CHIGNIK LAKE, AK · Lake and Peninsula Borough County
CHIGNIK LAKE WATER SYSTEM Water System
Current status
7 items on record are open and awaiting resolution as of July 4, 2026. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings. Full details are in the violation history below.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Alaska’s official records. Always confirm current status with Alaska before making decisions based on this information.
System facts
- System ID (PWSID)
- AK2261096
- System type
- Community Water System
- Population served
- 200
- Service connections
- 31
- Ownership
- Native American tribal
- Water source
- groundwater (wells)
Violation history
Monitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2025 – December 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2025 – November 30, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2025 – September 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2025 – August 31, 2025
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2025
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2025 – June 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2025 – May 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2025 – March 31, 2025
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2025
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2024 – December 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2024 – November 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2024 – September 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2024 – August 31, 2024
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2024
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2024 – July 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2024 – May 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2024 – April 30, 2024
ResolvedFailure to Consult with State
—Groundwater Rule
March 22, 2024 – September 16, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2024 – March 31, 2024
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2024
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2024 – January 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2023 – December 31, 2023
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
November 9, 2023 – November 13, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2023 – November 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2023 – August 31, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2023
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2023 – July 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2023 – May 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – April 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Nitrate
January 1, 2023 – December 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2023 – January 31, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2023
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – November 30, 2022
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2022
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2022 – July 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – June 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2022 – May 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2022 – March 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2022 – February 28, 2022
ResolvedMonitoring, Regular
—Nitrate
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2022 – January 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2021 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2021 – May 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – February 28, 2021
ResolvedMonitoring, Regular
—Nitrate
January 1, 2021 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2020 – December 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2020 – October 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2020 – September 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2020 – August 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2020 – June 30, 2020
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
May 2, 2020 – February 21, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2020 – May 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – March 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2019 – December 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – October 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2019 – June 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2019 – March 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2019 – January 31, 2019
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2018 – June 26, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2018 – July 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2017 – November 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2017 – September 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2017 – August 31, 2017
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
May 14, 2017 – November 6, 2019
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 13, 2017 – November 6, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2017 – February 28, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2017 – January 31, 2017
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2017 – December 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2016 – July 31, 2016
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
July 1, 2016 – September 13, 2016
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
April 1, 2016 – April 17, 2018
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2016 – January 31, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2015 – January 31, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2014 – November 30, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2014 – August 31, 2014
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
July 2, 2014 – September 18, 2014
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2014 – September 4, 2014
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 6, 2014 – January 29, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 6, 2014 – January 29, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 6, 2014 – April 19, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2014 – February 28, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2013 – November 30, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2013 – August 31, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2013 – June 30, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2013 – April 30, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2013 – January 16, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2012 – December 31, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2012 – August 31, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2012 – January 31, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2011 – August 31, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2011 – March 31, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2010 – December 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2010 – November 30, 2010
ResolvedMonitoring, Regular
—OXAMYL
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Chlordane
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Pentachlorophenol
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Benzo(a)pyrene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—2,4,5-TP
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—2,4-D
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Heptachlor epoxide
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Heptachlor
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—2,3,7,8-TCDD
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—LASSO
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Atrazine
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Carbofuran
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Dinoseb
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Picloram
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Simazine
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Glyphosate
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Endothall
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Diquat
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Dalapon
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Toxaphene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Methoxychlor
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—BHC-GAMMA
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Endrin
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Chlordane
July 1, 2010 – September 30, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2010 – December 9, 2010
