NEW STUYAHOK, AK · Dillingham Census Area County
NEW STUYAHOK WATER SYSTEM Water System
Consumer Confidence Report status
NEW STUYAHOK WATER SYSTEM must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.
As of August 1, 2026, EPA's federal records show 4 items for NEW STUYAHOK WATER SYSTEM that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Alaska’s official records. Always confirm current status with Alaska before making decisions based on this information.
System facts
- System ID (PWSID)
- AK2260367
- System type
- Community Water System
- Population served
- 566
- Service connections
- 121
- Ownership
- Native American tribal
- Water source
- groundwater (wells)
NEW STUYAHOK WATER SYSTEM is one of 109 community water systems in Alaska in the 501 to 3,300 people size category, serving 566 people from groundwater.
As of August 1, 2026, its federal record holds 321 entries between 1979 and 2026, of which 4 remain open; none are health-based.
Of the 321, 296 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves volatile organic chemicals, synthetic organic chemicals, and the Total Coliform Rules.
Violation history
Monitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2026 – March 31, 2026
ArchivedPublic Notification Violation without NPDWR Violation
—Public Notice
January 22, 2026
UnaddressedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Carbon tetrachloride
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Trichloroethylene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Tetrachloroethylene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—CHLOROBENZENE
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Benzene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Toluene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Ethylbenzene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Styrene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Vinyl chloride
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2026 – January 31, 2026
ArchivedMonitoring, Regular
—Xylenes, Total
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2026 – March 31, 2026
ArchivedMonitoring, Regular
—Combined Uranium
January 1, 2026 – March 31, 2026
ArchivedPublic Notification Violation without NPDWR Violation
—Public Notice
November 12, 2025
UnaddressedPublic Notification Violation without NPDWR Violation
—Public Notice
November 8, 2025
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2025 – November 30, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
November 1, 2025 – November 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2025 – July 31, 2025
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
July 1, 2025 – August 5, 2025
ResolvedLead Consumer Notice
—Lead and Copper Rule
April 1, 2025
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2024 – November 30, 2024
ResolvedMonitoring, Source Water (GWR)
—E. COLI
July 25, 2024 – June 11, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2024 – May 31, 2024
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 24, 2024 – April 25, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 24, 2024 – October 24, 2024
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 24, 2024 – April 15, 2024
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 24, 2024 – June 11, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 24, 2024 – October 24, 2024
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
February 24, 2024 – October 24, 2024
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2024 – March 19, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2023 – December 31, 2023
ResolvedFailure to Consult with State
—Groundwater Rule
November 28, 2023 – October 24, 2024
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2023 – September 11, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – March 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – November 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2022 – July 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – June 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2022 – March 31, 2022
ResolvedMonitoring, Regular
—Nitrate
January 1, 2022 – December 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2021 – October 31, 2021
ResolvedFailure to Consult with State
—Groundwater Rule
September 28, 2021 – June 17, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2021 – August 31, 2021
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2021 – March 19, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2020 – February 29, 2020
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Styrene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Toluene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Benzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Nitrate
January 1, 2020 – December 31, 2020
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2019 – July 29, 2020
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
August 25, 2018 – June 25, 2019
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
August 25, 2018 – June 25, 2019
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
August 25, 2018 – June 25, 2019
ResolvedMonitoring, Regular
—Nitrate
January 1, 2018 – December 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2017 – December 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2017 – November 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2017 – October 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2017 – July 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2017 – June 30, 2017
ResolvedMonitoring, Regular
—Nitrate
January 1, 2017 – December 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2016 – December 31, 2016
ResolvedMonitoring, Regular
—Nitrate
January 1, 2016 – December 31, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2014 – September 30, 2014
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Toluene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Selenium
January 1, 2014 – December 31, 2022
ArchivedMonitoring, Regular
—Thallium, Total
January 1, 2014 – December 31, 2022
ArchivedMonitoring, Regular
—Xylenes, Total
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 2014 – December 31, 2022
ArchivedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Nickel
January 1, 2014 – December 31, 2022
ArchivedMonitoring, Regular
—CYANIDE
January 1, 2014 – December 31, 2022
ArchivedMonitoring, Regular
—Chromium
January 1, 2014 – December 31, 2022
ArchivedMonitoring, Regular
—Barium
January 1, 2014 – December 31, 2022
ArchivedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Benzene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Styrene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2014 – December 31, 2016
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
July 8, 2013 – May 18, 2018
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2012 – March 31, 2012
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2011 – July 31, 2011
ResolvedMonitoring, Regular
—Nitrate
January 1, 2009 – December 31, 2009
