violations
- August 20, 2015State Public Notification received1 linked violation
- August 13, 2015State Public Notification requested1 linked violation
- August 11, 2015State Formal Notice of Violation issued3 linked violations
- December 4, 2014State Compliance achieved1 linked violation
- October 28, 2014State Compliance achieved1 linked violation
- October 20, 2014State Public Notification received1 linked violation
- October 9, 2014State Public Notification requested1 linked violation
- September 18, 2014State Public Notification received1 linked violation
- September 11, 2014State Public Notification requested1 linked violation
- August 1, 2013State Compliance achieved1 linked violation
- April 29, 2013State Public Notification received1 linked violation
- April 11, 2013State Public Notification requested1 linked violation
- October 31, 2011State Compliance achieved1 linked violation
- June 2, 2011State Compliance achieved1 linked violation
- May 13, 2010State Compliance achieved2 linked violations
- January 14, 2010State Compliance achieved3 linked violations
- August 8, 2008State Public Notification requested1 linked violation
- February 8, 2008State Public Notification requested1 linked violation
- December 7, 2007State Compliance achieved11 linked violations
- June 8, 2005State Public Notification received1 linked violation
- December 15, 1999State Formal Notice of Violation issued35 linked violations
- February 3, 1999State Public Notification requested4 linked violations
- August 4, 1997State Formal Notice of Violation issued2 linked violations
- July 29, 1997State Public Notification received2 linked violations
- July 29, 1994State Formal Notice of Violation issued3 linked violations
- October 25, 1989State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- October 25, 1989State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
Common questions
Is LEISURE HILLS MOBILE HOME PARK required to publish a Consumer Confidence Report?
- Yes. LEISURE HILLS MOBILE HOME PARK is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is LEISURE HILLS MOBILE HOME PARK’s next Consumer Confidence Report due?
- LEISURE HILLS MOBILE HOME PARK’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does LEISURE HILLS MOBILE HOME PARK have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 18 open health-based violations for LEISURE HILLS MOBILE HOME PARK, alongside 8 other open items.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
MAXWELL, JOEL
479-213-1573
SILOAM SPRINGS, AR 72761