HOPE, AR · Hempstead County
BOIS D ARC WATER SYSTEM Water System
Inactive system
This water system is marked inactive in EPA’s federal records as of September 4, 2025. It is no longer an operating public water system under this PWSID, and no compliance deadlines — including the 2027 Consumer Confidence Report rule — apply to it.
If you are a resident looking for your current water provider, see water systems in Hempstead County, AR.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Arkansas’s official records. Always confirm current status with Arkansas before making decisions based on this information.
System facts
- System ID (PWSID)
- AR0000178
- System type
- Community Water System
- Population served
- 53
- Service connections
- 15
- Ownership
- local government
- Water source
- groundwater (wells)
Violation history
Treatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2025 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2025 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
June 1, 2025 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
June 1, 2025 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2025 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2025 – June 30, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
May 1, 2025 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
May 1, 2025 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
May 1, 2025 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2025 – May 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – April 30, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 1, 2025 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2025 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
March 1, 2025 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
March 1, 2025 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
March 1, 2025 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2025 – February 28, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
February 1, 2025 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
February 1, 2025 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2025 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2025 – January 31, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
January 1, 2025 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
January 1, 2025 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
January 1, 2025 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
December 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2024 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
December 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2024 – December 31, 2024
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
November 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
November 1, 2024 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
November 1, 2024 – September 4, 2025
ArchivedLead Consumer Notice
—Lead and Copper Rule
November 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2024 – November 30, 2024
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
October 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2024 – October 31, 2024
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
September 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
September 1, 2024 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
September 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2024 – September 30, 2024
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
August 1, 2024 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
August 1, 2024 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
August 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2024 – July 31, 2024
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2024 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
July 1, 2024 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
June 1, 2024 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
June 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2024 – June 30, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2024 – May 31, 2024
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
May 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
May 1, 2024 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
May 1, 2024 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 2, 2024 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
April 1, 2024 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2024 – April 30, 2024
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
March 1, 2024 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
March 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
March 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2024 – March 31, 2024
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
February 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2024 – February 29, 2024
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
January 1, 2024 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
January 1, 2024 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
January 1, 2024 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2024 – January 31, 2024
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2023 – December 31, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
December 1, 2023 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
December 1, 2023 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2023 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
November 1, 2023 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
November 1, 2023 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2023 – November 30, 2023
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
November 1, 2023 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
October 1, 2023 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2023 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2023 – October 31, 2023
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2023 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 30, 2023
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
August 1, 2023 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
August 1, 2023 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
August 1, 2023 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2023 – August 31, 2023
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
July 1, 2023 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2023 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2023 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2023 – June 30, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
June 1, 2023 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
June 1, 2023 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2023 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2023 – May 31, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
May 1, 2023 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
May 1, 2023 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – April 30, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 1, 2023 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2023 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
March 1, 2023 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
March 1, 2023 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – March 31, 2023
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2023 – February 28, 2023
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
February 1, 2023 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
February 1, 2023 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2023 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
January 1, 2023 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
January 1, 2023 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2023 – January 31, 2023
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
December 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2022 – December 31, 2022
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
November 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – November 30, 2022
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2022 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2022 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
October 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2022 – October 31, 2022
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
September 1, 2022 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
September 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
September 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2022 – September 30, 2022
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
August 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
August 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2022 – August 31, 2022
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2022 – July 31, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2022 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