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Pentachlorophenol
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Benzo(a)pyrene
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—2,4,5-TP
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—2,4-D
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Heptachlor epoxide
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Heptachlor
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—2,3,7,8-TCDD
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—LASSO
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Atrazine
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Carbofuran
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Dinoseb
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Picloram
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Simazine
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—OXAMYL
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Glyphosate
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Endothall
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Diquat
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Dalapon
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Toxaphene
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Methoxychlor
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—BHC-GAMMA
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Endrin
July 1, 2010 – September 30, 2010
ResolvedMonitoring, Regular
—Methoxychlor
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Endrin
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—BHC-GAMMA
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Toxaphene
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Dalapon
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Diquat
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Endothall
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Glyphosate
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—OXAMYL
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Simazine
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Picloram
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Dinoseb
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Carbofuran
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Atrazine
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—2,3,7,8-TCDD
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Heptachlor
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Heptachlor epoxide
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—2,4-D
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—2,4,5-TP
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Benzo(a)pyrene
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Pentachlorophenol
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—Chlordane
April 1, 2010 – June 30, 2010
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Picloram
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Atrazine
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—LASSO
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—2,3,7,8-TCDD
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—2,4-D
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Endothall
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Chlordane
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Diquat
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Dalapon
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2010 – January 31, 2010
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Endrin
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Simazine
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2010 – March 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2009 – December 31, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2009 – November 30, 2009
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2009 – December 9, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2009 – July 31, 2009
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2009 – December 9, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2008 – December 9, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2008 – June 30, 2008
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2008 – May 31, 2008
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2008 – December 9, 2010
ResolvedMonitoring, Regular
—Nitrate
January 1, 2008 – December 31, 2008
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2008 – December 9, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2007 – December 31, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2007 – September 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2007 – August 31, 2007
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2007 – December 9, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2007 – December 9, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2007 – April 30, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2007 – February 28, 2007
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2007 – December 9, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2007 – December 9, 2010
ResolvedMonitoring, Regular
—Nitrate
January 1, 2007 – December 31, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2006 – December 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2006 – November 30, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2006 – August 31, 2006
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2006 – December 9, 2010
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2006 – August 17, 2006
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
July 1, 2006 – December 9, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2006 – June 30, 2006
ArchivedMonitoring, Regular
—Nitrate
January 1, 2006 – December 31, 2006
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2006 – December 16, 2009
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2005 – December 16, 2009
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2005 – March 31, 2005
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2005 – December 16, 2009
ResolvedMonitoring, Regular
—Arsenic
January 1, 2005 – December 31, 2007
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
October 1, 2004 – October 31, 2004
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2004 – December 16, 2009
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2004 – December 29, 2004
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2004 – December 31, 2004
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2004 – July 27, 2004
ResolvedMonitoring, Regular
—Benzene
January 1, 2004 – December 31, 2004
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2004 – December 26, 2009
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Styrene
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2004 – December 31, 2004
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2003 – March 25, 2004
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2003 – December 26, 2009
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2003 – December 31, 2003
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2003 – December 26, 2009
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 2003 – July 27, 2004
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Styrene
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Benzene
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2003 – December 31, 2003
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2002 – December 26, 2009
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2002 – December 31, 2004
ResolvedMonitoring, Regular
—CYANIDE
January 1, 2002 – December 31, 2004
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2001 – November 30, 2001
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2001 – April 30, 2001
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2000 – March 31, 2000
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2000 – January 31, 2000
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1999 – December 31, 1999
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1999 – September 30, 1999
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1999 – July 31, 1999
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1999 – March 31, 1999
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1999 – February 28, 1999
ArchivedMonitoring, Regular
—Nitrate
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1999 – January 31, 1999
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1998 – May 31, 1998
ArchivedSanitary Survey (TCR)
—No contaminant on record
January 1, 1998 – December 31, 2002
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 1997 – November 30, 1997
ArchivedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 1997 – October 31, 1997
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1997 – March 31, 1997
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1997 – January 31, 1997
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1996 – June 30, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1996 – March 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1996 – January 31, 1996
ArchivedMonitoring, Regular
—Styrene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Benzene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Nitrate
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Heptachlor epoxide
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—BHC-GAMMA
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Toxaphene
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—2,4-D
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—2,4,5-TP
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Endrin
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Aldicarb
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfone
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Atrazine
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1995 – October 31, 1995
ArchivedMonitoring, Regular
—Pentachlorophenol
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Chlordane
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Heptachlor
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1995 – September 30, 1995
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1995 – August 30, 1995
ArchivedMonitoring, Regular
—Picloram
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Methoxychlor
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Toxaphene
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—2,4-D
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—2,4,5-TP
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfone
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Atrazine
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Chlordane
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Heptachlor
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Heptachlor epoxide
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Endrin
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Simazine
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Dinoseb
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Heptachlor
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Heptachlor epoxide
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Pentachlorophenol
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Chlordane
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Atrazine
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Endrin
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Diquat
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Picloram
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Simazine
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfone
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Aldicarb
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—2,4,5-TP
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—2,4-D
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Toxaphene
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—BHC-GAMMA
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Methoxychlor
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Picloram
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Endrin
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Dinoseb
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Diquat
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Simazine
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Chlordane
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Atrazine
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Aldicarb
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—2,4-D
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Toxaphene
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 1994 – October 31, 1994
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1994 – August 31, 1994
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1994 – July 31, 1994
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1994 – June 30, 1994
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1994 – March 31, 1994
ArchivedMonitoring, Regular
—Carbon tetrachloride
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Toluene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Styrene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Benzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1994 – January 31, 1994
ArchivedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 1993 – October 31, 1993
ArchivedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
September 1, 1993 – September 30, 1993
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1993 – August 31, 1993
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 1993 – December 14, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1993 – June 30, 1993
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1993 – May 31, 1993
ArchivedMonitoring, Regular
—Nitrate
January 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 1992 – March 31, 1992
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1992 – March 31, 1992
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1992 – March 31, 1992
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1992 – March 31, 1992
ResolvedMonitoring, Regular
—Benzene
January 1, 1992 – March 31, 1992
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1992 – March 31, 1992
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1992 – March 31, 1992
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 1992 – March 31, 1992
ResolvedMonitoring, Regular
—Nitrate
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Cadmium
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Selenium
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Mercury
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Chromium
June 30, 1986 – June 30, 1989
Archived
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| December 1, 2025 – December 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2025 – November 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| September 1, 2025 – September 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2025 – August 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2025 – June 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2025 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| December 1, 2024 – December 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2024 – September 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2024 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2024 – July 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2024 – May 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2024 – April 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 22, 2024 – September 16, 2024 | Failure to Consult with State | Groundwater Rule | — | Resolved |
| March 1, 2024 – March 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| January 1, 2024 – January 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2023 – December 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 9, 2023 – November 13, 2023 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2023 – November 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2023 – September 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2023 – August 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2023 – July 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2023 – June 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2023 – May 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2023 – April 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – December 31, 2023 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2023 – January 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| November 1, 2022 – November 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2022 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| July 1, 2022 – July 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2022 – June 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2022 – May 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2022 – March 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2022 – February 28, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2022 – January 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2021 – December 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2021 – May 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2021 – February 28, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2021 – December 31, 2021 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 2020 – December 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2020 – October 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2020 – September 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2020 – August 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2020 – June 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 2, 2020 – February 21, 2024 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| May 1, 2020 – May 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2019 – December 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2019 – October 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2019 – June 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2019 – March 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2019 – January 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2018 – June 26, 2019 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2018 – July 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2017 – November 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2017 – September 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2017 – August 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 14, 2017 – November 6, 2019 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 13, 2017 – November 6, 2019 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 1, 2017 – February 28, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2017 – January 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2017 – December 31, 2025 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| July 1, 2016 – July 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2016 – September 13, 2016 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| April 1, 2016 – April 17, 2018 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2016 – January 31, 2016 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2015 – January 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2014 – November 30, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2014 – August 31, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 2, 2014 – September 18, 2014 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2014 – September 4, 2014 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| February 6, 2014 – January 29, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 6, 2014 – January 29, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 6, 2014 – April 19, 2016 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 1, 2014 – February 28, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2013 – November 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2013 – August 31, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2013 – June 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2013 – April 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2013 – January 16, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2012 – December 31, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2012 – August 31, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2012 – January 31, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2011 – August 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 2011 – March 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2010 – December 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2010 – November 30, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | OXAMYL | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Chlordane | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 2,4-D | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Heptachlor | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 2,3,7,8-TCDD | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | LASSO | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Atrazine | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Carbofuran | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Dinoseb | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Picloram | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Simazine | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Glyphosate | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Endothall | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Diquat | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Dalapon | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Toxaphene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Methoxychlor | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Endrin | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Chlordane | — | Resolved |
| July 1, 2010 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | 2,4-D | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Heptachlor | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | 2,3,7,8-TCDD | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | LASSO | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Atrazine | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Carbofuran | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Dinoseb | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Picloram | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Simazine | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | OXAMYL | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Glyphosate | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Endothall | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Diquat | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Dalapon | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Toxaphene | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Methoxychlor | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| July 1, 2010 – September 30, 2010 | Monitoring, Regular | Endrin | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Methoxychlor | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Endrin | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Toxaphene | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Dalapon | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Diquat | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Endothall | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Glyphosate | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | OXAMYL | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Simazine | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Picloram | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Dinoseb | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Carbofuran | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Atrazine | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | 2,3,7,8-TCDD | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Heptachlor | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | 2,4-D | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| April 1, 2010 – June 30, 2010 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | 2,3,7,8-TCDD | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2010 – January 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| December 1, 2009 – December 31, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2009 – November 30, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2009 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2009 – July 31, 2009 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2009 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2008 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| June 1, 2008 – June 30, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 2008 – May 31, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2008 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2008 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| December 1, 2007 – December 31, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2007 – September 30, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2007 – August 31, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2007 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2007 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| April 1, 2007 – April 30, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2007 – February 28, 2007 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2007 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2007 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 2006 – December 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2006 – November 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2006 – August 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2006 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| July 1, 2006 – August 17, 2006 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2006 – December 9, 2010 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| June 1, 2006 – June 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2006 – December 16, 2009 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2005 – December 16, 2009 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| March 1, 2005 – March 31, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 2005 – December 16, 2009 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Arsenic | — | Resolved |