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2008 – November 30, 2008
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—Benzene
January 1, 2008 – December 31, 2010
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2008 – December 31, 2010
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2008 – December 31, 2010
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2008 – December 31, 2010
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2008 – December 31, 2010
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2008 – December 31, 2010
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2008 – December 31, 2010
ResolvedMonitoring, Regular
—Styrene
January 1, 2008 – December 31, 2010
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2008 – December 31, 2010
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
November 1, 2006 – November 30, 2006
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2006 – July 14, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2006 – July 31, 2006
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
February 1, 2006 – February 28, 2006
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2006 – August 5, 2011
ResolvedMonitoring, Regular
—Nitrate
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2005 – December 31, 2007
ArchivedMonitoring, Regular
—Beryllium, Total
January 1, 2005 – December 31, 2007
ArchivedMonitoring, Regular
—CYANIDE
January 1, 2005 – December 31, 2007
ArchivedMonitoring, Regular
—Arsenic
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Nickel
January 1, 2005 – December 31, 2007
ArchivedMonitoring, Regular
—Thallium, Total
January 1, 2005 – December 31, 2007
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2004 – August 5, 2011
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
September 1, 2002 – September 30, 2002
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2001 – December 31, 2001
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2001 – November 30, 2001
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2001 – October 31, 2001
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2001 – March 31, 2001
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2000 – March 31, 2000
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2000 – February 29, 2000
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1999 – August 31, 1999
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1999 – July 31, 1999
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1999 – February 28, 1999
ArchivedMonitoring, Regular
—DICHLOROMETHANE
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Styrene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Toluene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Benzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1998 – December 31, 1998
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1998 – September 30, 1998
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1998 – August 31, 1998
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1998 – May 31, 1998
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1998 – April 30, 1998
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1997 – November 30, 1997
ArchivedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
August 1, 1997 – August 31, 1997
ArchivedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
July 1, 1997 – July 31, 1997
ArchivedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 1997 – July 31, 1997
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1997 – June 30, 1997
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1997 – March 31, 1997
ArchivedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
February 1, 1997 – February 28, 1997
ArchivedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 1997 – February 22, 1999
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1996 – November 30, 1996
ArchivedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 1996 – October 31, 1996
ArchivedMonitoring, Repeat Minor (TCR)
—Coliform (TCR)
September 1, 1996 – September 30, 1996
ArchivedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 1996 – August 31, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1996 – June 30, 1996
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1996 – February 29, 1996
ArchivedMonitoring, Regular
—Dinoseb
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Repeat Minor (TCR)
—Coliform (TCR)
October 1, 1995 – October 31, 1995
ArchivedMonitoring, Regular
—Simazine
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Picloram
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Diquat
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Endrin
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Pentachlorophenol
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Heptachlor epoxide
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Heptachlor
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Chlordane
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Atrazine
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfone
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Aldicarb
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—2,4,5-TP
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—2,4-D
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Toxaphene
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—BHC-GAMMA
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Methoxychlor
October 1, 1995 – December 31, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1995 – August 30, 1995
ArchivedMonitoring, Regular
—Methoxychlor
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—BHC-GAMMA
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Toxaphene
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—2,4-D
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—2,4,5-TP
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Aldicarb
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfone
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Atrazine
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Chlordane
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Heptachlor
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Heptachlor epoxide
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Pentachlorophenol
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Endrin
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Dinoseb
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Diquat
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Picloram
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Regular
—Simazine
July 1, 1995 – September 30, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1995 – June 30, 1995
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1995 – May 31, 1995
ArchivedMonitoring, Regular
—BHC-GAMMA
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Toxaphene
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—2,4-D
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—2,4,5-TP
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Aldicarb
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfone
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Atrazine
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Chlordane
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Heptachlor
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Heptachlor epoxide
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Pentachlorophenol
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Endrin
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Dinoseb
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Diquat
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Simazine
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Picloram
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Methoxychlor
April 1, 1995 – June 30, 1995
ResolvedMonitoring, Regular
—Simazine
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Nitrate
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Benzene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Picloram
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 1995 – December 31, 1995
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 1995 – June 22, 1999
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Toxaphene
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—2,4-D
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Aldicarb
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfoxide
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Aldicarb sulfone
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Atrazine
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Chlordane
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Heptachlor
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Endrin
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Dinoseb
January 1, 1995 – March 31, 1995
ResolvedMonitoring, Regular
—Diquat
January 1, 1995 – March 31, 1995
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 1994 – July 31, 1994
ArchivedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
July 1, 1994 – July 31, 1994
ArchivedMonitoring, Regular
—Xylenes, Total
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Benzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Styrene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Toluene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 1993 – November 30, 1993
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 1993 – December 15, 1998
ResolvedMonitoring, Regular
—Mercury
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Chromium
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Cadmium
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Barium
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Arsenic
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Nitrite
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Nitrate
January 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Fluoride
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Nitrate
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Fluoride
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Selenium
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Mercury
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Chromium
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Barium
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Arsenic
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Cadmium
June 30, 1986 – June 30, 1989
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
June 30, 1985 – June 30, 1989
ArchivedMonitoring, Regular
—Fluoride
October 1, 1979 – October 31, 1979
ArchivedMonitoring, Regular
—Barium
October 1, 1979 – October 31, 1979
ArchivedMonitoring, Regular
—Mercury
October 1, 1979 – October 31, 1979
Archived
Archived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yetResolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| March 1, 2026 – March 31, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 22, 2026 | Public Notification Violation without NPDWR Violation | Public Notice | — | Unaddressed |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | DICHLOROMETHANE | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Carbon tetrachloride | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | 1,2-Dichloropropane | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Trichloroethylene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Tetrachloroethylene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | CHLOROBENZENE | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Benzene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Toluene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Ethylbenzene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Styrene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | 1,2-Dichloroethane | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | 1,1-Dichloroethylene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Vinyl chloride | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | p-Dichlorobenzene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | o-Dichlorobenzene | — | Archived |
| January 1, 2026 – January 31, 2026 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Xylenes, Total | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| January 1, 2026 – March 31, 2026 | Monitoring, Regular | Combined Uranium | — | Archived |
| November 12, 2025 | Public Notification Violation without NPDWR Violation | Public Notice | — | Unaddressed |
| November 8, 2025 | Public Notification Violation without NPDWR Violation | Public Notice | — | Unaddressed |
| November 1, 2025 – November 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2025 – November 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2025 – August 5, 2025 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| April 1, 2025 | Lead Consumer Notice | Lead and Copper Rule | — | Unaddressed |
| November 1, 2024 – November 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 25, 2024 – June 11, 2025 | Monitoring, Source Water (GWR) | E. COLI | — | Resolved |
| May 1, 2024 – May 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 24, 2024 – April 25, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 24, 2024 – October 24, 2024 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 24, 2024 – April 15, 2024 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 24, 2024 – June 11, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 24, 2024 – October 24, 2024 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| February 24, 2024 – October 24, 2024 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 1, 2024 – March 19, 2024 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| December 1, 2023 – December 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 28, 2023 – October 24, 2024 | Failure to Consult with State | Groundwater Rule | — | Resolved |