July 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2022 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
June 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – June 30, 2022
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
May 1, 2022 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
May 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
May 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2022 – May 31, 2022
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
April 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2022 – April 30, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2022 – March 31, 2022
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
March 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
March 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2022 – February 28, 2022
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
February 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2022 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
February 1, 2022 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
January 1, 2022 – September 4, 2025
ArchivedLead Consumer Notice
—Lead and Copper Rule
January 1, 2022 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
January 1, 2022 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
January 1, 2022 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2022 – January 31, 2022
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
December 1, 2021 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
December 1, 2021 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2021 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2021 – December 31, 2021
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2021 – November 30, 2021
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
November 1, 2021 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
November 1, 2021 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2021 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2021 – October 31, 2021
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
October 1, 2021 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
September 1, 2021 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
September 1, 2021 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2021 – September 9, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
July 1, 2021 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
July 1, 2021 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2021 – July 31, 2021
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2021 – September 24, 2021
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
June 1, 2021 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
June 1, 2021 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2021 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
June 1, 2021 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2021 – June 30, 2021
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
May 1, 2021 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
May 1, 2021 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
May 1, 2021 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
May 1, 2021 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2021 – May 31, 2021
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
April 1, 2021 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 1, 2021 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2021 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
April 1, 2021 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2021 – April 30, 2021
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
March 1, 2021 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
March 1, 2021 – September 24, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
March 1, 2021 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
March 1, 2021 – August 25, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2021 – March 31, 2021
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
February 1, 2021 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2021 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – February 28, 2021
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
January 1, 2021 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
January 1, 2021 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
January 1, 2021 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
January 1, 2021 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2021 – January 31, 2021
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2020 – August 25, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 1, 2020 – September 24, 2021
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
December 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2020 – December 31, 2020
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
November 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2020 – November 30, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
November 1, 2020 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
November 1, 2020 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
November 1, 2020 – September 4, 2025
ArchivedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
October 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2020 – October 31, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2020 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2020 – August 25, 2021
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
October 1, 2020 – September 4, 2025
ArchivedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
September 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2020 – September 30, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
September 1, 2020 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
September 1, 2020 – August 25, 2021
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
September 1, 2020 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
August 1, 2020 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
August 1, 2020 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
August 1, 2020 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
August 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2020 – August 31, 2020
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2020 – July 31, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2020 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2020 – August 25, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2020 – September 4, 2025
ArchivedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
July 1, 2020 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
July 1, 2020 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
June 1, 2020 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
June 1, 2020 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2020 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
June 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2020 – June 30, 2020
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
May 1, 2020 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
May 1, 2020 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
May 1, 2020 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
May 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2020 – May 31, 2020
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2020 – August 25, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2020 – April 30, 2020
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
April 1, 2020 – September 4, 2025
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
April 1, 2020 – September 24, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
April 1, 2020 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
March 1, 2020 – August 25, 2021
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
March 1, 2020 – September 24, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – March 31, 2020
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
February 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2020 – February 29, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
February 1, 2020 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2020 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
February 1, 2020 – September 4, 2025
ArchivedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – March 31, 2020
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
January 1, 2020 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
January 1, 2020 – August 25, 2021
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
December 1, 2019 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2019 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
December 1, 2019 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2019 – December 31, 2019
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
November 1, 2019 – September 4, 2025
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
November 1, 2019 – August 25, 2021
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
November 1, 2019 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2019 – November 30, 2019
ArchivedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – October 31, 2019
ArchivedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2019 – September 24, 2021
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2019 – August 25, 2021
ResolvedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
September 1, 2019 – September 4, 2025
ArchivedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
September 1, 2019 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
August 1, 2019 – September 4, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2019 – August 31, 2019
ArchivedTreatment Technique, Corrective/Expedited Actions (RTCR)
Health-basedRevised Total Coliform Rule
July 1, 2019 – September 24, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2019 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
July 1, 2019 – September 4, 2025
ArchivedReport Sample Result/Fail Monitor (RTCR)
—Revised Total Coliform Rule
June 1, 2019 – September 4, 2025
ArchivedMonitoring, Source Water (GWR)
—E. COLI
March 1, 2019 – May 8, 2019
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
February 1, 2018 – March 1, 2019
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
January 1, 2018 – March 1, 2019
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
December 1, 2017 – March 1, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
December 1, 2017 – March 1, 2019
ResolvedMonitoring, Source Water (GWR)
—E. COLI
December 1, 2017 – March 1, 2019
ResolvedMaximum Contaminant Level Violation, E. coli (RTCR)
Health-basedRevised Total Coliform Rule
December 1, 2017 – December 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2017 – November 30, 2017
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 1, 2017 – March 1, 2019
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
November 1, 2017 – March 1, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2017 – October 31, 2017
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2017 – March 1, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2017 – March 1, 2019
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
October 1, 2017 – March 1, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 2, 2017 – March 1, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 1, 2017 – March 1, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2017 – September 30, 2017
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
September 1, 2017 – March 1, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 1, 2017 – March 1, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2017 – August 31, 2017
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
August 1, 2017 – March 1, 2019
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2017 – March 1, 2019
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2017 – March 1, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
July 1, 2017 – March 1, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2017 – July 31, 2017
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2017 – March 1, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2017 – June 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2017 – May 31, 2017
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
May 1, 2017 – March 1, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2017 – April 30, 2017
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
April 1, 2017 – March 1, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2017 – March 31, 2017
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
November 1, 2016 – March 1, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
October 1, 2016 – March 1, 2019
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
September 1, 2016 – March 1, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2016 – August 31, 2016
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
August 1, 2016 – January 3, 2017
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
July 1, 2016 – January 3, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2016 – July 31, 2016
ArchivedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2016 – January 3, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2016 – June 30, 2016
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2007 – February 20, 2018
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
May 1, 2007 – May 31, 2007
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
December 31, 2000 – November 9, 2011
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 1999 – August 31, 1999
ArchivedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 1999 – July 31, 1999
ArchivedNotification, Public
—Coliform (TCR)
September 1, 1993 – September 30, 1993
ArchivedNotification, Public
—Coliform (TCR)
April 1, 1993 – April 30, 1993
ArchivedNotification, Public
—Coliform (TCR)
August 1, 1992 – August 31, 1992
ArchivedNotification, Public
—Coliform (TCR)
July 1, 1992 – July 31, 1992
ArchivedNotification, Public
—Coliform (TCR)
February 1, 1992 – February 29, 1992
Archived
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| July 1, 2025 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| July 1, 2025 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| July 1, 2025 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2025 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2025 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| June 1, 2025 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| June 1, 2025 – June 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2025 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2025 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| May 1, 2025 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| May 1, 2025 – May 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2025 – April 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2025 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| April 1, 2025 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| April 1, 2025 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2025 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| March 1, 2025 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| March 1, 2025 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2025 – February 28, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2025 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| February 1, 2025 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2025 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| January 1, 2025 – January 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2025 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| January 1, 2025 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2025 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| December 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| December 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| December 1, 2024 – December 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| November 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| November 1, 2024 – September 4, 2025 | Lead Consumer Notice | Lead and Copper Rule | — | Archived |
| November 1, 2024 – November 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| October 1, 2024 – October 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| September 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| September 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2024 – September 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| August 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| August 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2024 – July 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| July 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| July 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| June 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| June 1, 2024 – June 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2024 – May 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| May 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| May 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 2, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| April 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| April 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| April 1, 2024 – April 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| March 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| March 1, 2024 – March 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| February 1, 2024 – February 29, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2024 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2024 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| January 1, 2024 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| January 1, 2024 – January 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2023 – December 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| December 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| November 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| November 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| November 1, 2023 – November 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| October 1, 2023 – October 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| September 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2023 – September 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| August 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| August 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2023 – August 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| July 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| June 1, 2023 – June 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| June 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| May 1, 2023 – May 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| May 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| April 1, 2023 – April 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| April 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| March 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| March 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| March 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2023 – February 28, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| February 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2023 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| January 1, 2023 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2023 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| January 1, 2023 – January 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| December 1, 2022 – December 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2022 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| November 1, 2022 – November 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| October 1, 2022 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| October 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2022 – October 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2022 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| September 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| September 1, 2022 – September 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| August 1, 2022 – August 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2022 – July 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2022 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| July 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| June 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2022 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| June 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| June 1, 2022 – June 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2022 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| May 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| May 1, 2022 – May 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| April 1, 2022 – April 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2022 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| March 1, 2022 – March 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| February 1, 2022 – February 28, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2022 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| February 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| February 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2022 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2022 – September 4, 2025 | Lead Consumer Notice | Lead and Copper Rule | — | Archived |
| January 1, 2022 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| January 1, 2022 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| January 1, 2022 – January 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2021 – September 4, 2025 | Public Notification Violation for NPDWR Violation | Public Notice | — | Archived |
| December 1, 2021 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| December 1, 2021 – December 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2021 – November 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2021 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| October 1, 2021 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| October 1, 2021 – October 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2021 – September 4, 2025 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Archived |
| July 1, 2021 – September 9, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| July 1, 2021 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2021 – July 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2021 – September 4, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Archived |
| July 1, 2021 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| June 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2021 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| June 1, 2021 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| June 1, 2021 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2021 – June 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2021 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 1, 2021 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| May 1, 2021 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2021 – May 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2021 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2021 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| April 1, 2021 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2021 – April 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2021 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 1, 2021 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2021 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| March 1, 2021 – March 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2021 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| February 1, 2021 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| February 1, 2021 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2021 – February 28, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2021 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2021 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2021 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| January 1, 2021 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2021 – January 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| December 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| December 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2020 – December 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2020 – November 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| November 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2020 – October 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| October 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2020 – September 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| September 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| August 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2020 – August 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2020 – July 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| July 1, 2020 – September 4, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Archived |
| July 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| June 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| June 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2020 – June 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| May 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| May 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| May 1, 2020 – May 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| April 1, 2020 – April 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| April 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| March 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| March 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2020 – February 29, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| February 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| February 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| February 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2020 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2020 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| January 1, 2020 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| January 1, 2020 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2019 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2019 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| December 1, 2019 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| December 1, 2019 – December 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2019 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2019 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| November 1, 2019 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2019 – November 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2019 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2019 – October 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| October 1, 2019 – September 24, 2021 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2019 – August 25, 2021 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| October 1, 2019 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2019 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2019 – September 4, 2025 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2019 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2019 – August 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2019 – September 24, 2021 | Treatment Technique, Corrective/Expedited Actions (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| July 1, 2019 – September 4, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Archived |