| October 1, 2004 – October 31, 2004 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
| July 1, 2004 – December 16, 2009 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2004 – December 29, 2004 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2004 – July 27, 2004 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2004 – December 26, 2009 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| July 1, 2003 – March 25, 2004 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2003 – December 26, 2009 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2003 – December 26, 2009 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2003 – July 27, 2004 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| July 1, 2002 – December 26, 2009 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2002 – December 31, 2004 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 2002 – December 31, 2004 | Monitoring, Regular | CYANIDE | — | Resolved |
| November 1, 2001 – November 30, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 2001 – April 30, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 2000 – March 31, 2000 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 2000 – January 31, 2000 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| December 1, 1999 – December 31, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| September 1, 1999 – September 30, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1999 – July 31, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 1999 – March 31, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 1999 – February 28, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1999 – January 31, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 1998 – May 31, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1998 – December 31, 2002 | Sanitary Survey (TCR) | — | — | Resolved |
| November 1, 1997 – November 30, 1997 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1997 – October 31, 1997 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 1997 – March 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1997 – January 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| June 1, 1996 – June 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 1996 – March 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1996 – January 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Toxaphene | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | 2,4-D | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Endrin | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Aldicarb | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Atrazine | — | Resolved |
| October 1, 1995 – October 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Chlordane | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Heptachlor | — | Resolved |
| September 1, 1995 – September 30, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| August 1, 1995 – August 30, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Picloram | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Methoxychlor | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Toxaphene | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | 2,4-D | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Atrazine | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Chlordane | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Heptachlor | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Endrin | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Simazine | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Dinoseb | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Heptachlor | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Chlordane | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Atrazine | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Endrin | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Diquat | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Picloram | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Simazine | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Aldicarb | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | 2,4-D | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Toxaphene | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Aldicarb | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Toxaphene | — | Resolved |
| October 1, 1994 – October 31, 1994 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| August 1, 1994 – August 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1994 – July 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| June 1, 1994 – June 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 1994 – March 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1994 – January 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1993 – October 31, 1993 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| September 1, 1993 – September 30, 1993 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Archived |
| August 1, 1993 – August 31, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1993 – December 14, 1998 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| June 1, 1993 – June 30, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 1993 – May 31, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1993 – December 31, 1993 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1992 – March 31, 1992 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 1992 – March 31, 1992 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1992 – March 31, 1992 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1992 – March 31, 1992 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1992 – March 31, 1992 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1992 – March 31, 1992 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1992 – March 31, 1992 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1992 – March 31, 1992 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Nitrate | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Cadmium | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Selenium | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Mercury | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Chromium | — | Archived |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
Enforcement actions
- November 6, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 6, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 5, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 1, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 1, 2025State Compliance achieved1 linked violation
- October 1, 2025State Compliance achieved6 linked violations
- September 16, 2025State Compliance Meeting conducted3 linked violations
- August 22, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 20, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 7, 2025State Compliance Meeting conducted3 linked violations
- July 28, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 9, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 16, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 16, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 12, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 14, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 8, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 8, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 2, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 29, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 28, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 17, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 10, 2025State Compliance Meeting conducted1 linked violation
- April 7, 2025State Compliance Meeting conducted1 linked violation
- April 3, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 26, 2025State Compliance Meeting conducted126 linked violations
- March 26, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 26, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 26, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- January 29, 2025State Compliance achieved5 linked violations
- January 21, 2025State Compliance Meeting conducted1 linked violation
- January 7, 2025State Compliance achieved2 linked violations