| October 1, 2023 – September 11, 2024 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| June 1, 2023 – June 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2022 – November 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2022 – July 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2022 – June 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2022 – March 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2022 – December 31, 2022 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 2021 – October 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 28, 2021 – June 17, 2022 | Failure to Consult with State | Groundwater Rule | — | Resolved |
| August 1, 2021 – August 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2021 – March 19, 2024 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| February 1, 2020 – February 29, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2020 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 2019 – July 29, 2020 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| August 25, 2018 – June 25, 2019 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| August 25, 2018 – June 25, 2019 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| August 25, 2018 – June 25, 2019 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 2017 – December 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2017 – November 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2017 – October 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2017 – July 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2017 – June 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2017 – December 31, 2017 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 2016 – December 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Nitrate | — | Resolved |
| September 1, 2014 – September 30, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2022 | Monitoring, Regular | Selenium | — | Archived |
| January 1, 2014 – December 31, 2022 | Monitoring, Regular | Thallium, Total | — | Archived |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2014 – December 31, 2022 | Monitoring, Regular | Antimony, Total | — | Archived |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2014 – December 31, 2022 | Monitoring, Regular | Nickel | — | Archived |
| January 1, 2014 – December 31, 2022 | Monitoring, Regular | CYANIDE | — | Archived |
| January 1, 2014 – December 31, 2022 | Monitoring, Regular | Chromium | — | Archived |
| January 1, 2014 – December 31, 2022 | Monitoring, Regular | Barium | — | Archived |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| July 8, 2013 – May 18, 2018 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| March 1, 2012 – March 31, 2012 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2011 – July 31, 2011 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring, Regular | Nitrate | — | Archived |
| November 1, 2008 – November 30, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 2008 – March 31, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2008 – December 31, 2010 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2008 – December 31, 2010 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2008 – December 31, 2010 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2008 – December 31, 2010 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2008 – December 31, 2010 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2008 – December 31, 2010 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2008 – December 31, 2010 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2008 – December 31, 2010 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2008 – December 31, 2010 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| November 1, 2006 – November 30, 2006 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2006 – July 14, 2006 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2006 – July 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2006 – February 28, 2006 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 2006 – August 5, 2011 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Thallium, Total | — | Archived |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Beryllium, Total | — | Archived |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | CYANIDE | — | Archived |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Nickel | — | Archived |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Thallium, Total | — | Archived |
| January 1, 2004 – August 5, 2011 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2002 – September 30, 2002 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| December 1, 2001 – December 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| November 1, 2001 – November 30, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 2001 – October 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 2001 – March 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 2000 – March 31, 2000 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 2000 – February 29, 2000 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| August 1, 1999 – August 31, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1999 – July 31, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 1999 – February 28, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| December 1, 1998 – December 31, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| September 1, 1998 – September 30, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| August 1, 1998 – August 31, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 1998 – May 31, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 1998 – April 30, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| November 1, 1997 – November 30, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| August 1, 1997 – August 31, 1997 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
| July 1, 1997 – July 31, 1997 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Archived |
| July 1, 1997 – July 31, 1997 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
| June 1, 1997 – June 30, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 1997 – March 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 1997 – February 28, 1997 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1997 – February 22, 1999 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| November 1, 1996 – November 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1996 – October 31, 1996 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| September 1, 1996 – September 30, 1996 | Monitoring, Repeat Minor (TCR) | Coliform (TCR) | — | Archived |
| August 1, 1996 – August 31, 1996 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| June 1, 1996 – June 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 1996 – February 29, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Dinoseb | — | Resolved |