| July 1, 2019 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2019 – September 4, 2025 | Report Sample Result/Fail Monitor (RTCR) | Revised Total Coliform Rule | — | Archived |
| March 1, 2019 – May 8, 2019 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| February 1, 2018 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| January 1, 2018 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| December 1, 2017 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| December 1, 2017 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| December 1, 2017 – March 1, 2019 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| December 1, 2017 – December 31, 2017 | Maximum Contaminant Level Violation, E. coli (RTCR) | Revised Total Coliform Rule | Health-based | Resolved |
| November 1, 2017 – November 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2017 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2017 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| October 1, 2017 – October 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2017 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2017 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2017 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| September 2, 2017 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 1, 2017 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 1, 2017 – September 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2017 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| August 1, 2017 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2017 – August 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2017 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| July 1, 2017 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| July 1, 2017 – March 1, 2019 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2017 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| July 1, 2017 – July 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2017 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| June 1, 2017 – June 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2017 – May 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2017 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| April 1, 2017 – April 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2017 – March 1, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| January 1, 2017 – March 31, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| November 1, 2016 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| October 1, 2016 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| September 1, 2016 – March 1, 2019 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2016 – August 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| August 1, 2016 – January 3, 2017 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| July 1, 2016 – January 3, 2017 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| July 1, 2016 – July 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| June 1, 2016 – January 3, 2017 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| June 1, 2016 – June 30, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| July 1, 2007 – February 20, 2018 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| May 1, 2007 – May 31, 2007 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| December 31, 2000 – November 9, 2011 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| August 1, 1999 – August 31, 1999 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1999 – July 31, 1999 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
| September 1, 1993 – September 30, 1993 | Notification, Public | Coliform (TCR) | — | Archived |
| April 1, 1993 – April 30, 1993 | Notification, Public | Coliform (TCR) | — | Archived |
| August 1, 1992 – August 31, 1992 | Notification, Public | Coliform (TCR) | — | Archived |
| July 1, 1992 – July 31, 1992 | Notification, Public | Coliform (TCR) | — | Archived |
| February 1, 1992 – February 29, 1992 | Notification, Public | Coliform (TCR) | — | Archived |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
Enforcement actions
- September 10, 2024State Public Notification received24 linked violations
- August 13, 2024State Public Notification received24 linked violations
- July 10, 2024State Public Notification received2 linked violations
- July 1, 2024State Public Notification received34 linked violations
- December 11, 2023State Public Notification received2 linked violations
- September 24, 2021State Public Notification received12 linked violations
- September 24, 2021State Compliance achieved21 linked violations
- September 24, 2021State Public Notification received82 linked violations
- September 9, 2021State Compliance achieved1 linked violation
- August 25, 2021State Compliance achieved21 linked violations
- January 20, 2021State Show-Cause hearing76 linked violations
- March 6, 2020State Administrative Penalty assessed299 linked violations
- December 9, 2019State Administrative Penalty assessed27 linked violations
- November 4, 2019State Administrative/Compliance Order without penalty issued6 linked violations
- September 11, 2019State Formal Notice of Violation issued4 linked violations
- May 8, 2019State Compliance achieved1 linked violation
- March 1, 2019State Compliance achieved34 linked violations
- July 2, 2018State Public Notification received20 linked violations
- May 2, 2018State Compliance achieved11 linked violations
- March 29, 2018State Public Notification received3 linked violations
- February 21, 2018State Public Notification received23 linked violations
- February 21, 2018State Compliance achieved10 linked violations
- February 20, 2018State Compliance achieved2 linked violations
- January 25, 2018State Bilateral Compliance Agreement signed40 linked violations
- January 4, 2018State Public Notification requested2 linked violations
- December 15, 2017State Public Notification requested2 linked violations
- November 13, 2017State Violation/Reminder Notice1 linked violation
- November 13, 2017State Public Notification requested1 linked violation
- November 13, 2017State Violation/Reminder Notice1 linked violation
- November 13, 2017State Public Notification requested1 linked violation
- October 10, 2017State Public Notification requested2 linked violations
- October 3, 2017State Public Notification requested2 linked violations
- August 2, 2017State Public Notification requested2 linked violations
- June 29, 2017State Public Notification requested4 linked violations
- May 26, 2017State Public Notification requested2 linked violations
- March 29, 2017State Violation/Reminder Notice1 linked violation
- March 29, 2017State Public Notification requested1 linked violation
- January 3, 2017State Compliance achieved3 linked violations
- October 11, 2016State Administrative Penalty assessed36 linked violations
- October 4, 2016State Public Notification requested2 linked violations
- September 16, 2016State Compliance achieved1 linked violation
- September 6, 2016State Administrative/Compliance Order without penalty issued5 linked violations
- August 25, 2016State Public Notification requested2 linked violations
- August 11, 2016State Formal Notice of Violation issued2 linked violations
- August 1, 2016State Violation/Reminder Notice1 linked violation
- August 1, 2016State Public Notification requested1 linked violation
- August 1, 2016State Violation/Reminder Notice1 linked violation
- August 1, 2016State Public Notification requested1 linked violation
- November 9, 2011State Compliance achieved1 linked violation
- January 6, 1999State Public Notification requested3 linked violations
- December 15, 1998State Formal Notice of Violation issued5 linked violations
- October 5, 1998State Formal Notice of Violation issued2 linked violations
- January 16, 1998State Other11 linked violations
- January 5, 1998State Public Notification requested1 linked violation
- December 13, 1997State Formal Notice of Violation issued12 linked violations
- November 3, 1997State Formal Notice of Violation issued2 linked violations
- November 7, 1996State Formal Notice of Violation issued4 linked violations
- September 9, 1996State Formal Notice of Violation issued3 linked violations
- July 29, 1993State Formal Notice of Violation issued4 linked violations
Last known contact on file (system is inactive)
COUCH, LILLY
870-397-1852
HOPE, AR 71801