- October 10, 2024State Compliance Meeting conducted3 linked violations
- October 10, 2024State Compliance achieved65 linked violations
- October 10, 2024State Compliance achieved2 linked violations
- October 10, 2024State Compliance achieved3 linked violations
- October 3, 2024State Compliance Meeting conducted3 linked violations
- September 16, 2024State Compliance achieved1 linked violation
- July 24, 2024State Compliance Meeting conducted4 linked violations
- July 12, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 5, 2024State Compliance achieved6 linked violations
- April 19, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 4, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 3, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 18, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 18, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 21, 2024State Compliance achieved1 linked violation
- January 17, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- January 5, 2024State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- January 4, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 20, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 13, 2023State Compliance achieved1 linked violation
- November 13, 2023State Compliance achieved1 linked violation
- November 7, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 7, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 7, 2023State Boil Water Order3 linked violations
- November 3, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 10, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 10, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 27, 2022State Compliance achieved1 linked violation
- December 2, 2022State Compliance Meeting conducted1 linked violation
- October 24, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 3, 2022State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- October 3, 2022State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 26, 2022State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- August 26, 2022State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- August 26, 2022State Compliance Meeting conducted5 linked violations
- August 11, 2022State Compliance Meeting conducted1 linked violation
- August 8, 2022State Compliance Meeting conducted3 linked violations
- July 19, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 11, 2022State Compliance achieved3 linked violations
- April 4, 2022State Compliance achieved1 linked violation
- September 21, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 29, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 28, 2021State Compliance achieved2 linked violations
- May 17, 2021State Compliance achieved9 linked violations
- February 28, 2020State Compliance Meeting conducted1 linked violation
- February 7, 2020State Boil Water Order1 linked violation
- November 6, 2019State Compliance achieved2 linked violations
- August 28, 2019State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 19, 2019State Compliance Meeting conducted2 linked violations
- July 31, 2019State Compliance achieved3 linked violations
- June 26, 2019State Compliance achieved2 linked violations
- December 5, 2018State Compliance achieved2 linked violations
- January 31, 2018State Compliance achieved11 linked violations
- March 14, 2017State Compliance achieved2 linked violations
- September 13, 2016State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 13, 2016State Compliance achieved1 linked violation
- April 19, 2016State Compliance achieved1 linked violation
- October 26, 2015State Compliance Meeting conducted4 linked violations
- September 23, 2015State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 23, 2015State Compliance achieved1 linked violation
- December 17, 2014State Compliance achieved3 linked violations
- September 4, 2014State Compliance achieved19 linked violations
- November 5, 2013State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 21, 2013State Compliance achieved1 linked violation
- September 30, 2013State Compliance achieved1 linked violation
- July 30, 2013State Compliance achieved1 linked violation
- May 15, 2013State Compliance achieved1 linked violation
- January 16, 2013State Compliance achieved6 linked violations
- September 20, 2012State Compliance achieved17 linked violations
- July 19, 2012State Compliance achieved16 linked violations
- July 18, 2012State Compliance achieved120 linked violations
- July 2, 2012State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 2, 2012State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 19, 2011State Compliance achieved10 linked violations
- December 9, 2010State Compliance achieved12 linked violations
- August 2, 2010State Compliance achieved2 linked violations
- December 26, 2009State Compliance achieved4 linked violations
- December 16, 2009State Compliance achieved11 linked violations
- June 19, 2009State Administrative/Compliance Order without penalty issued5 linked violations
- January 23, 2007State Compliance achieved5 linked violations
- April 15, 2005State Compliance achieved44 linked violations
- November 18, 2004State Other22 linked violations
- July 27, 2004State Compliance achieved4 linked violations
- July 23, 2004State Compliance achieved8 linked violations
- April 9, 2002State Othergeneral compliance action — not tied to a specific violation on record
- January 15, 2002State Compliance Meeting conducted1 linked violation
- August 8, 2001State Othergeneral compliance action — not tied to a specific violation on record
- May 30, 2001State Othergeneral compliance action — not tied to a specific violation on record
- April 9, 2001State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- April 4, 2001State Othergeneral compliance action — not tied to a specific violation on record
- March 30, 2001State Other1 linked violation
- March 21, 2001State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 21, 2001State Othergeneral compliance action — not tied to a specific violation on record
- January 31, 2001State Othergeneral compliance action — not tied to a specific violation on record
- January 9, 2001State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 11, 2000State Othergeneral compliance action — not tied to a specific violation on record
- September 28, 2000State Compliance achieved2 linked violations
- June 15, 2000State Other1 linked violation
- January 5, 2000State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 17, 1999State Compliance achieved80 linked violations
- April 14, 1999State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 24, 1999State Othergeneral compliance action — not tied to a specific violation on record
- March 16, 1999State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 22, 1999State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- December 31, 1998State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 14, 1998State Compliance achieved48 linked violations
- December 9, 1998State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 20, 1998State Othergeneral compliance action — not tied to a specific violation on record
- March 3, 1997State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 27, 1997State Othergeneral compliance action — not tied to a specific violation on record
- February 6, 1997State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 6, 1997State Othergeneral compliance action — not tied to a specific violation on record
- September 25, 1996State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 20, 1996State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 1, 1996State Violation/Reminder Notice1 linked violation
- February 28, 1996State Othergeneral compliance action — not tied to a specific violation on record
- July 28, 1995State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 15, 1994State Formal Notice of Violation issued3 linked violations
- June 15, 1994State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 11, 1994State Violation/Reminder Notice1 linked violation
- November 22, 1993State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 9, 1993State Violation/Reminder Notice1 linked violation
- January 15, 1993State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- November 30, 1992State Violation/Reminder Notice1 linked violation
- July 17, 1992State Othergeneral compliance action — not tied to a specific violation on record
- March 3, 1992State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 8, 1991State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- June 5, 1989State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
Contact
LIND, MIRANDA
907-845-4041
CHIGNIK LAKE, AK 99548-0033