| October 1, 1995 – October 31, 1995 | Monitoring, Repeat Minor (TCR) | Coliform (TCR) | — | Archived |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Simazine | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Picloram | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Diquat | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Endrin | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Heptachlor | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Chlordane | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Atrazine | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Aldicarb | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | 2,4-D | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Toxaphene | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| October 1, 1995 – December 31, 1995 | Monitoring, Regular | Methoxychlor | — | Resolved |
| August 1, 1995 – August 30, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Methoxychlor | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Toxaphene | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | 2,4-D | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Aldicarb | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Atrazine | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Chlordane | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Heptachlor | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Endrin | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Dinoseb | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Diquat | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Picloram | — | Resolved |
| July 1, 1995 – September 30, 1995 | Monitoring, Regular | Simazine | — | Resolved |
| June 1, 1995 – June 30, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 1995 – May 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Toxaphene | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | 2,4-D | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Aldicarb | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Atrazine | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Chlordane | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Heptachlor | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Endrin | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Dinoseb | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Diquat | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Simazine | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Picloram | — | Resolved |
| April 1, 1995 – June 30, 1995 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1995 – June 22, 1999 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Aldicarb | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Aldicarb sulfoxide | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Aldicarb sulfone | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 1995 – March 31, 1995 | Monitoring, Regular | Diquat | — | Resolved |
| July 1, 1994 – July 31, 1994 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Archived |
| July 1, 1994 – July 31, 1994 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| November 1, 1993 – November 30, 1993 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1993 – December 15, 1998 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 1993 – December 31, 1993 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Fluoride | — | Resolved |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Nitrate | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Fluoride | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Selenium | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Mercury | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Chromium | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Barium | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Arsenic | — | Archived |
| June 30, 1986 – June 30, 1989 | Monitoring, Regular | Cadmium | — | Archived |
| June 30, 1985 – June 30, 1989 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| October 1, 1979 – October 31, 1979 | Monitoring, Regular | Fluoride | — | Archived |
| October 1, 1979 – October 31, 1979 | Monitoring, Regular | Barium | — | Archived |
| October 1, 1979 – October 31, 1979 | Monitoring, Regular | Mercury | — | Archived |
Archived closed in EPA's records (typically due to age or a data correction)Unaddressed no corrective action on record yetResolved addressed and confirmed by the state
Enforcement actions
- March 31, 2026State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 13, 2026State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 5, 2026State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- January 20, 2026State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- January 20, 2026State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- December 22, 2025State Compliance achieved2 linked violations
- November 10, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 10, 2025State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- November 6, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 6, 2025State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- August 25, 2025State Compliance achieved2 linked violations
- August 5, 2025State Compliance achieved1 linked violation
- August 5, 2025State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- August 4, 2025State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- August 4, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- August 1, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 31, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 30, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 30, 2025State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- June 30, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 11, 2025State Compliance achieved1 linked violation
- June 11, 2025State Compliance achieved1 linked violation
- May 29, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 29, 2025State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- May 28, 2025State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- May 28, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- May 23, 2025State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- May 23, 2025State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- April 25, 2025State Compliance achieved1 linked violation
- February 26, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 17, 2024State Compliance achieved1 linked violation
- October 29, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 29, 2024State Boil Water Order1 linked violation
- October 24, 2024State Compliance achieved5 linked violations
- July 22, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 17, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 12, 2024State Compliance achieved2 linked violations
- June 12, 2024State Compliance achieved1 linked violation
- April 15, 2024State Compliance achieved1 linked violation
- March 19, 2024State Compliance achieved2 linked violations
- February 7, 2024State Compliance achieved21 linked violations
- February 7, 2024State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- January 29, 2024State Compliance achieved1 linked violation
- December 18, 2023State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 1, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 30, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 29, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 28, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 5, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 1, 2023State Compliance achieved1 linked violation
- July 25, 2023State Compliance achieved1 linked violation
- July 21, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 23, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 17, 2023State Compliance achieved1 linked violation
- December 20, 2022State Compliance achieved1 linked violation
- November 22, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 21, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 21, 2022State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- November 17, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 8, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 3, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 28, 2022State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- October 28, 2022State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 28, 2022State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- October 28, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 28, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 28, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 23, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 23, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 21, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 6, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 1, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 1, 2022State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- August 31, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 26, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 25, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 22, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 22, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 22, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 19, 2022State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- August 19, 2022State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- August 16, 2022State Compliance achieved5 linked violations
- August 12, 2022State Compliance Meeting conducted4 linked violations
- July 1, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 1, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 17, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 17, 2022State Compliance achieved1 linked violation
- April 1, 2022State Compliance Meeting conducted23 linked violations
- March 3, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 17, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 17, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 17, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 16, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 10, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 10, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 8, 2022State Compliance achieved3 linked violations
- February 7, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 2, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- January 25, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- January 11, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- January 6, 2022State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 30, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 28, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 15, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 10, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 8, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 6, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 3, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 2, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 30, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 30, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 29, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 24, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 23, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 23, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 22, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 22, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 19, 2021State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- November 19, 2021State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- November 8, 2021State Compliance achieved1 linked violation
- September 28, 2021State Compliance achieved1 linked violation
- August 1, 2021State Compliance achieved1 linked violation
- July 26, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 19, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 13, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 12, 2021State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- July 12, 2021State Public Notification issuedgeneral compliance action — not tied to a specific violation on record
- May 19, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 11, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 11, 2021State Public Notification issuedgeneral compliance action — not tied to a specific violation on record
- May 11, 2021State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- January 6, 2021State Compliance achieved1 linked violation
- July 29, 2020State Compliance achieved1 linked violation
- July 22, 2020State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 20, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 20, 2020State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- March 31, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 12, 2020State Compliance achieved1 linked violation
- August 13, 2019State Compliance achieved3 linked violations
- July 29, 2019State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- June 25, 2019State Compliance achieved2 linked violations
- June 25, 2019State Compliance achieved1 linked violation
- May 30, 2019State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 30, 2019State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- March 26, 2019State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 26, 2019State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 19, 2019State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 11, 2019State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 5, 2019State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 20, 2019State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 7, 2019State Compliance Meeting conducted4 linked violations
- December 24, 2018State Public Notification issuedgeneral compliance action — not tied to a specific violation on record
- December 24, 2018State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 24, 2018State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 21, 2018State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- September 12, 2018State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- September 12, 2018State Public Notification issuedgeneral compliance action — not tied to a specific violation on record
- May 18, 2018State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- May 18, 2018State Compliance achieved6 linked violations
- May 3, 2018State Compliance achieved3 linked violations
- January 31, 2018State Compliance achieved1 linked violation
- January 31, 2018State Compliance achieved21 linked violations
- November 2, 2017State Compliance achieved2 linked violations
- July 20, 2017State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- January 9, 2017State Compliance achieved1 linked violation
- December 2, 2015State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 17, 2015State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 16, 2015State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 23, 2015State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 4, 2015State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 3, 2015State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 3, 2014State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- October 6, 2014State Compliance achieved1 linked violation
- August 29, 2013State Compliance achieved1 linked violation
- February 4, 2013State Compliance achieved5 linked violations
- August 2, 2012State Compliance Meeting conducted1 linked violation
- August 2, 2012State Compliance Meeting conducted1 linked violation
- August 2, 2012State Compliance Meeting conducted1 linked violation
- August 2, 2012State Compliance achieved4 linked violations
- May 17, 2012State Compliance achieved10 linked violations
- November 21, 2011State Compliance Meeting conducted23 linked violations
- August 5, 2011State Compliance achieved5 linked violations
- April 19, 2011State Compliance achieved42 linked violations
- March 25, 2011State Compliance achieved24 linked violations
- January 6, 2011State Compliance Meeting conducted21 linked violations
- July 21, 2010State Compliance Meeting conducted21 linked violations
- July 14, 2010State Compliance Meeting conducted23 linked violations
- June 8, 2007State Compliance achieved2 linked violations
- November 13, 2006State Boil Water Order3 linked violations
- February 17, 2006State Boil Water Order1 linked violation
- April 2, 2002State Other1 linked violation
- March 22, 2002State Othergeneral compliance action — not tied to a specific violation on record
- March 1, 2002State Violation/Reminder Notice1 linked violation
- February 1, 2002State Othergeneral compliance action — not tied to a specific violation on record
- December 7, 2001State Othergeneral compliance action — not tied to a specific violation on record
- May 21, 2001State Othergeneral compliance action — not tied to a specific violation on record
- April 5, 2001State Compliance Meeting conducted2 linked violations
- April 4, 2001State Other2 linked violations
- March 8, 2001State Othergeneral compliance action — not tied to a specific violation on record
- February 13, 2001State Othergeneral compliance action — not tied to a specific violation on record
- December 13, 2000State Othergeneral compliance action — not tied to a specific violation on record
- September 28, 2000State Compliance achieved1 linked violation
- September 27, 2000State Othergeneral compliance action — not tied to a specific violation on record
- September 13, 2000State Compliance achieved19 linked violations
- September 6, 2000State Othergeneral compliance action — not tied to a specific violation on record
- August 3, 2000State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 11, 2000State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 23, 2000State Other1 linked violation
- June 15, 2000State Other1 linked violation
- June 13, 2000State Other16 linked violations
- April 20, 2000State Compliance Meeting conducted2 linked violations
- April 14, 2000State Othergeneral compliance action — not tied to a specific violation on record
- October 29, 1999State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- October 25, 1999State Violation/Reminder Notice7 linked violations
- July 2, 1999State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 22, 1999State Compliance achieved1 linked violation
- June 8, 1999State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 8, 1999State Othergeneral compliance action — not tied to a specific violation on record
- June 2, 1999State Othergeneral compliance action — not tied to a specific violation on record
- March 24, 1999State Othergeneral compliance action — not tied to a specific violation on record
- February 22, 1999State Compliance achieved1 linked violation
- December 15, 1998State Compliance achieved45 linked violations
- December 9, 1998State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 30, 1998State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 31, 1998State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- January 20, 1998State Othergeneral compliance action — not tied to a specific violation on record
- August 21, 1997State Violation/Reminder Notice4 linked violations
- August 4, 1997State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- April 16, 1997State Othergeneral compliance action — not tied to a specific violation on record
- July 26, 1996State Boil Water Order1 linked violation
- March 7, 1996State Formal Notice of Violation issued3 linked violations
- November 27, 1995State Othergeneral compliance action — not tied to a specific violation on record
- November 3, 1995State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- October 18, 1995State Boil Water Order2 linked violations
- August 31, 1995State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 28, 1995State Violation/Reminder Notice1 linked violation
- January 17, 1995State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- August 19, 1994State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- June 16, 1994State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 15, 1993State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- November 12, 1992State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 6, 1992State Violation/Reminder Notice9 linked violations
- March 11, 1992State Violation/Reminder Notice10 linked violations
- April 25, 1991State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 15, 1991State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 10, 1989State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
Common questions
Is NEW STUYAHOK WATER SYSTEM required to publish a Consumer Confidence Report?
- Yes. NEW STUYAHOK WATER SYSTEM is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.
When is NEW STUYAHOK WATER SYSTEM’s next Consumer Confidence Report due?
- NEW STUYAHOK WATER SYSTEM’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.
Does NEW STUYAHOK WATER SYSTEM have any open drinking water violations on record?
- As of August 1, 2026, EPA's federal records show 4 items for NEW STUYAHOK WATER SYSTEM that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.
What is a Consumer Confidence Report?
- A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.
Contact
WALCOTT, JERRY
907-693-3171
NEW STUYAHOK, AK 99636